You are on page 1of 36

BY

40 PM

DATE
57:
3:

THE UNDERLINE

SI
REVI ONS
PHASE II - PLANS
OCTOBER 2020

No.
dgn
KEYSRD01.
oadway\

PROJECT LIMITS:

FROM SW 19th AVENUE TO SW 13th STREET


l
Under
01- i oj
ne Pr \
ectr

PREPARED FOR:
DTPW -

FRIENDS OF THE UNDERLINE IN PARTNERSHIP WITH:


DB18-

MIAMI-DADE COUNTY TRANSPORTATION & PUBLIC WORKS DEPARTMENT

ONAL
\

CENSE NUM BER


UBALDO FRANK LENA
P:

MIAMI-DADE COUNTY PARKS, RECREATION, AND OPEN SPACES DEPARTMENT

CENSED PROFESSI

43953
MIAMI-DADE COUNTY

FL LI

DATE
LI
HONORABLE CARLOS A. GIMENEZ

A&P PROJECT
BOARD OF COUNTY COMMISSIONERS

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
BEGIN PROJECT

SCALE
END PROJECT

DESI
SW 19th AVENUE SW 13th STREET
LOCATION MAP
E.
AV

KEY SHEET
E.
th
19

AV

E.

N
SW

th

AV
17

th
SW

16

SW
20

h RD.
h RD.
13/

13
SW

t
h
10/

ST

5
-9
.

I
SW 25t
SW 26t
I
ne Phase I

US1
/S.DI
XIEHI
GHW

C W ORKS DEPT.
AY

NE PHASE I

DA
SW

FLORI
-
I95
l
:Underi

15
thR
SheetSet

D.

ON & PUBLI
UNDERLINE - PHASE II LOCATION PLAN

UNDERLI
SCALE: N.T.S.

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ott

G-000
Pl
BY
DATE
ABBREVIATIONS DRAWING LIST
ADA AMERICANS WITH DISABILITIES ACT G SERIES (GENERAL)

B/L BASE LINE G-000 KEY SHEET


BURIED ELECTRIC G-001 GENERAL NOTES
BE
G-002 DRAWING LIST
BFO BURIED FIBER OPTIC

ONS
BTV BURIED TV C SERIES (BICYLE/PEDESTRIAN PLANS) L SERIES (LANDSCAPE, /HARDSCAPE, FURNISHINGS)

SI
REVI
C/L CENTER LINE C-001 TYPICAL SECTION L-001 CONCEPTUAL PLANTING PLAN

CONC. CONCRETE C-002 TYPICAL SECTION L-002 CONCEPTUAL PLANTING PLAN


C-003 TYPICAL SECTION L-003 CONCEPTUAL PLANTING PLAN
EL. ELEVATION
C-004 TYPICAL SECTION L-004 CONCEPTUAL PLANTING PLAN
FTA FEDERAL TRANSIT ADMINISTRATION
C-005 TYPICAL SECTION L-005 CONCEPTUAL PLANTING PLAN
FFE FINISHED FLOOR ELEVATION C-006 TYPICAL SECTION L-006 CONCEPTUAL PLANTING PLAN
L-007

No.
FH FIRE HYDRANT C-007 TYPICAL SECTION CONCEPTUAL PLANTING PLAN
C-008 PROJECT LAYOUT L-008 CONCEPTUAL PLANTING PLAN
FDOT FLORIDA DEPARTMENT OF TRANSPORTATION
L-009 CONCEPTUAL PLANTING PLAN

NEERS CORP.
C-009 BICYCLE AND PEDESTRIAN PLAN

DA 33172
FPL FLORIDA POWER & LIGHT L-010
C-010 BICYCLE AND PEDESTRIAN PLAN CONCEPTUAL PLANTING PLAN
FM FORCE MAIN C-011 BICYCLE AND PEDESTRIAN PLAN L-011 CONCEPTUAL PLANTING PLAN

TE 200.DORAL,FLORI
FRIENDS FRIENDS OF THE UNDERLINE C-012 BICYCLE AND PEDESTRIAN PLAN L-012 CONCEPTUAL PLANTING PLAN

ON ENGI
C-013 BICYCLE AND PEDESTRIAN PLAN L-013 17th AVANUE PLAZA
GM GAS MAIN
dgn

C-014 BICYCLE AND PEDESTRIAN PLAN L-014 17th AVANUE PLAZA

COM
7283
GNNTRD02.

LT LEFT L-015 VIZCAYA STATION PLAZA

NG TRANSPORTATI
C-015 BICYCLE AND PEDESTRIAN PLAN

APCTE.
592-
MH MANHOLE C-016 BICYCLE AND PEDESTRIAN PLAN L-016 VIZCAYA STATION PLAZA

PH:305-
MAX. MAXIMUM C-017 BICYCLE AND PEDESTRIAN PLAN L-017 SIMPSON PARK RECREATION AREA

WWW.
h LANE,SUI
C-018 BICYCLE AND PEDESTRIAN PLAN L-018 SIMPSON PARK RECREATION AREA
oadway\

MDC MIAMI-DADE COUNTY


C-019 BICYCLE AND PEDESTRIAN PLAN L-019 PROPOSED PLAN SPECIES (HYDRIC HAMMOCK COMMUNITY)
PROS MIAMI-DADE COUNTY PARKS, RECREATION AND OPEN SPACES L-020
C-020 BICYCLE AND PEDESTRIAN PLAN PROPOSED PLAN SPECIES (HYDRIC HAMMOCK COMMUNITY)

A&P CONSULTI
W .35t
r

MDT MIAMI-DADE TRANSIT L-021


\

C-021 PAVEMENT DESIGN DETAILS PROPOSED PLAN SPECIES (HYDRIC HAMMOCK COMMUNITY)
ect

L-022

8935 N.
oj

MISC. MICELLANEOUS C-022 DRAINAGE DETAILS PROPOSED PLAN SPECIES (HYDRIC HAMMOCK COMMUNITY)
ne Pr

L-023 PROPOSED PLAN SPECIES (XERIC HAMMOCK COMMUNITY)


MIN. MINIMUM C-023 DRAINAGE DETAILS
L-024 PROPOSED PLAN SPECIES (XERIC HAMMOCK COMMUNITY)
l
Underi

NTS NOT TO SCALE L-025


S SERIES (SIGNING, MARKING, WAYFINDING) PROPOSED PLAN SPECIES (XERIC HAMMOCK COMMUNITY)
OE OVERHEAD ELECTRIC L-026

ONAL
PROPOSED PLAN SPECIES (XERIC HAMMOCK COMMUNITY)
01-

S-001 SIGNING & MARKING WAYFINDING PLAN

CENSE NUM BER


UBALDO FRANK LENA
OT L-027 PROPOSED PLAN SPECIES (PINELAND COMMUNITY)
OVERHEAD TELEPHONE

CENSED PROFESSI
DTPW -

S-002 SIGNING & MARKING WAYFINDING PLAN


L-028 PROPOSED PLAN SPECIES (PINELAND COMMUNITY)
OT OVERHEAD TELEPHONE S-003 SIGNING & MARKING WAYFINDING PLAN

43953
L-029 PROPOSED PLAN SPECIES (PINELAND COMMUNITY)
S-004 SIGNING & MARKING WAYFINDING PLAN
DB18-

OTV OVERHEAD TV L-030 PROPOSED PLAN SPECIES (PINELAND COMMUNITY)


S-005 SIGNING & MARKING WAYFINDING PLAN

FL LI
R RADIUS L-031 PROPOSED PLAN SPECIES (BUTTERFLY GARDEN)
\

S-006 SIGNING & MARKING WAYFINDING PLAN


P:

L-032

DATE
R/W RIGHT OF WAY PROPOSED PLAN SPECIES (BUTTERFLY GARDEN)
S-007 SIGNING & MARKING WAYFINDING PLAN

LI
L-033 PROPOSED PLAN SPECIES (BUTTERFLY GARDEN)
RT RIGHT OF WAY S-008 SIGNING & MARKING WAYFINDING PLAN

A&P PROJECT
SS S-009 SIGNING & MARKING WAYFINDING PLAN
SANITARY SEWER

UFL
M BR

REG
H SERIES (LIGHTING)

20
S-010 SIGNING & MARKING WAYFINDING PLAN

DATE
13/
SD STORM DRAIN H-001 LIGHTING NOTES AND LEGEND
S-011 SIGNING & MARKING WAYFINDING PLAN

10/

GNED BY

CHECKED BY
TEMP. TEMPORARY H-002 LIGHTING PLANS

DRAW N BY
S-012 SIGNING & MARKING WAYFINDING PLAN
H-003 LIGHTING PLANS

SCALE
WM WATER MAIN S-013 SW 19th AVENUE INTERSECTION DETAIL

DESI
H-004 LIGHTING PLANS
S-014 SW 17th AVENUE INTERSECTION DETAIL
H-005 LIGHTING PLANS
S-015 SW 16th AVENUE INTERSECTION DETAIL
H-006 LIGHTING PLANS
S-016 SW 26th AVENUE INTERSECTION DETAIL
H-007 LIGHTING PLANS
48 PM

ST
S-017 SW 25th ROAD INTERSECTION DETAIL
H-008 LIGHTING PLANS
S-018 SW 15th ROAD INTERSECTION DETAIL

NG LI
57:

H-009 LIGHTING PLANS


S-019 SIGNING & MARKING WAYFINDING NOTES & DETAILS
3:

H-010 LIGHTING PLANS


S-020 SIGNING & MARKING WAYFINDING NOTES & DETAILS
H-011 LIGHTING PLANS
H-012 LIGHTING PLANS

DRAW I
20

H-013 LIGHTING PLANS


13/

H-014 LOAD CENTER DETAILS


10/

H-015 LIGHT POLE DETAILS


H-016 BOLLARD DETAILS
H-017 LIGHTING DETAILS
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Under
SheetSet i

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ott

G-002
Pl
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
ADJACENT ADJACENT
VARIES UNDERLINE IMPROVEMENTS (VARIES) VARIES

TE 200.DORAL,FLORI
US-1

ON ENGI
(SW 1st AVE.
dgn

RESIDENTIAL) 12' 14'

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

PH:305-
t
oadway\

WWW.
2' 8' 2' 2' 10' 2' 4' BUFFER (MIN.)

h LANE,SUI
EXISTING 2' BUFFER (MIN.) EXISTING METRORAIL EXISTING
TRAVEL LANE CONCRETE COLUMNS TRAVEL LANE
\
ectr

A&P CONSULTI
W .35t
oj
ne Pr

PROPOSED PEDESTRIAN PATH

8935 N.
i

PROPOSED BICYCLE PATH


l
Under

PROPOSED LIGHT POLE AND FIXTURES


(REFER TO LIGHTING PLANS)
01-
DTPW -

ONAL
B B
L BICYCLE PATH
L PEDESTRIAN PATH

CENSE NUM BER


UBALDO FRANK LENA
R/W LINE R/W LINE

CENSED PROFESSI
DB18-

43953
\
P:

FL LI
EXISTING METRORAIL
CONCRETE COLUMNS

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
ONS
ASPHALT PAVEMENT,
PGP REFER TO "PAVEMENT PGP
48 PM

DESIGN DETAIL"

CAL SECTI
0.
015 00
.15
57:
3:
20

RESIN BONDED AGGREGATE;


13/

RESIN BONDED AGGREGATE;


REFER TO "PAVEMENT DESIGN DETAILS"
10/

REFER TO "PAVEMENT DESIGN DETAILS"

TYPI
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

TYPICAL SECTION 01 (TS-01)


SheetSet

ON & PUBLI
FROM NORTH SW 19th AVENUE TO SW 17TH AVENUE
SW 16TH AVENUE TO SOUTH OF VIZCAYA STATION

UNDERLI
NORTH OF VIZCAYA STATION TO SW 25TH ROAD

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
TE 200.DORAL,FLORI
R/W LINE

ON ENGI
dgn

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

EXISTING ASPHALT UNDERLINE IMPROVEMENTS (VARIES) ADJACENT VARIES

PH:305-
t

ROAD
oadway\

I-95

WWW.
h LANE,SUI
PROPOSED PEDESTRIAN PATH
PROPOSED BIKE PATH
\r

30' +/- VARIES FROM 38' TO 47' EXISTING


ect

A&P CONSULTI
W .35t
TRAVEL LANE
oj
ne Pr

8935 N.
l
Underi

R/W LINE 10' 2' 8' 2' 10' 2'


01-

NORTHBOUND
LANE
DTPW -

ONAL

CENSE NUM BER


SW 1st AVE.

UBALDO FRANK LENA


B
L PEDESTRIAN PATH

CENSED PROFESSI
DB18-

43953
EXISTING METRORAIL
\

CONCRETE COLUMNS
P:

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
ONS
PGP

0.
015 0.
015
49 PM

CAL SECTI
57:

PROPOSED LIGHT POLE AND FIXTURES


3:

REFER TO LIGHTING PLANS

RESIN BONDED AGGREGATE;


REFER TO "PAVEMENT DESIGN DETAILS"
20
13/

ASPHALT PAVEMENT,
10/

REFER TO "PAVEMENT DESIGN DETAIL"

STONE PAVER SHOULDER;

TYPI
REFER TO "PAVEMENT DESIGN DETAILS"

ASPHALT PAVEMENT,
I
ne Phase I

REFER TO "PAVEMENT DESIGN DETAIL"

RESIN BONDED AGGREGATE;

C W ORKS DEPT.
NE PHASE I
REFER TO "PAVEMENT DESIGN DETAILS"

DA
FLORI
l
:Underi

TYPICAL SECTION 02 (TS-02)


SheetSet

FROM SW 17TH AVENUE TO NW 16TH AVENUE

ON & PUBLI
FROM SW 25TH ROAD TO SW 24TH ROAD

UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
TE 200.DORAL,FLORI
ON ENGI
dgn

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

PH:305-
t
oadway\

WWW.
h LANE,SUI
EXISTING TREES (TO REMAIN)
\
ectr

A&P CONSULTI
W .35t
oj

PROPOSED BICYCLE PATH


*
ne Pr

8935 N.
ADJACENT
i

VISCAYA STATION 2' 10' 2' VARIES


l
Under

US-1
01-
DTPW -

ONAL

CENSE NUM BER


UBALDO FRANK LENA
B
L BICYCLE PATH

CENSED PROFESSI
DB18-

43953
\
P:

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
PGP

0.
015

ONS
49 PM

CAL SECTI
PROPOSED LIGHT POLE AND FIXTURES
57:

RESIN BONDED AGGREGATE; REFER TO LIGHTING PLANS


3:

REFER TO "PAVEMENT DESIGN DETAILS"


ASPHALT PAVEMENT,
REFER TO "PAVEMENT DESIGN DETAIL"
RESIN BONDED AGGREGATE;
20

REFER TO "PAVEMENT DESIGN DETAILS"


13/
10/

SIGNING & MARKING WILL ENCORAGE PEDESTRIANS TO


*

TYPI
WALK IN VIZCAYA STATION VIA THE "PEDESTRIAN SPUR"
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

TYPICAL SECTION 03 (TS-03)


SheetSet

AT VIZCAYA STATION

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
TE 200.DORAL,FLORI
ON ENGI
dgn

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

EXISTING ASPHALT 22' EXISTING

PH:305-
t

ROAD UNDERLI MP
NEI ROVEMENTS METRORAIL
oadway\

WWW.
h LANE,SUI
4'-8" TO 6'-10" WIDE CONT. PLANTER (IF PLANTED AREA IS LESS
THAN 4' USE A SMALL TREE OR PALM AND PLACE IN CENTER)
\
ectr

PROPOSED SHARED PATH (SEE NOTE 1)

A&P CONSULTI
W .35t
oj
ne Pr

8935 N.
li

R/W LINE 10' 2' 2'


Under

PROPOSED WALL-MOUNTED LIGHTING


NORTHBOUND VARIES
01-

LANE
EXISTING METRORAIL NOSE ABATEMENT WALL
DTPW -

ONAL
SW 1st AVE.
TO REMAIN AND BE PROTECTED AT ALL TIMES

CENSE NUM BER


UBALDO FRANK LENA
CENSED PROFESSI
B
L BICYCLE PATH
DB18-

43953
\
P:

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
ASPHALT PAVEMENT,

SCALE

DESI
REFER TO "PAVEMENT DESIGN DETAIL"

PGP

ONS
CONDITION VARIES
00
.15
49 PM

CAL SECTI
57:
3:

RESIN BONDED AGGREGATE;


REFER TO "PAVEMENT DESIGN DETAILS"
20
13/
10/

TYPI
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

TYPICAL SECTION 04 (TS-04)


SheetSet

FROM NORTH OF 24TH ROAD TO 380' NORTH OF SW 19TH ROAD

ON & PUBLI
NOTE 1: THE PROPOSED DIMENSIONS AVOID REMOVING

UNDERLI
EXISTING TREES BETWEEN SW 1ST AVENUE AND THE

TRANSPORTATI
EXISTING M-PATH

DADE
as

- 9' FROM SW 24TH ROAD TO SW 22ND ROAD


ed By: MRoj

-
AM I
- 5' FROM SW 22ND ROAD TO SW 21ST ROAD

MI
- 10' FROM SW 21ST ROAD TO SW 20TH ROAD
- 12' FROM SW 20TH ROAD TO 380' NORTH OF SW 19TH ROAD SHEET NUMBER
ot
Pl t
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
TE 200.DORAL,FLORI
ON ENGI
EXISTING ASPHALT 30' EXISTING
dgn

ROAD UNDERLI MP
NEI ROVEMENTS METRORAIL

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

4'-8" TO 6'-10" WIDE CONT. PLANTER (IF PLANTED AREA IS LESS

PH:305-
t

R/W LINE
oadway\

WWW.
THAN 4' USE A SMALL TREE OR PALM AND PLACE IN CENTER)

h LANE,SUI
PROPOSED BIKE PATH
PROPOSED PEDESTRIAN PATH
\
ectr

A&P CONSULTI
W .35t
oj

10' 2' 8' 2' 6' 2'


ne Pr

8935 N.
NORTHBOUND PROPOSED WALL-MOUNTED LIGHTING
li

LANE
Under

SW 1st AVE. EXISTING METRORAIL NOSE ABATEMENT WALL


TO REMAIN AND BE PROTECTED ALL TIMES
01-
DTPW -

ONAL

CENSE NUM BER


UBALDO FRANK LENA
CENSED PROFESSI
DB18-

43953
\
P:

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE
CONDITION VARIES

DESI
00
.15 00
.15

ONS
49 PM

CAL SECTI
57:

RESIN BONDED AGGREGATE;


3:

REFER TO "PAVEMENT DESIGN DETAILS"

ASPHALT PAVEMENT,
REFER TO "PAVEMENT DESIGN DETAIL"

STONE PAVER SHOULDER;


20
13/

REFER TO "PAVEMENT DESIGN DETAILS"


10/

ASPHALT PAVEMENT,
REFER TO "PAVEMENT DESIGN DETAIL"

TYPI
RESIN BONDED AGGREGATE;
I
ne Phase I

REFER TO "PAVEMENT DESIGN DETAILS"

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

TYPICAL SECTION 05 (TS-05)


SheetSet

FROM 380' NORTH OF SW 19TH ROAD TO SW 17TH ROAD

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
SI
REVI
No. ONS
NEERS CORP.
DA 33172
TE 200.DORAL,FLORI
ON ENGI
dgn

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

EXISTING ASPHALT 30 EXISTING

PH:305-
t
oadway\

ROAD UNDERL MP
NEI
I ROVEMENTS METRORAIL

WWW.
h LANE,SUI
\
ectr

A&P CONSULTI
4'-8" TO 6'-10" WIDE CONT. PLANTER (IF PLANTED AREA IS LESS

W .35t
oj

THAN 4' USE A SMALL TREE OR PALM AND PLACE IN CENTER)


ne Pr

8935 N.
PROPOSED BIKE PATH
li

PROPOSED PEDESTRIAN PATH


Under

10' 2' 8' 2' 6' 2'


01-

NORTHBOUND EXISTING METRORAIL NOSE ABATEMENT WALL


DTPW -

ONAL
LANE TO REMAIN AND BE PROTECTED ALL TIMES

CENSE NUM BER


UBALDO FRANK LENA
SW 1st AVE.

CENSED PROFESSI
PROPOSED WALL-MOUNTED LIGHTING
DB18-

43953
\
P:

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
ONS
0
.15 00
.15
0 5ME
' TRORALS
I ETBA MI
CK( )
N.
50 PM

CAL SECTI
PROPOSED CONCRETE RETAINING/SCREENING WALL (DESIGNED
PGP
57:

AND BUILT WITHOUT IMPACTING ADJACENT METRORAIL WALL


3:

AND CHAIN-LINK; REMOVE EXISTING CONCRETE RETAINING WALL


AND CHAIN-LINK WITHOUT IMPACTING METRORAIL OPERATIONS)
5'
RESIN BONDED AGGREGATE;
REFER TO "PAVEMENT DESIGN DETAILS"
20
13/

ASPHALT PAVEMENT,
10/

REFER TO "PAVEMENT DESIGN DETAIL"

TYPI
STONE PAVER SHOULDER;
REFER TO "PAVEMENT DESIGN DETAILS"

ASPHALT PAVEMENT,
I
ne Phase I

REFER TO "PAVEMENT DESIGN DETAIL"


RESIN BONDED AGGREGATE;

C W ORKS DEPT.
REFER TO "PAVEMENT DESIGN DETAILS"

NE PHASE I

DA
FLORI
l
:Underi

TYPICAL SECTION 06 (TS-06)


SheetSet

FROM SW 17th ROAD TO SIMPSON PARK

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
R/W LINE

SW 1ST AVENUE UNDERLI


NEI
MPROVEMENTS(
VARI
ES) SIMPSON PARK

SIONS
EXISTING VARIES FROM 38' TO 47' 30' +/- VARIES (9' TO 70')

REVI
TRAVEL LANE

4' BUFFER (MIN.) 14'

2' 10' 2' 8'


PROPOSED PROPOSED
BIKE PEDESTRIAN

No.
PATH PATH

B
L BICYCLE PATH

NEERS CORP.
DA 33172
EXISTING METAL

TE 200.DORAL,FLORI
PICKET FENCE
EXISTING METRORAIL
CONCRETE COLUMNS

ON ENGI
dgn

COM
7283
d01.

NG TRANSPORTATI

APCTE.
592-
ypr

PH:305-
t
oadway\

WWW.
h LANE,SUI
\
ectr

A&P CONSULTI
W .35t
oj

PGP
ne Pr

8935 N.
0.
015
l
Under
01- i

PROPOSED LIGHT POLE AND FIXTURES


DTPW -

ONAL
REFER TO LIGHTING PLANS.

CENSE NUM BER


UBALDO FRANK LENA
RESIN BONDED AGGREGATE;

CENSED PROFESSI
REFER TO "PAVEMENT DESIGN DETAILS"
DB18-

43953
ASPHALT PAVEMENT,
REFER TO "PAVEMENT DESIGN DETAIL"
\
P:

FL LI
RESIN BONDED AGGREGATE;

DATE
REFER TO "PAVEMENT DESIGN DETAILS"

LI
A&P PROJECT
TYPICAL SECTION 07 (TS-07)

UFL
M BR

REG
20
DATE
ADJACENT TO SIMPSON (HAMMOCK) PARK

13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
R/W LINE
EASEMENT LINE

ONS
EXISTING TREES (TO REMAIN)
50 PM

PROPOSED SHARED PATH

CAL SECTI
57:

PARKING LOT 2' 6' 2'


3:
20

B
L PATH
13/
10/

TYPI
EXISTING FENCE
(TO REMAIN)

EXISTING FENCE
I
ne Phase I

WALL BARRIER

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

PGP
SheetSet

0.
015

ON & PUBLI
RESIN BONDED AGGREGATE;
REFER TO "PAVEMENT DESIGN DETAILS"
PROPOSED LIGHT POLE AND FIXTURES
ASPHALT PAVEMENT, REFER TO LIGHTING PLANS.

UNDERLI
REFER TO "PAVEMENT DESIGN DETAIL"

TRANSPORTATI
RESIN BONDED AGGREGATE;
REFER TO "PAVEMENT DESIGN DETAILS"

DADE
as
ed By: MRoj

TYPICAL SECTION 08 (TS-08)

-
AM I
FROM SW 15th ROAD TO SW 13th STREET

MI
SHEET NUMBER
ot
Pl t
BY
51 PM

DATE
57:

END PROJECT
3:

-5
SB

STA. 2592+15.93 SB
-6

SB
-7

B/L SURVEY
TS-08
C-020

ONS
TS-07
N

SI
TS-06 SW 13th RD. S-012

REVI
S
0 200 800 W
15 H-013
th
R
Feet D C-019
TS-05 .

S
W
1
S-011

No.
7
S

th
W

W
15 H-012

R
1
th
dgn

NEERS CORP.
D
8

DA 33172
-8
SB 5
E2 50

R
-8 E

th

.
SB B-8
S

C-019
PLAYRD01.

D
.

R
W
MPSO N

D
SI

TE 200.DORAL,FLORI
.
TS-04

1
PARK S-011

9
S

ON ENGI
th
W
oadway\

R
2

COM
H-012

7283
C-018

D
0
S

NG TRANSPORTATI
.
th

APCTE.
W

592-
\r

R
ect

S-010

PH:305-
D
1
S
oj

WWW.
s
TS-02

h LANE,SUI
W

t
ne Pr

R
2
C-018 H-011

D
2
i

S
l

.
Under

A&P CONSULTI
W .35t
R
2
S-010

D
3
C-017
01-

rd

8935 N.
W
DTPW -

H-011

R
2
S-009

D
4
S

.
th
W
TS-01
DB18-

H-010

R
2

D
5
C-017

ONAL
.
th
S
\

CENSE NUM BER


UBALDO FRANK LENA
P:

CENSED PROFESSI
S-009

D
6

.
S

th

43953
W
5
-9W2
SB
-9
SB
9E
25

H-010

R
-
SB

C-016

D
TS-03

FL LI
.
th
S
W
S-008

DATE
R

LI
2

D
8
C-016

.
th
H-009

A&P PROJECT
R

UFL
M BR

REG
S-008

20
.
S

DATE
13/
V

W
TS-01

IZ

10/

GNED BY
H-009

CHECKED BY
S
C-015

DRAW N BY
C

0
A

th
S

SCALE
Y

DESI
W

1
S-007

R
st

D
S
3

.
T
2
C-015

R
n

A
H-008

PROJECT LAYOUT
TS-02

IO

.
R
S-007

N
.
SB
-10
C-014 H-008
5

NE
W2

TS-01 -11
SB

LI
-11
SB 5
E2
-11
SB

W
R/ S-006
Y C-014
VE
. UR .
LS UE
SW 16th AVE.

E /
U B
V EN H-007

S
N S-006
tA C-013
SW 17th AVE.

W
1s E
20

V N
A SW LI
13/

3
C-013
rd

2
H-007 /W
10/

n
3 S-005 R

d
W

R
S

D
C-012 S-005

.
H-006
BEGIN PROJECT
I
ne Phase I

STA. 2471+61.27 H-006


C-012 S-004 NE
LI
B/L SURVEY W

C W ORKS DEPT.
R/

NE PHASE I

DA
C-011 S-004 H-005

FLORI
SW 19th AVE.
l
:Underi

C-011 S-003 H-005


SheetSet

C-010 H-004

ON & PUBLI
S-003
SW 17th AVE.

C-010 S-002 H-004


SR5/SOUT XI
HDI GHWAY
EHI

UNDERLI
H-003

TRANSPORTATI
C-009 S-002
LEGEND
NATOM A ST.

DADE
AN SHEET NUMBER
as

C-009 C-XXX DENOTES THE PL


H-003
ed By: MRoj

S-001

-
AM I
S-001

MI
H-002

H-002 SHEET NUMBER


ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS

ONS
NUMBER POINT NORTH EAST SPEED (MPH)

SI
REVI
POT 10+61.27

BIKE01

POT 11+73.87

No.
NEERS CORP.
DA 33172
POT 12+00.73

TE 200.DORAL,FLORI
CC 513850.608 911014.3014

ON ENGI
DGN

PC 12+82.40 513663.6887 911090.8859

COM
7283
CURCRD01.

NG TRANSPORTATI
BIKE021 PI 12+94.23 513668.1737 911101.8325 0-6° 42' 11.42" 028° 21' 51.29" 11.83 23.63 202 0.35

APCTE.
592-
PT 13+06.03 513673.9059 911112.1807

PH:305-
WWW.
h LANE,SUI
BIKE02
oadway\

CC 513499.623 911208.7198

A&P CONSULTI
PC 13+06.03 513673.9059 911112.1807

W .35t
\r

028° 45' 28.76" 11.68 23.33 199.23 0.34


ect

BIKE022 PI 13+17.71 513679.5648 911122.3968 006° 42' 34.13"

8935 N.
oj

PT 13+29.36 513683.9914 911133.2042


l
Underine Pr

CC 513863.2998 911834.8107

ONAL

CENSE NUM BER


UBALDO FRANK LENA
01-

PC 20+46.58 513955.8383 911796.9078

CENSED PROFESSI
DTPW -

BKE023 PI 20+63.85 513962.3848 911812.891 019° 35' 55.87" 057° 17' 44.81" 17.27 34.21 100 1.48

43953
PT 20+80.79 513963.1908 911830.1441
DB18-

FL LI
\

CC 514063.0758 911825.4779
P:

DATE
LI
PC 20+80.79 513963.1908 911830.1441

A&P PROJECT
BIKE024 PI 20+98.06 513963.9968 911847.3965 -19° 35' 57.01" 057° 17' 57.49" 17.27 34.2 99.99 1.48

UFL
M BR

REG
20
DATE
PT 21+14.99 513970.5432 911863.379

13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE
CC 514121.7913 911995.1938

DESI
BIKE025 PC 22+94.30 514038.5068 912029.3069

PROJECT CONTROL
PI 23+08.38 514043.8446 912042.3387 -17° 47' 10.68" 063° 39' 43.12" 14.08 27.94 90 1.1

PT 23+22.24 514052.908 912053.1171


52 PM
57:

CC 513968.7175 912123.9122
3:

PC 23+22.24 514052.908 912053.1171

BIKE026 PI 23+39.45 514063.9818 912066.2862 017° 46' 49.11" 052° 05' 13.45" 17.21 34.14 110 1.34
20

PT 23+56.38 514070.5052 912082.2078


13/
10/

CC 514103.7614 912260.9677

PC 25+34.40 514137.9991 912246.9399

BIKE027 PI 25+57.53 514146.7694 912268.3454 064° 01' 38.83" 154° 51' 12.45" 23.13 41.35 37 6.64
I
ne Phase I

PT 25+75.74 514131.3666 912285.6042

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Under
SheetSet i

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

ONS
CC 514166.0595 912373.7858

SI
REVI
PC 26+72.20 514148.4025 912394.212

BIKE031 PI 26+80.14 514154.4076 912399.403 -32° 45' 56.78" 212° 12' 23.73" 7.94 15.44 27 1.14

PT 26+87.64 514162.2667 912400.5181

CC 514152.1523 912471.8041

PC 26+87.64 514162.2667 912400.5181

No.
BIKE032 PI 27+28.90 514203.1213 912406.3147 059° 38' 05.44" 079° 34' 38.90" 41.26 74.94 72 10.99

PT 27+62.58 514218.7723 912444.4953

NEERS CORP.
DA 33172
BIKE03

CC 514305.5768 912867.1752

TE 200.DORAL,FLORI
PC 31+86.60 514379.599 912836.832

ON ENGI
BIKE033 PI 32+15.04 514390.3863 912863.1476 039° 08' 29.59" 071° 37' 11.01" 28.44 54.65 80 4.91
DGN

COM
PT 32+41.25 514382.1414 912890.3671

7283
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
PH:305-
WWW.
h LANE,SUI
POT 33+87.44
oadway\

CC 514498.7023 912993.302

A&P CONSULTI
W .35t
PC 33+87.44 514425.357 913053.6796
\
ectr

8935 N.
BIKE041 PI 33+99.28 514432.8831 913062.8222 -14° 12' 38.64" 060° 18' 40.85" 11.84 23.56 95 0.74
oj
ne Pr

PT 34+11.00 514442.4234 913069.8375


l
Underi

CC 519027.1726 914727.1814

ONAL
PC 67+28.31 515680.2609 916124.7904

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
BIKE0410 PI 68+59.87 515730.9572 916246.195 0-4° 09' 17.38" 001° 34' 46.93" 131.56 263.01 3627 2.39
DTPW -

PT 69+91.32 515790.3163 916363.6075

43953
DB18-

FL LI
BIKE04 CC 515847.4321 916334.7321
\

PC 69+91.32 515790.3163 916363.6075


P:

DATE
LI
BIKE0411 PI 70+26.64 515806.2506 916395.1256 -57° 46' 56.27" 089° 31' 28.76" 35.32 64.54 64 9.1

A&P PROJECT
PT 70+55.87 515841.411 916398.4482

UFL
M BR

REG
20
DATE
13/
CC 515834.4491 916472.12

10/

GNED BY

CHECKED BY
PC 70+55.87 515841.411 916398.4482

DRAW N BY
SCALE
BIKE0412 PI 70+93.62 515878.9979 916402.0001 054° 03' 39.08" 077° 25' 36.22" 37.75 69.82 74 9.07

DESI
PT 71+25.69 515898.1829 916434.5168

PROJECT CONTROL
CC 518295.8896 915019.8591
52 PM

PC 71+25.69 515898.1829 916434.5168


57:

BIKE0413 PI 72+08.62 515940.3236 916505.9413 0-3° 24' 45.08" 002° 03' 29.13" 82.93 165.81 2783.93 1.23
3:

PT 72+91.50 515986.6412 916574.7307

CC 521233.6474 912891.913
20

PC 72+91.50 515986.6412 916574.7307


13/

BIKE0414 PI 73+86.95 516041.4806 916652.8619 0-1° 42' 22.37" 000° 53' 37.62" 95.46 190.9 6410.48 0.71
10/

PT 74+82.40 516098.6221 916729.3256

CC 516660.7525 917339.086

FRONT. RD. (N) PC 83+08.42 516602.0863 917384.189


I
ne Phase I

BIKE0415 PI 83+25.80 516612.6769 917397.9642 -26° 25' 41.63" 077° 25' 36.22" 17.38 34.13 74 2.01

PT 83+42.56 516628.2917 917405.5863

C W ORKS DEPT.
NE PHASE I

DA
FLORI
CC 516591.4443 917481.0732
l
:Underi

PC 83+42.56 516628.2917 917405.5863

BIKE0416 PI 83+61.83 516645.6076 917414.0387 025° 50' 20.75" 068° 12' 33.34" 19.27 37.88 84 2.18

PT 83+80.44 516657.5083 917429.1931


SheetSet

ON & PUBLI
CC 514315.6477 913242.2437

PC 34+11.00 514442.4234 913069.8375

UNDERLI
BIKE042 PI 34+71.35 514491.0384 913105.5857 031° 29' 41.04" 026° 46' 25.42" 60.34 117.63 214 8.35

TRANSPORTATI
PT 35+28.64 514513.8163 913161.4652

DADE
as
ed By: MRoj

-
AM I
78

MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

ONS
CURVE CONTROL STATION COORDINATES DESIGN
LINE DELTA D T L R e TIE & REMARKS

SI
REVI
NUMBER POINT NORTH EAST SPEED (MPH)

CC 513723.3588 913903.2967

PC 39+17.21 514660.4929 913521.2971

BIKE043 PI 39+68.67 514679.9174 913568.95 005° 49' 18.90" 005° 39' 41.90" 51.46 102.83 1012 1.31

No.
PT 40+20.04 514694.408 913618.3274

NEERS CORP.
DA 33172
CC 514790.3615 913590.1684

BIKE044 PC 40+20.04 514694.408 913618.3274

TE 200.DORAL,FLORI
PI 40+39.12 514699.7793 913636.6302 -21° 35' 54.62" 057° 17' 44.81" 19.07 37.7 100 1.8

ON ENGI
DGN

BIKE04 PT 40+57.74 514711.5106 913651.6708

COM
7283
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
CC 514632.6598 913713.1732

PH:305-
WWW.
h LANE,SUI
PC 40+57.74 514711.5106 913651.6708
oadway\

BIKE045 PI 40+71.51 514719.9792 913662.5282 015° 40' 48.31" 057° 17' 44.81" 13.77 27.37 100 0.94

PT 40+85.11 514725.1982 913675.2702

A&P CONSULTI
W .35t
\
ectr

8935 N.
oj

CC 515107.8403 914839.0099
ne Pr

PC 53+07.05 515188.3488 914806.0344


l
Underi

BIKE046 PI 53+44.62 515202.589 914840.8012 046° 42' 47.98" 065° 51' 25.98" 37.57 70.93 87 7.77

ONAL
PT 53+77.98 515187.0448 914875.005

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
DTPW -

43953
CC 515257.1454 914906.8627
DB18-

PC 53+77.98 515187.0448 914875.005

FL LI
BIKE047 PI 54+11.25 515173.28 914905.2935 -46° 44' 08.26" 074° 24' 36.37" 33.27 62.81 77 6.88
\
P:

DATE
LI
PT 54+40.79 515185.9021 914936.0757

A&P PROJECT

UFL
M BR

REG
20
CC 516011.1032 914937.4114

DATE
13/
10/

GNED BY
PC 57+55.09 515305.1473 915226.8853

CHECKED BY
DRAW N BY
BIKE048 PI 57+87.98 515317.6226 915257.3095 0-4° 56' 07.57" 007° 30' 33.40" 32.88 65.72 763 0.71

SCALE

DESI
PT 58+20.82 515332.6691 915286.5476

PROJECT CONTROL
CC 515033.5971 915440.4563
52 PM

PC 58+20.82 515332.6691 915286.5476


57:

BIKE049 PI 58+35.39 515339.3376 915299.5057 004° 57' 42.73" 017° 02' 04.29" 14.57 29.13 336.35 0.32
3:

PT 58+49.95 515344.8603 915312.992


10/ 20
13/ I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Under
SheetSet i

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
79

MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN

ONS
LINE DELTA D T L R e TIE & REMARKS

SI
NUMBER POINT NORTH EAST SPEED (MPH)

REVI
POT 84+22.27

CC 516995.4251 917447.9278

BIKE051 PC 85+44.49 516779.2001 917597.6467

No.
PI 85+51.38 516783.1206 917603.3088 0-1° 00' 00.00" 021° 47' 07.68" 6.89 13.77 263 0.09

NEERS CORP.
DA 33172
PT 85+58.27 516787.3321 917608.7579

TE 200.DORAL,FLORI
BIKE05 CC 516894.9654 917627.0116

ON ENGI
PC 86+38.53 516836.4145 917672.2641
DGN

COM
BIKE052 PI 86+61.57 516850.5068 917690.4977 -34° 35' 40.62" 077° 25' 36.22" 23.04 44.68 74 3.51

7283
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
PT 86+83.21 516872.4598 917697.5062

PH:305-
WWW.
h LANE,SUI
CC 516849.9542 917768.0009
oadway\

PC 86+83.21 516872.4598 917697.5062

A&P CONSULTI
W .35t
BIKE053 PI 86+95.60 516884.2615 917701.274 019° 00' 28.20" 077° 25' 36.23" 12.39 24.55 74 1.03
\
ectr

8935 N.
PT 87+07.76 516894.1926 917708.68
i oj
ne Pr

POT 87+07.76
l
Under

ONAL

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
DTPW -

POT 88+28.79

43953
DB18-

FL LI
CC 517037.6752 917816.5174
\
P:

DATE
PC 88+30.70 516963.6752 917816.5429

LI
BIKE061 PI 88+56.05 516963.6839 917841.8996 -37° 49' 43.98" 077° 25' 36.22" 25.36 48.86 74 4.22

A&P PROJECT

UFL
M BR

REG
PT 88+79.56 516979.2422 917861.9222

20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
CC 519082.6502 920342.2776

SCALE

DESI
PC 121+34.30 518987.5198 920415.423

BIKE0610 PI 121+65.12 519006.306 920439.8558 -28° 48' 30.09" 047° 44' 47.06" 30.82 60.34 120 3.89

PROJECT CONTROL
PT 121+94.64 519034.5409 920452.2119
53 PM
57:

CC 518960.3725 920621.6934
3:

PC 121+94.64 519034.5409 920452.2119

BIKE0611 PI 122+33.88 519070.484 920467.9413 023° 56' 50.78" 030° 58' 14.63" 39.23 77.32 185 4.11

PT 122+71.96 519096.9486 920496.906


20
13/

BIKE06
10/

CC 518432.523 921103.9812

PC 122+71.96 519096.9486 920496.906

BIKE0612 PI 123+18.99 519128.6683 920531.6223 005° 58' 55.12" 006° 21' 58.29" 47.03 93.96 900 1.23
I

PT 123+65.93 519156.5973 920569.4552


ne Phase I

C W ORKS DEPT.
NE PHASE I
CC 519480.0161 920330.701

DA
FLORI
PC 123+65.93 519156.5973 920569.4552
l
:Underi

BIKE0613 PI 123+86.07 519168.5625 920585.6634 0-5° 44' 16.72" 014° 15' 09.78" 20.15 40.26 402 0.5

PT 124+06.19 519182.0883 920600.5941


SheetSet

ON & PUBLI
CC 519119.0933 920657.6613

PC 124+06.19 519182.0883 920600.5941

UNDERLI
BIKE0614 PI 124+31.17 519198.8643 920619.1127 032° 45' 48.71" 067° 24' 24.01" 24.99 48.61 85 3.6

TRANSPORTATI
PT 124+54.79 519202.9497 920643.764

DADE
as
ed By: MRoj

-
AM I
80

MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

ONS
CC 519225.64 920640.0036

SI
REVI
PC 124+54.79 519202.9497 920643.764

BIKE0615 PI 124+59.75 519203.7601 920648.6537 -24° 19' 19.17" 249° 06' 52.24" 4.96 9.76 23 0.53

PT 124+64.56 519206.5124 920652.7756

CC 519209.0073 920651.1096

No.
PC 124+64.56 519206.5124 920652.7756

BIKE0616 PI 124+69.18 519209.0815 920656.6232 -114° 04' 41.65" 1549° 50' 21.85" 4.63 5.97 3 2.51

NEERS CORP.
DA 33172
PT 124+70.53 519211.5462 920652.7078

BIKE06

TE 200.DORAL,FLORI
CC 517145.6066 917955.418

ON ENGI
PC 90+55.46 517087.1736 918000.8228
DGN

BIKE062 PI 90+78.55 517101.3426 918019.0573 -34° 39' 43.31" 077° 25' 36.22" 23.09 44.77 74 3.52

COM
7283
CURCRD01.

NG TRANSPORTATI

APCTE.
PT 91+00.23 517123.3675 918025.9972

592-
PH:305-
WWW.
h LANE,SUI
CC 517098.1231 918106.1141
oadway\

PC 91+00.23 517123.3675 918025.9972

BIKE063 PI 91+26.60 517148.5195 918033.9224 034° 51' 30.24" 068° 12' 33.34" 26.37 51.11 84 4.04

A&P CONSULTI
W .35t
r

PT 91+51.33 517164.6287 918054.8012


\
ect

8935 N.
oj
ne Pr

CC 518256.2056 917832.7108
li

PC 96+39.26 517462.6158 918441.1639


Under

ONAL
BIKE064 PI 96+65.27 517478.4387 918461.8014 0-2° 58' 45.50" 005° 43' 46.48" 26.01 52 1000 0.34

CENSE NUM BER


UBALDO FRANK LENA
01-

PT 96+91.26 517495.313 918481.5886

CENSED PROFESSI
DTPW -

43953
CC 517404.7644 918558.807
DB18-

FL LI
PC 96+91.26 517495.313 918481.5886
\
P:

BIKE065 PI 96+94.37 517497.3328 918483.9571 002° 59' 48.43" 048° 08' 47.22" 3.11 6.22 119 0.04

DATE
LI
PT 96+97.48 517499.2261 918486.428

A&P PROJECT

UFL
M BR

REG
20
CC 519180.3043 919855.0296

DATE
13/
PC 118+06.30 518781.8291 920160.3516

10/

GNED BY

CHECKED BY
DRAW N BY
BIKE066 PI 118+23.31 518792.1742 920173.853 0-3° 52' 52.32" 011° 24' 48.61" 17.01 34.01 502 0.29

SCALE

DESI
PT 118+40.30 518803.4096 920186.6233

PROJECT CONTROL
CC 514863.2831 923653.1637
53 PM

PC 118+40.30 518803.4096 920186.6233

BIKE067 PI 119+55.28 518879.3604 920272.9503 002° 30' 36.95" 001° 05' 30.35" 114.98 229.93 5248 1.26
57:
3:

PT 120+70.23 518951.4574 920362.521

CC 518787.8676 920494.1972
20

PC 120+70.23 518951.4574 920362.521


13/
10/

BIKE068 PI 120+85.73 518961.1734 920374.5917 008° 26' 24.06" 027° 17' 01.05" 15.5 30.93 210 0.57

PT 121+01.16 518969.0124 920387.9577

CC 519197.5985 920253.8944
I
ne Phase I

PC 121+01.16 518969.0124 920387.9577

BIKE069 PI 121+17.76 518977.4063 920402.2698 0-7° 09' 55.30" 021° 37' 16.01" 16.59 33.14 265 0.52

C W ORKS DEPT.
NE PHASE I
PT 121+34.30 518987.5198 920415.423

DA
FLORI
l
:Underi

POT 124+70.53
SheetSet

ON & PUBLI
BIKE07 POT 125+52.64

CC 519856.0907 920369.5867

UNDERLI
PC 130+11.96 519679.472 920922.8552

TRANSPORTATI
BIKE07 BIKE071 PI 130+57.72 519723.0675 920936.7721 0-9° 00' 38.78" 009° 51' 55.41" 45.76 91.34 580.78 1.8

DADE
as

PT 131+03.30 519768.3046 920943.6894


ed By: MRoj

-
AM I
POT 131+24.36 81

MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

SIONS
POT 2428+00.00

REVI
CC 518426.6479 914879.0437

PC 2526+93.21 515650.4936 916016.1309

BLMPATH1 PI 2530+93.23 515802.1153 916386.3095 -15° 11' 25.03" 001° 54' 35.49" 400.03 795.36 3000 26.55

No.
PT 2534+88.57 516045.4358 916703.8256

BLMPATH

NEERS CORP.
DA 33172
CC 520211.9985 919181.6392

PC 2579+89.66 518783.2713 920276.5083

TE 200.DORAL,FLORI
BLMPATH2 PI 2588+96.75 519335.0179 920996.4989 -53° 29' 26.10" 003° 10' 59.16" 907.09 1680.46 1800 215.64

ON ENGI
PT 2596+70.12 520241.9813 920981.3895
DGN

COM
7283
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
POT 2598+49.50

PH:305-
WWW.
h LANE,SUI
oadway\

POT 200+61.27

A&P CONSULTI
W .35t
PED01
\
ectr

8935 N.
oj

POT 201+64.33
l
Underine Pr

ONAL
POT 202+95.36

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
DTPW -

43953
CC 513850.608 911014.3014
DB18-

PC 203+82.41 513645.1819 911098.4685

FL LI
PED021 PI 203+95.45 513650.127 911110.5381 0-6° 43' 29.86" 025° 48' 32.07" 13.04 26.06 222 0.38
\
P:

DATE
LI
PT 204+08.46 513656.4515 911121.9455

A&P PROJECT

UFL
M BR

REG
20
CC 514031.7853 912138.0481

DATE
13/
PC 215+00.86 514037.4097 912101.4781

10/

GNED BY

CHECKED BY
DRAW N BY
PED0210 PI 215+21.79 514058.0902 912104.6587 058° 58' 35.74" 154° 51' 12.45" 20.92 38.09 37 5.51

SCALE

DESI
PT 215+38.95 514066.023 912124.0202

PROJECT CONTROL
CC 514031.4659 912234.8601
53 PM

PC 216+28.41 514099.9412 912206.8044


57:

PED0211 PI 216+55.33 514110.1448 912231.7083 039° 58' 18.22" 077° 25' 36.22" 26.91 51.63 74 4.74
3:

PT 216+80.04 514101.966 912257.3485

PED02 CC 513502.7431 911207.1644


20
13/

PC 204+08.46 513656.4515 911121.9455


10/

PED022 PI 204+14.70 513659.4743 911127.3976 004° 03' 46.46" 032° 36' 01.72" 6.23 12.46 175.75 0.11

PT 204+20.92 513662.1031 911133.0502


I
ne Phase I

CC 513637.4968 911144.4939

PC 204+20.92 513662.1031 911133.0502

C W ORKS DEPT.
NE PHASE I
PED023 PI 204+36.70 513668.7555 911147.3542 060° 20' 24.62" 211° 08' 01.19" 15.78 28.58 27.14 4.25

DA
FLORI
PT 204+49.50 513659.6176 911160.2133
l
:Underi

CC 513707.6047 911194.3138
SheetSet

PC 204+49.50 513659.6176 911160.2133

ON & PUBLI
PED024 PI 204+85.44 513638.7987 911189.5103 -62° 48' 34.56" 097° 19' 37.21" 35.94 64.53 58.87 10.1

PT 205+14.04 513655.3449 911221.4158

UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

SIONS
CC 513729.9847 911250.2173

REVI
PC 205+73.97 513682.9353 911274.6172

PED025 PI 205+97.03 513693.5506 911295.0862 -47° 01' 23.26" 108° 06' 18.88" 23.06 43.5 53 4.8

PT 206+17.47 513715.7627 911301.2735

No.
CC 513705.8341 911336.9165

PC 206+17.47 513715.7627 911301.2735

NEERS CORP.
DA 33172
PED026 PI 206+35.58 513733.2089 911306.1333 052° 09' 39.31" 154° 51' 12.45" 18.11 33.68 37 4.19

PT 206+51.15 513740.0733 911322.8924

TE 200.DORAL,FLORI
ON ENGI
CC 513889.1408 911784.4527
DGN

COM
7283
PC 211+34.77 513923.38 911770.4287
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
PI 211+52.86 513930.2377 911787.1713 052° 06' 59.22" 154° 51' 12.45" 18.09 33.66 37 4.19

PH:305-
WWW.
PED027 PT 211+68.43 513921.2343 911802.8648

h LANE,SUI
PED02
oadway\

CC 513967.2062 911829.2388

A&P CONSULTI
W .35t
PC 211+68.43 513921.2343 911802.8648
\
ectr

8935 N.
PED028 PI 211+94.18 513908.417 911825.2063 -51° 50' 16.67" 108° 06' 18.88" 25.76 47.95 53 5.93
oj
ne Pr

PT 212+16.38 513918.0637 911849.0888


l
Underi

ONAL
CC 514042.4261 912068.8616

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
PC 214+66.73 514011.828 912081.221
DTPW -

43953
PED029 PI 214+85.50 514018.8579 912098.6248 -59° 15' 41.01" 173° 37' 24.87" 18.77 34.13 33 4.96
DB18-

PT 215+00.86 514037.4097 912101.4781

FL LI
\
P:

DATE
LI
POT 216+95.85

A&P PROJECT

UFL
M BR

REG
20
DATE
13/
POT 218+76.73

10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
CC 514166.0595 912373.7858

PROJECT CONTROL
PC 218+76.73 514141.8628 912401.7773

PED031 PI 218+83.99 514147.3522 912406.5225 -22° 11' 27.14" 154° 51' 12.45" 7.26 14.33 37 0.11
54 PM

PT 218+91.06 514154.2272 912408.8429


57:

PED03
3:

CC 514129.923 912480.852

PC 218+91.06 514154.2272 912408.8429

PED032 PI 219+25.74 514187.0892 912419.9343 049° 03' 35.81" 075° 23' 21.06" 34.68 65.08 76 1.72
20
13/

PT 219+56.14 514200.2442 912452.0259


10/

CC 514287.838 912873.995

PC 223+79.80 514360.9349 912844.0311


I
ne Phase I

PED033 PI 224+07.88 514371.5874 912870.0178 039° 08' 29.59" 072° 31' 34.69" 28.09 53.97 79 0.41

PT 224+33.77 514363.4455 912896.897

C W ORKS DEPT.
NE PHASE I

DA
FLORI
POT 224+61.05
l
:Under
SheetSet i

POT 226+04.47

ON & PUBLI
CC 514501.0755 913065.6976

UNDERLI
PC 226+04.47 514423.407 913072.8809

TRANSPORTATI
PED041 PI 226+16.12 514424.4802 913084.4852 -16° 59' 42.80" 073° 27' 22.06" 11.65 23.14 78 5.72

DADE
PED04 PT 226+27.61 514428.8985 913095.2691
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

ONS
CC 514698.8527 914405.3092

SI
REVI
PC 239+82.29 514927.2863 914311.7183

PED0410 PI 239+89.74 514930.1123 914318.6159 003° 27' 32.66" 023° 12' 34.47" 7.45 14.9 246.86 3.83

PT 239+97.19 514932.517 914325.6715

CC 516166.4903 913905.1075

No.
PC 239+97.19 514932.517 914325.6715

PED0411 PI 240+64.15 514954.117 914389.0477 0-5° 52' 48.71" 004° 23' 41.82" 66.96 133.79 1303.67 3.74

NEERS CORP.
DA 33172
PT 241+30.99 514982.0961 914449.8776

TE 200.DORAL,FLORI
CC 513628.4226 915072.5088

ON ENGI
DGN

PC 241+30.99 514982.0961 914449.8776

COM
7283
CURCRD01.

NG TRANSPORTATI
PED0412 PI 241+66.15 514996.7911 914481.8264 002° 42' 14.53" 003° 50' 43.27" 35.17 70.32 1490 5.63

APCTE.
592-
PT 242+01.31 515009.9626 914514.4328

PH:305-
WWW.
h LANE,SUI
oadway\

CC 514534.769 913195.4137

A&P CONSULTI
PC 227+60.41 514479.2482 913218.161

W .35t
\r

PED042 PI 227+87.22 514489.4111 913242.9664 -48° 08' 52.38" 095° 29' 34.68" 26.81 50.42 60 5.9
ect

8935 N.
oj

PT 228+10.83 514514.6687 913251.9467


l
Underine Pr

CC 514501.2684 913289.6353

ONAL

CENSE NUM BER


PC 228+10.83 514514.6687 913251.9467

UBALDO FRANK LENA


01-

CENSED PROFESSI
DTPW -

PED043 PI 228+28.75 514531.5474 913257.9479 048° 15' 00.33" 143° 14' 22.02" 17.91 33.68 40 4.12

43953
PT 228+44.52 514538.3093 913274.5365
DB18-

FL LI
CC 514593.8813 913516.8364
\
P:

DATE
LI
PC 230+89.87 514630.9222 913501.7376

A&P PROJECT
PED044 PI 231+07.56 514637.5986 913518.1163 047° 42' 29.21" 143° 14' 22.02" 17.69 33.31 40 5.01

UFL
M BR

REG
20
PT 231+23.18 514629.9754 913534.0764

DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
CC 514684.1165 913559.9364

SCALE

DESI
PC 231+23.18 514629.9754 913534.0764

PROJECT CONTROL
PED045 PI 231+49.77 514618.513 913558.0743 -47° 48' 37.17" 095° 29' 34.68" 26.59 50.07 60

PT 231+73.24 514628.5957 913582.6837


54 PM
57:

CC 514740.3746 913715.7131
3:

PC 233+38.72 514691.3312 913735.8065

PED046 PI 233+64.42 514701.0766 913759.5928 -51° 44' 49.71" 108° 06' 18.88" 25.71 47.87 53
20

PT 233+86.59 514725.7893 913766.6667


13/
10/

CC 514715.6071 913802.2381

PC 233+86.59 514725.7893 913766.6667

PED047 PI 234+04.53 514743.0437 913771.6057 051° 45' 10.25" 154° 51' 12.45" 17.95 33.42 37
I
ne Phase I

PT 234+20.01 514749.8463 913788.214

C W ORKS DEPT.
NE PHASE I

DA
CC 514863.297 914183.9238

FLORI
li

PC 238+29.19 514904.9393 914166.8675


:Under

PED048 PI 238+51.00 514913.2045 914187.0467 051° 42' 30.22" 127° 19' 26.24" 21.81 40.61 45

PT 238+69.80 514902.4882 914206.0383


SheetSet

ON & PUBLI
CC 514941.6793 914228.1528

PC 238+69.80 514902.4882 914206.0383

UNDERLI
PED049 PI 238+91.61 514891.7704 914225.0322 -51° 42' 50.76" 127° 19' 26.24" 21.81 40.62 45

TRANSPORTATI
PT 239+10.42 514900.0387 914245.2132

DADE
as
ed By: MRoj

-
AM I
POT 246+23.65

MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

ONS
POT 248+55.45

SI
REVI
CC 515655.2677 916096.0801

PC 248+55.45 515650.2584 916084.084

PED051 PI 248+66.85 515639.7433 916088.4749 -82° 28' 19.51" 080° 44' 12.36" 11.4 18.71 13 4.29

PT 248+74.16 515642.7188 916099.4747

No.
PED05

NEERS CORP.
CC 516539.488 915856.893

DA 33172
PC 248+74.16 515642.7188 916099.4747

TE 200.DORAL,FLORI
PED052 PI 250+59.55 515691.1286 916278.4348 -22° 34' 17.36" 006° 10' 02.89" 185.39 365.98 929 18.32

ON ENGI
PT 252+40.14 515804.5217 916425.1055
DGN

COM
7283
CURCRD01.

NG TRANSPORTATI

APCTE.
CC 515850.4076 916389.6304

592-
PH:305-
PC 252+40.14 515804.5217 916425.1055

WWW.
h LANE,SUI
PED053 PI 252+56.65 515814.6184 916438.1653 -31° 46' 27.89" 098° 47' 08.93" 16.51 32.16 58 2.3
oadway\

PT 252+72.30 515830.079 916443.9512

A&P CONSULTI
W .35t
\
ectr

CC 515812.5543 916490.7795

8935 N.
oj
ne Pr

PC 252+72.30 515830.079 916443.9512

PED054 PI 252+89.03 515845.7413 916449.8125 036° 59' 10.82" 114° 35' 29.67" 16.72 32.28 50 2.72
l
Underi

PT 253+04.58 515854.7257 916463.9173

ONAL

CENSE NUM BER


UBALDO FRANK LENA
01-

CENSED PROFESSI
DTPW -

CC 518063.6653 915056.8751

43953
PC 253+04.58 515854.7257 916463.9173
DB18-

FL LI
PED055 PI 253+84.32 515897.5666 916531.1739 0-3° 29' 16.61" 002° 11' 15.70" 79.74 159.43 2619 1.21
\
P:

DATE
PT 254+64.02 515944.4199 916595.6996

LI
A&P PROJECT
CC 521233.6702 912891.9429

UFL
M BR

REG
20
DATE
13/
PC 255+42.33 515993.2112 916656.9546

10/

GNED BY

CHECKED BY
PED056 PI 255+99.16 516026.3721 916703.1108 0-1° 00' 33.33" 000° 53' 16.55" 56.83 113.66 6452.73 0.25

DRAW N BY
SCALE
PT 256+55.99 516060.3409 916748.6757

DESI
PROJECT CONTROL
CC 516633.4827 917360.0557
55 PM

PC 264+89.99 516568.4589 917410.0146

PED057 PI 265+26.54 516590.7284 917438.9995 -48° 03' 01.95" 069° 52' 22.45" 36.55 68.77 82 7.78
57:
3:

PT 265+58.76 516627.1721 917441.8125

CC 516624.4016 917477.7057
20
13/

PC 265+58.76 516627.1721 917441.8125


10/

PED058 PI 265+68.57 516636.9531 917442.5675 030° 29' 10.67" 159° 09' 17.80" 9.81 19.16 36 1.31

PT 265+77.91 516644.9989 917448.1803

POT 265+77.91
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
POT 267+22.38

FLORI
l
:Underi

CC 516995.4251 917447.9278

PC 268+43.52 516762.7571 917609.0322


SheetSet

ON & PUBLI
PED061 PI 268+50.93 516766.9758 917615.1248 0-1° 00' 00.00" 020° 14' 45.09" 7.41 14.82 283 0.1

PT 268+58.34 516771.5075 917620.9883

UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t
BY
DATE
CURVE AND COORDINATE DATA

CURVE CONTROL STATION COORDINATES DESIGN


LINE DELTA D T L R e TIE & REMARKS
NUMBER POINT NORTH EAST SPEED (MPH)

CC 516894.9654 917627.0116

ONS
PC 269+38.60 516820.59 917684.4945

SI
REVI
PED062 PI 269+67.88 516838.491 917707.6561 -34° 35' 40.62" 060° 57' 10.64" 29.27 56.76 94 4.45

PT 269+95.36 516866.3772 917716.5588

PED06

CC 516849.9542 917768.0009

PC 269+95.36 516866.3772 917716.5588

No.
PED063 PI 270+04.40 516874.9893 917719.3083 019° 00' 28.20" 106° 06' 11.88" 9.04 17.91 54 0.75

PT 270+13.27 516882.2363 917724.7127

NEERS CORP.
DA 33172
POT 270+13.27

TE 200.DORAL,FLORI
ON ENGI
DGN

COM
7283
POT 272+57.09
CURCRD01.

NG TRANSPORTATI

APCTE.
592-
PH:305-
CC 518942.1805 920373.3511

WWW.
h LANE,SUI
PC 272+59.10 518934.6537 920364.0051
oadway\

PED071 PI 272+65.36 518929.7832 920367.9276 -55° 03' 03.28" 117° 27' 53.39" 6.25 11.53 12 1.53

A&P CONSULTI
W .35t
PT 272+70.63 518930.2082 920374.1667
\
ectr

8935 N.
oj
ne Pr

CC 518828.4441 920381.0993

PED072 PC 272+70.63 518930.2082 920374.1667


l
Underi

PI 272+90.25 518931.5417 920393.7409 021° 46' 32.06" 056° 10' 20.40" 19.62 38.77 102 1.87

ONAL

CENSE NUM BER


UBALDO FRANK LENA
01-

PT 273+09.40 518925.5186 920412.413

CENSED PROFESSI
DTPW -

43953
CC 518962.5785 920424.3676
DB18-

PC 273+09.40 518925.5186 920412.413

FL LI
\

PED073 PI 273+42.18 518915.4533 920443.616 -80° 11' 31.26" 147° 08' 14.62" 32.79 54.5 38.94 11.96
P:

DATE
LI
PT 273+63.90 518944.4856 920458.8494

A&P PROJECT

UFL
M BR

REG
20
CC 518916.2801 920512.6042

DATE
13/
PC 273+63.90 518944.4856 920458.8494

10/

GNED BY

CHECKED BY
DRAW N BY
PED074 PI 273+97.60 518974.3309 920474.5095 058° 04' 44.89" 094° 23' 01.12" 33.7 61.54 60.71 8.73

SCALE

DESI
PT 274+25.43 518976.8196 920508.1217

PROJECT CONTROL
CC 519034.1626 920503.876
55 PM

PC 274+25.43 518976.8196 920508.1217


57:

PED075 PI 274+75.89 518980.5455 920558.444 -82° 32' 17.42" 099° 38' 41.40" 50.46 82.83 57.5 19
3:

PT 275+08.27 519030.9255 920561.2848

CC 519022.115 920717.5366
20
13/

PC 275+08.27 519030.9255 920561.2848


10/

PED076 PI 275+16.81 519039.4526 920561.7656 006° 14' 50.45" 036° 36' 38.60" 8.54 17.06 156.5 0.23

PT 275+25.33 519047.8766 920563.1715

PED07

CC 519029.7694 920671.6709
I
ne Phase I

PC 275+25.33 519047.8766 920563.1715

PED077 PI 275+69.13 519091.0734 920570.3805 043° 25' 04.37" 052° 05' 13.46" 43.79 83.36 110 8.4

C W ORKS DEPT.
NE PHASE I

DA
PT 276+08.69 519117.495 920605.3066

FLORI
l
:Underi

CC 519190.8655 920549.8019

PC 276+08.69 519117.495 920605.3066


SheetSet

PED078 PI 276+34.79 519133.2432 920626.1238 -31° 40' 48.45" 062° 16' 40.88" 26.1 50.87 92 3.63

ON & PUBLI
PT 276+59.56 519157.5774 920635.5685

UNDERLI
CC 519147.8081 920660.7391

TRANSPORTATI
PC 276+59.56 519157.5774 920635.5685

DADE
PED079 PI 276+94.82 519190.4522 920648.328 105° 07' 15.10" 212° 12' 23.72" 35.26 49.54 27 17.41
as
ed By: MRoj

PT 277+09.09 519169.5589 920676.7361

-
AM I
MI
POT 277+09.09

SHEET NUMBER
ot
Pl t
BY
DATE
GENERAL NOTES
1. THE UNDERLINE PHASE II EXTENDS FROM THE SOUTH END OF PHASE I (SW13TH STREET ) TO SOUTH OF SW 19TH AVENUE. 23. CONTRACTOR TO NOTIFY ENGINEER / ARCHITECT OF ALL CONFLICTS BETWEEN EXISTING AND PROPOSED WET AND ELECTRICAL
UTILITIES (I.E. HANDHOLES, VAULTS, METERS, VALVES, ETC) AND ARCHITECTURAL FEATURES THAT MAY IMPACT THE AESTHETIC
2. THE CONTRACTOR SHALL VERIFY DIMENSIONS AND FIELD CONDITIONS, NOTIFY ENGINEER / ARCHITECT OF ANY DISCREPANCIES INTENT OF THE PROJECT.

ONS
IN CONTRACT DOCUMENTS AND OBTAIN CLARIFICATION BEFORE PROCEEDING WITH WORK AFFECTED BY THE DISCREPANCIES.

SI
24. ALL IMPROVEMENTS ARE TO BE CONSTRUCTED AND/OR INSTALLED WITHIN THE EXISTING STATE AND/OR LOCAL RIGHT OF WAY.

REVI
3. THE CONTRACTOR SHALL NOTIFY ENGINEER / ARCHITECT OF ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND
THE CONTRACT DOCUMENTS PRIOR TO PROCEEDING WITH THAT PORTION OF THE WORK. 25. THE CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES 48 HOURS BEFORE WORKING ADJACENT TO THEM (CALL SUNSHINE DIG/
CALL-811).
4. IN THE EVENT OF DISCREPANCIES BETWEEN DRAWINGS AND SPECIFICATIONS, CONTRACTOR SHALL NOTIFY THE ENGINEER /
ARCHITECT AND OBTAIN RESOLUTION PRIOR TO PROCEEDING WITH THAT PORTION OF WORK. 26. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND/OR OBTAINING ALL REQUIRED PERMITS AND APPROVALS BEFORE COMMENCING
CONSTRUCTION.

No.
5. CONTRACTOR SHALL COORDINATE THE WORK AND STAGING TO ENSURE ALL EXISTING BUS, TROLLEY, METRORAIL AND METROMOVER
OPERATIONS CAN REMAIN ACTIVE AND ACCESSIBLE TO THE PUBLIC OR MAINTENANCE TEAMS DURING THE DURATION OF THE WORK. 27. THE CONTRACOR SHALL MAINTAIN THE SITE IN NEAT AND FREE OF RUBBISH. INSPECT THE SITE DAILY, OR AS NEEDED, TO ENSURE THE

NEERS CORP.
DA 33172
SITE REMAINS FREE OF RUBBISH.
6. THE CONTRACTOR WILL COORDINATE AND CONTACT PRIVATE UTILITY COMPANIES FOR MINOR RELOCATION OR ADJUSTMENT

TE 200.DORAL,FLORI
OF THEIR FACILITIES. 28. THE CONTRACOR SHALL REMOVE ALL MUD, DIRT, GRAVEL AND OTHER MATERIALS TRACKED ONTO ANY PRIVATE OR PUBLIC STREETS OR
SIDEWALKS DAILY, OR AS NEEDED. THE CONTRACTOR MUST USE WATER, OR OTHER ACCEPTABLE METHODS, TO MINIMIZE AIR BORNE DUST.

ON ENGI
dgn

7. THE CONTRACTOR SHALL LOCATE, PROTECT AND IDENTIFY ALL UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. THE

COM
7283
GNNTRD01.

CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING INFORMATION AND SATISFYING HIMSELF AS TO THE LOCATION OF UTILITIES 29. THE CONTRACTOR SHALL PROTECT ALL FINISHED WORK AND MAINTAIN THE SITE UNTIL ACCEPTED BY DTPW.

NG TRANSPORTATI

APCTE.
592-
SHOWN.

PH:305-
30. EROSION CONTROL MEASURES SHALL BE MAINTAINED BY THE CONTRACTOR AS REQUIRED BY NPDES PERMIT. ANY EROSION CONTROL

WWW.
h LANE,SUI
8. THE CONTRACTOR SHALL PROTECT THE WORK AND ALL NEARBY PEOPLE AND PROPERTY INCLUDING EXISTING BUILDINGS, METRORAIL MEASURES DAMAGED BY THE CONTRACTOR SHALL BE REPLACED IMMEDIATELY.
oadway\

COLUMNS, PAVING, DRAINAGE STRUCTURES, FENCES, LAWNS, PLANTING, LIMBS AND ROOT ZONES OF TREES, ETC. FROM DAMAGE.
31. ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS OF THE CONTRACT SHALL APPLY.

A&P CONSULTI
W .35t
9. CONTRACTOR SHALL TAKE EXTRA CARE WHEN EXCAVATING AND PERFORMING ANY WORKAROUND EXISTING METRORAIL ELECTRICAL
\
ectr

MANHOLES AND UNDERGROUND ELECTRICAL CONDUITS. 32. ALL AREAS OUTSIDE THE LIMITS OF CONSTRUCTION OR TREE PROTECTION FENCE SHALL NOT BE CROSSED BY HEAVY EQUIPMENT OR

8935 N.
oj
ne Pr

USED FOR STORING ANY EQUIPMENT OR MATERIALS.


10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP OF ANY MATERIALS DEPOSITED OUTSIDE THE WORK AREA. EXISTING
l
Underi

CONSTRUCTION DRAINAGE SYSTEM AND EROSION CONTROL SHALL BE MAINTAINED, MODIFIED, AND/OR REMOVED AS NOTED ON THE 33. ALL TREE PROTECTION FENCING PER FDOT STANDARD PLANS INDEX 110-100. TREE CANOPY AND ROOT PRUNING SHALL BE
CONSTRUCTION PLANS. PERFORMED AT THE DIRECTION OF AN ISA CERTIFIED ARBORIST.

ONAL
01-

CENSE NUM BER


UBALDO FRANK LENA
CENSED PROFESSI
DTPW -

11. THE CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL PROTECTION STANDARDS, LAWS 34. THE CONTRACTOR SHALL FOLLOW ALL CITY, COUNTY, AND FDOT REGULATIONS AND SPECIFICATIONS FOR AREAS INCLUDING, BUT NOT
AND REGULATIONS. LIMITED TO, ROADWAYS, STREETSCAPE IMPROVEMENTS, AND LAND-DEVELOPMENT ELEMENTS.

43953
DB18-

12. IN ADDITION TO FEDERAL STATE AND COUNTY RULES AND REGULATIONS, ALL WORK ON AND AROUND DTPW PROPERTY SHALL 35. THE CONTRACTOR SHALL FOLLOW THE PROJECT APPROVED CONSTRUCTION DOCUMENTATION INCLUDING BUT NOT LIMITED TO

FL LI
\
P:

CONFORM TO THE SAFETY REQUIREMENTS OF THE MDT ADJACENT CONSTRUCTION MANUAL (REV. 8/2015) AND THE MDT CONSTRUCTION UNDERLINE PHASE I (DETAIL AND SPECIFICATIONS), ROADWAY, LLGHTING AND LAND-DEVELOPMENT CONSTRUCTION DOCUMENTATION.

DATE
LI
SAFETY MANUAL (REV. 5/2012)
36. THE CONTRACTOR SHALL COORDINATE ANY PROPOSED WORK WITHIN CITY OF MIAMI RIGHT OF WAY WITH THE CITY OF MIAMI.

A&P PROJECT
13. THE CONTRACTOR SHALL SCHEDULE WORK IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL

UFL
M BR

REG
20
PROTECTION STANDARDS, LAWS AND REGULATIONS. 37. MULCH MATERIAL SHALL BE MOISTENED WHEN APPLIED PREVENT WIND DISPLACEMENT. MULCH MATERIAL SHALL BE APPLIED AT A

DATE
13/
MINIMUM DEPTH OF 3 INCHES. CLEAR MULCH FROM EACH PLANT'S CROWN (BASE). TYPE OF MATERIAL, "FLORIMULCH" OR SHREDDED,

10/

GNED BY

CHECKED BY
DRAW N BY
14. FOLLOW FIGURED DIMENSIONS AND DO NOT SCALE CONTRACT DRAWINGS. STERILE EUCALYPTUS MULCH; THE CONTRACTOR SHALL NOT USE CYPRESS MULCH.

SCALE

DESI
15. ALL FASTENERS SHALL BE CONCEALED. ALL EXPOSED FASTENERS, FIXTURES AND DEVICES SHALL BE TYPE 316 STAINLESS STEEL, 38. ALL TREES AND PALMS SHALL CONFORM TO ADA AND FDOT MAINTENANCE RATING PROGRAM FOR VERTICAL CLEARANCES.
TAMPER PROOF, UNLESS INDICATED OTHERWISE; AND WILL BE APPROVED BY ENGINEER / ARCHITECT PRIOR TO INSTALLATION. ALL

GENERAL NOTES
EXPOSED JOINTS WILL BE LOCATED BY LANDSCAPE ARCHITECT. 39. CONTRACTOR SHALL INSTALL ROOT BARRIERS AT 36” DEPTH TO ALL TREES PLANTED WITHIN 5' OF ANY
56 PM

SIDEWALK OR ADJACENT HARDSCAPES.


16. ALL FASTENERS AND METALS IN DIRECT CONTACT WITH SOIL SHALL BE EPOXY COATED.
57:
3:

17. ALL EXPOSED WELDS SHALL BE GROUND AND FINISHED FOR SMOOTH CONTINUOUS APPEARANCE.

18. SEPARATE ALL DISSIMILAR METALS WITH A NON-METALIC BARRIER.


20
13/
10/

19. WHEN NEW PAVEMENT IS PLACED AGAINST EXISTING PAVEMENT, SAW-CUT AT NEAREST EXISTING JOINT AT CONCRETE PAVING AND
INSTALL NEW SURFACE GRADE SMOOTH AND FLUSH.

20. ALL EXISTING TREES TO BE RETAINED SHALL BE PROTECTED AT THE TREE PROTECTION ZONE (TPZ) AS SPECIFIED IN PLANS AND
SPECIFICATIONS. ALL EXCAVATION WITHIN THE TPZ IS TO BE DONE BY HAND.
I
ne Phase I

21. CONTRACTOR SHALL PROVIDE TEMPORARY ADA COMPLIANT ACCESS AS NECESSARY, IN ORDER TO KEEP ACCESS TO METRORAIL AND

C W ORKS DEPT.
NE PHASE I
METROMOVER STATIONS FULLY OPERATIONAL DURING CONSTRUCTION UNLESS APPROVED BY DTPW

DA
FLORI
li

22. ALL PATHS AND SIDEWALKS, INCLUDING RAMP CORNERS, SHALL BE ADA COMPLIANT AND HAVE ADA COMPLIANT CROSS SLOPES THAT
:Under

DO NOT ACCEDE MAXIMUM ALLOWANCES. NOTIFY ENGINEER / ARCHITECT OF ANY DISCREPANCIES IN CONTRACT DOCUMENTS AND
OBTAIN CLARIFICATION BEFORE PROCEEDING WITH WORK AFFECTED BY THE DISCREPANCIES.
SheetSet

ON & PUBLI
UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ott

G-001
Pl
(PB
T

BY
M EN

DATE
SE
h AVENUE

EA
EASEMENT

5'
REFER TO SIGNING & MARKING
FOR MORE DETAIL

BEGIN PROJECT
N

t
EXIST. TREES
STA. 104+34.03, 28.38' LT

ONS
19
(TO BE REMOVED)

SI
B/L SURVEY 0 10 40

REVI
EXIST. WALL

SW
(TO REMAIN)
R/W LINE EXIST. TREES EXIST. TREES

8'
(TO REMAIN) Feet (TO BE REMOVED)

00
3
53 54

10'
26 2-5"2DUCTS 30 34
2-5" DUCTS 2-5" DUCTS 8 32

NE STA.2474+60.
138KV FPL TRANS 2
138KV FPL TRANS 25
138KV FPL TRANS
6 8 27 29 37
1 4 20 31
6 23 33 35
138KV FPL TRANS
EXIST. M-PATH 138KV FPL TRANS
7
17 18
19
21
22 24 138KV FPL TRANS
36

No.
NEERS CORP.
DA 33172
METRORAIL

TH

TE 200.DORAL,FLORI
EASEMENT

19
METRORAIL

E
EXIST. PULLBOX
102 103 104 105 106 107

ON ENGI
AV

MATCH LI
(TO REMAIN)
dgn

SW

COM
7283
d01.

NG TRANSPORTATI
EASEMENT

APCTE.
592-
anr

'
MI
AMI
-DADE COUNTYI
T2"PVC

10

PH:305-
pl

11 13
9 14 MI
AMI
-DADE COUNTYI
T2"PVC 44
46 48 49

B/L SURVEY
oadway\

WWW.
h LANE,SUI
40
R/W LINE 10
12 15
16 38 41
42
45
47 50 51
52

39 43

EXIST. C&G
\
ectr

A&P CONSULTI
(TO REMAIN)

W .35t
R/W LINE
US-1
oj
ne Pr

8935 N.
US-1 / SOUTH DIXIE HIGHWAY EXIST. TREES
EXIST. C&G
EXIST. TREES
li

(TO REMAIN) (TO REMAIN)


Under

(TO REMAIN)
EXIST. UTILITY POLE
(TO REMAIN) LEGEND
01-

6)

ONAL
BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
11

6)

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
11
DB18-

PG

43953
MILLING & RESURFACING DETECTABLE WARNING
PG

2' STONE PAVERS (SHLDR.)


9
\
P:

FL LI
EXIST. METRORAIL COLUMNS
(PB

DATE
LI
(PB
T
EN

A&P PROJECT
T

UFL
M BR

REG
EN
M

20
SE

DATE
13/
M

10/

GNED BY
EA

CHECKED BY
SE

DRAW N BY
EASEMENT
EA
5'

SCALE

DESI
EASEMENT
5'

AN PLAN
EXIST. BUILDING N
58 PM

(TO REMAIN)

CYCLE AND
0 10 40
57:

EXIST. WALL
(TO REMAIN) EXIST. FENCE
3:

(TO REMAIN) R/W LINE

8'
EXIST. MH (TO REMAIN)
8'

Feet

00

PEDESTRI
00

56
64

NE STA.2480+20.
55 71
2-5" DUCTS 2-5" DUCTS EL
2-5" DUCTS
NE STA.2474+60.

EC
63
20

65 138KV FPL TRANS


13/

138KV FPL TRANS 72 73


58 70
57 62
10/

138KV FPL TRANS


138KV FPL TRANS

BI
EXIST. WELL
(TO BE ADJUSTED) METRORAIL
I

EXIST. M-PATH
ne Phase I

NY
LOP
LAST
YS
WA
ER
AT
W
TO
NS
AI
DR

NY
TE

LOP
LU

LA
POL

ST
NOT

NY
DO

LOP
LAST

YS
WA
ER
WAT
S

TO
AY

NS
RW

DU

AI
CT
TE

DR
LEI
WA

RO
N

TE
TO

LU
NS

POL
AI
DR

NOT
TE

DO
LU
OL
TP
NO

EXIST. DRAINAGE
DO

DU
CT
I
LEI
RO
N
DU
CT
I
LEI
RO
N

METRORAIL 25 LF OF 24" PIPE

I
108 109 110 111 224 LF OFREMAIN)
(TO 18" PIPE 112
MATCH LI

C W ORKS DEPT.
10' MATCH L
B/L SURVEY

NE PHASE I
223 LF OF 15" PIPE

DA
FLORI
i
l
'
:Under
10

67 AMI
MI -DADE COUNT T2
YI "PVC
75 77 79
68
MI -
AMIDADE COUNT T6
YI 2"PVC 61 69
59 0 66 81
74 76 78 80

10'
SheetSet

10'

ON & PUBLI
EXIST. C&G EXIST. PULLBOX
US-1
(TO REMAIN) (TO REMAIN)

R/W LINE

UNDERLI
US-1 / SOUTH DIXIE HIGHWAY EXIST. PULLBOX
EXIST. DRAINAGE
EXIST. PULLBOX (TO REMAIN)
(TO REMAIN)

TRANSPORTATI
(TO REMAIN)

DADE
LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
SHEET NUMBER
EXIST. METRORAIL COLUMNS
ot
Pl t
BY
DATE
EASEMENT

ONS
AMIWATER DEPARTMENT EASEME P
NT (B73PG18)
30 T
'CIY OF MI

SI
EXIST. VALVE (TO BE ADJUSTED) 0 10 40

REVI
EXIST. FENCE EXIST. WELL (TO BE ADJUSTED)
EXIST. PULLBOX (TO REMAIN) R/W LINE

8'

8'
(TO REMAIN) Feet
EXIST. WELL (TO BE ADJUSTED)
8'
00

00
82
83
99
2-5" DUCTS 2-5" DUCTS 138KV FPL TRANS 2-5" DUCTS 11
10 11 2
NE STA.2480+20.

A.2485+80.
0 11
138KV FPL TRANS 8 3
10 11
9 1
WATER WATER
138KV FPL TRANS
138KV FPL TRANS

No.
METRORAIL

NEERS CORP.
DA 33172
EXIST. DRAINAGE

10'

T'
(TO REMAIN)

10
NE S

TE 200.DORAL,FLORI
METRORAIL
NY
LOP
LAST

EXIST. DRAINAGE
NY
LOP
LAST

225 LFDRAINAGE
EXIST. OF 15" PIPE

S
AY
NY

RW
LOP

TE
LA

WA
S

YS
T

RWA

TO
NS
TE

AI
WA
EXIST. M-PATH

DR
TO

TE

YS
NS

LLU
I

WA
DRA

PO

ER
NOT

AT
E
LUT

W
DO

TO
OL

NS
TP

AI
NO

DR
DO

TE
LLU
PO
NOT
DU

DO
CT
I
LEI
RO

(TO REMAIN)
N
DU
CT
I
LEI
RO
N

OFREMAIN)
(TO
DU
CT
I
LEI
RO
N

113 114 115 161 LF 18" PIPE 116 117 118

ON ENGI
224 LF OF 18" PIPE
MATCH LI

MATCH LI
dgn

COM
7283
d02.

NG TRANSPORTATI

APCTE.
592-
B/L SURVEY
anr

AMI
MI -D ADE CO
85 UNT
87 T2
YI "8P
9VC

PH:305-
93
pl

95 97 10
5
91 11
oadway\

WWW.
98

h LANE,SUI
5
96
10 11
86 88 94 7 11 6
90
10'

10'

84 92 10 4
MH
10 2 10
10 1 6
0 10 10
3 4
FDOT ITS
\r

EXIST. C&G
ect

EXIST. PULLBOX

A&P CONSULTI
EXIST. PULLBOX

W .35t
R/W LINE
(TO BE ADJUSTED) (TO REMAIN) (TO REMAIN)
oj

US-1
ne Pr

FDOT ITS

8935 N.
EXIST. PULLBOX
(TO REMAIN)
US-1 / SOUTH DIXIE HIGHWAY EXIST. UTILITY POLE EXIST. UTILITY POLE
l
Underi

(TO REMAIN) (TO REMAIN)


EXIST. MH
(TO REMAIN) LEGEND
01-

ONAL
EXIST. PULLBOX BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
(TO REMAIN) PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

EXIST. UTILITY POLE

43953
MILLING & RESURFACING DETECTABLE WARNING
(TO REMAIN)
EXIST. UTILITY POLE 2' STONE PAVERS (SHLDR.)
\
P:

FL LI
(TO REMAIN) EXIST. METRORAIL COLUMNS

DATE
LI
A&P PROJECT
E

T.

UFL
M BR

REG
20
SD
NU

DATE
13/
SD

hC

TH

10/

GNED BY

CHECKED BY
VE

SD

18

DRAW N BY
t

CT
SA
N

16

SCALE
SA
hA

SA N
SA

DESI
N N

SW
SA

EASEMENT
N
t

SW
17

AN PLAN
SW 1ST SW 1stAVENUE N
SW
00 PM

AVE

CYCLE AND
REFER TO SIGNING & MARKING
FOR MORE DETAIL 0 10 40
58:
3:

EXIST. FENCE
(TO REMAIN) R/W LINE
8'

8'
138KV FPL TRANS

Feet
00

00
WA 138KV FPL TRANS

PEDESTRI
TE
R
138KV FPL TRANS
NE STA.2485+80.

TA.2491+40.
EL 2-5" DUCTS 2-5" DUCTS
20

EC
16
138KV FPL TRANS 0
15 15
4 7
13/

TH

13 15
9 15 6 15
10/

11 12 13 15 8 15
9 1 8 2 15 9
12 3 5
12 3 13 13
11 0 12 5 6
13
17

8 2 4
E

12 12
AV

5 4

BI
13
7
13
3
SW

PROP. CONC. PROP. CONC. 14


10'

10'

0'
10'
3

METRORAIL

NE1S
I

EXIST. M-PATH
ne Phase I

NY
LOP
LAST

YS
WA
ER
AT
W
TO
NS
AI
DR
TE
LU
POL
EXIST. DRAINAGE

NOT
DO
NY
LOP
LAST

EXIST. DRAINAGE DU
CT
I
LEI
RO
N

YS
WA
ER
AT
W
TO
INS
DRA
TE
LU
POL
NOT
DO
262 LF OF 18" PIPE (TO REMAIN)
DU
CT
I
LEI
RO
N

(TO REMAIN)
MATCH LI

MATCH LI
119 120 121 122 123 124

C W ORKS DEPT.
B/L SURVEY

NE PHASE I
METRORAIL

DA
FLORI
54 LF OF 24" PIPE
li

2-5" DUCTS

14
2
:Under

14
6
14
PROP. CONC.
MH
12 7 15
11 8 15 1
7 12 0
7 13 14
12 0 13 4 14
9 1 14 5 14 16
14 1 9 1
13 16
12 2 0 2
6 14
FDOT ITS 8 FDOT ITS
SheetSet

ON & PUBLI
EXIST. C&G EXIST. C&G R/W LINE
(TO REMAIN) (TO REMAIN)
US-1

FDOT ITS

UNDERLI
US-1 / SOUTH DIXIE HIGHWAY

TRANSPORTATI

DADE
LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
SHEET NUMBER
EXIST. METRORAIL COLUMNS
ot
Pl t
LE

BY
S TE
8"
E

DATE
U
N

E
E

TH
AV NU

D
V

A 3R
R/W LINE A

VE16
E
d

E
3r

V
W
S
SW
W

A
S

10-5" DUCTS
R/W LINE

th
SW 1ST
N

16
CTS
AVE

ONS
SW 1stAVENUE EASEMENT

" DU

SI
SW

REVI
9-5
0 10 40
EXIST. FENCE
R/W LINE (TO REMAIN)
8'

138KV FPL TRANS Feet


138KV FPL TRANS
00

00
19 20

8'
4 1
138KV FPL TRANS 2-5" DUCTS 4-5" DUCTS 4-5" DUCTS
REFER TO SIGNING & MARKING
NE STA.2491+40.

NE STA.2497+00.
19 19 21
5 6 138KV FPL TRANS 7
18 21
4 6

CR
FOR MORE DETAIL

OW
17 17 21 21
17 1 3 3 8
0 17 21
4

N
18 5

No.
2
18 19
6

CA
18 3
18 3 18
1 8 19 19 22
1 19 21 1

ST
7 8 19 4
18 9
5
PROP. CONC. 18 22

LE
7 18 19 2
9 2
WA
TE

(2X

NEERS CORP.
R

DA 33172
1.
5"
19 EXIST. WELL
10'
10'

H
METRORAIL (TO BE ADJUSTED)

DP
E)

TE 200.DORAL,FLORI
NY
LOP
LAST

B/L SURVEY NY
LOP
LAST

EXIST. M-PATH

S
AY
YS

RW
WA

TE
WA
ER
AT

TO
W

NS
TO

AI
NS

DR
AI

TE
DR

LU
TE

OL
LU

TP
OL

NO
TP

DO
NO
17

DO
METRORAIL
DU

2
CT
DU I
LEI
CT RO
I
LEI N
RO
N

125 126 127 128 129

ON ENGI
NY
LOP
LAST
YS
WA
ER
AT
W
MATCH LI

I
TO
NS
AI
DR
TE
LU
OL
TP
NO

161 LF OF 15" PIPE


DO

DU

108 LF OF 18" PIPE


CT
I
LEI

S
RO
N
dgn

EXIST. M-PATH

10' MATCH L
DUCT

COM
7283
d03.

2-5"

NG TRANSPORTATI
54 LF OF 24" PIPE

APCTE.
592-
15 LF OF 24" PIPE
anr

17
7 17 20
0

PH:305-
9
pl

16
16 9 20
3 17 3 20
16 17 8 20 5
oadway\

WWW.
4 18 20 4 20

h LANE,SUI
6 0 6
2
16 20 20 20 21 21 21
8 17 FDOT ITS SD 12 7 8 9 0 1 2
5 FT
16
5
16
16 7
6
PROP. CONC. FDOT ITS 22

10'
21 0
9

8" STEEL
\r

EXIST. PED DETECTOR


ect

EXIST. PED DETECTOR

A&P CONSULTI
EXIST. C&G EXIST. C&G

W .35t
R/W LINE
(TO BE BY FDOT CONTRACTOR) (TO BE BY FDOT CONTRACTOR)
oj

(TO REMAIN) US-1 (TO REMAIN)


ne Pr

8935 N.
US-1 / SOUTH DIXIE HIGHWAY
l
Underi

LEGEND
01-

ONAL
BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
REFER TO LANDSCAPING

AN PLAN
FOR MORE DETAIL
N
03 PM

CYCLE AND
58:

0 10 40
EXIST. FENCE
3:

8'
R/W LINE (TO REMAIN)
Feet
00

00

PEDESTRI
138KV FPL TRANS 138KV FPL TRANS
22
NE STA.2497+00.

NE STA.2502+60.
6
4-5" DUCTS 4-5" DUCTS 4-5" DUCTS
20

EL
EC

8'
138KV FPL TRANS 138KV FPL TRANS
EXIST. MANHOLE (TO BE ADJUSTED)
13/

24
8
22
4
10/

25
4 26
22 25 25 1
5 6 8
22 24
3 9 25
5

BI
25 26
22 9 2
2 25 25
3 7 26
0

23

10'
2
METRORAIL
I

EXIST. M-PATH
ne Phase I

NY
LOP
LAST

METRORAIL

S
AY
RW
TE
WA
TO
NS
NY

AI
LOP NY

DR
LA LOP
ST LAS

TE
T

LU
POL
NOT
YS

DO
WA

S
AY
ER

ERW
AT

AT
W
TO

W
TO
NS
AI

NS
DR

AI
DR
TE

DU

23
CT
LU

TE

I
L
POL

EI
LU

RO
OL

N
NOT

TP
NO
DO

DO

1
215 LF OF 18" PIPE
DU
CT DU
I
LEI CT
RO I
LEI
N

B/L SURVEY
RO
N

23
MATCH LI

MATCH LI
130 190 LF OF 18" PIPE
3
131 132 241 LF OF 18" PIPE 133 134 25
0
135

C W ORKS DEPT.
23 LF OF 24" PIPE

NE PHASE I

DA
23
4

FLORI
li

22
:Under

23 24
5 3
22 22
7 8 23 24
9 0
23 24 24
0 1 24 4
23 2
23 23 24
6 7 8 5 24
6 24 25
7 1
10'

10'

FDOT ITS 25
FDOT ITS FDOT ITS 2
SheetSet

ON & PUBLI
EXIST. PULLBOX EXIST. C&G EXIST. PULLBOXES
US-1 R/W LINE
(TO BE ADJUSTED) (TO REMAIN) (TO BE ADJUSTED)

EXIST. PULLBOX

UNDERLI
(TO BE ADJUSTED)
US-1 / SOUTH DIXIE HIGHWAY

TRANSPORTATI
EXIST. PULLBOXES

DADE
(TO REMAIN) LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
SHEET NUMBER
EXIST. METRORAIL COLUMNS
ot
Pl t
BY
DATE
N

SIONS
0 10 40

REVI
EXIST. FENCE
8'

EXIST. WALL R/W LINE (TO REMAIN)


(TO REMAIN)
Feet
00

00
138KV FPL TRANS
4-5" DUCTS 4-5" DUCTS
NE STA.2502+60.

NE STA.2508+20.
EXIST. CLEAN OUT (TO BE ADJUSTED)

8'
26
5 138KV FPL TRANS 28
7
EXIST. CLEAN OUT (TO BE ADJUSTED)
27
8 28
27 1
9

No.
28
0 28
8
29
2
26 28
3 28 3
2

NEERS CORP.
DA 33172
METRORAIL
10'

230 LF OF 18" PIPE

TE 200.DORAL,FLORI
NY

213 LF OF 18" PIPE


LOP
LAST

S
AY
METRORAIL

RW
TE
WA
TO
NS
AI
DR
E
LUT
OL
TP
NY
L NY

NO
OP L
LA OP

DO
ST LAST

YS

YS
WA

WA
ER

ER
AT
DU

AT
CT

W
I
L

W
EI

TO
RO

TO
NS
N

AI

NS
215 LF OF 18" PIPE

AI
DR

DR
TE

E
LLU

LUT
PO

OL
NOT

TP
NO
DO

DO
DU
CT DU
I
LEI CT
RO I
LEI
N RO
N

136 137 138 139 140

ON ENGI
MATCH LI

MATCH LI
dgn

COM
7283
d04.

NG TRANSPORTATI

APCTE.
EXIST. M-PATH

592-
anr

B/L SURVEY

PH:305-
27
pl

5
27
26 2 27 138KV FPL TRANS
8
oadway\

WWW.
26 27 27 27 6

h LANE,SUI
27 27
26 9 0 1 3 4 7
6
26
138KV FPL TRANS
26
4 7 28
28 6 28 29
28 29

10'
4 9 0
FDOT ITS 5 1 FDOT ITS
\
ectr

A&P CONSULTI
EXIST. C&G

W .35t
R/W LINE
oj

(TO REMAIN)
ne Pr

8935 N.
US-1 / SOUTH DIXIE HIGHWAY
l
Underi

LEGEND
01-

ONAL
BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
SCALE

DESI
AN PLAN
N
04 PM

CYCLE AND
0 10 40
58:
3:

EXIST. FENCE
R/W LINE EXIST. WALL
(TO REMAIN)
(TO REMAIN) Feet

8'
33
00

00
8

PEDESTRI
3 3 3 33
29 33 34 35 36 7
8 30 30 3
30 4 5
29
NE STA.2508+20.

NE STA.2513+80.
29 29 0
7 9
6 4-5" DUCTS 4-5" DUCTS 32
EL 9
20

EC
8'
13/

29 32
5
10/

7
31 32 32
9 1 6
29 32
3 4 32
5 32
32 8
0
29

BI
4 32 32
2 3

METRORAIL 223 LF OF 18" PIPE


28 LFM-PATH
EXIST. OF 24" PIPE 223 LF OF 18" PIPE
I

223 LF OF 18" PIPE


ne Phase I

METRORAIL
NY
LOP
LAST

NY
LOP
LAST

YS
RWA
TE
WA
B/L SURVEY
YS

TO
WA

NS
ER

AI
AT

DR
W

E
TO

LUT
NS

POL
AI
DR

NOT
TE

DO
LU
OL
TP
NO
DO

DU
CT
I
LEI
RO
N
DU
CT
I
LEI
RO
N

30
3
MATCH LI

I
141 142 143 144 145 146

C W ORKS DEPT.
10'MATCH L
METRORAIL

NE PHASE I

DA
FLORI
l
:Underi

31
1
30 138KV FPL TRANS
6
31 138KV FPL TRANS
30 4
2
30 30 31
7 9 31 7
30 31 5 31
8 0 8
31 31
2 3

10'
31
10'

6 33
0 33
4-5" DUCTS 2
33
30
1 FDOT ITS FDOT ITS 1
SheetSet

ON & PUBLI
EXIST. C&G R/W LINE
US-1
(TO REMAIN)

UNDERLI
US-1 / SOUTH DIXIE HIGHWAY

TRANSPORTATI

DADE
LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
SHEET NUMBER
EXIST. METRORAIL COLUMNS
ot
Pl t
BY
DATE
N

SI
REVI ONS
0 10 40
EXIST. FENCE
(TO REMAIN) R/W LINE
Feet
8'

33 34
9 8 35
34 34 0
34 34 2 34 34 34 9
0 1 3 5 7
00

34
EXIST. DRAINAGE

8'
6 36
0 SD

00
NE STA.2513+80.

(TO REMAIN)

NE STA.2519+40.
METRORAIL
METRORAIL

No.
82 LF OF 18" PIPE
NY
LOP
LAST

S
AY
RW
TE
WA
TO
NS
AI
DR
TE
LU
OL
TP

NEERS CORP.
NO
DO
DU
CT
I
LEI
RO
N

DA 33172
35
8 EXIST. DRAINAGE
35 35
7 9
(TO REMAIN)

TE 200.DORAL,FLORI
NY
LOP
LAST

S
AY
RW
TE
WA
TO
NS
AI
NY
LOP

DR
LAST

TE
LU
POL
NOT
DO
YS
WA
ER
WAT
TO
INS
DRA
DU

E
CT

LUT
I
LEI

POL
RO
N

NOT
DO
METRORAIL
DU
CT

147 148 149 150 151 152


I
L

ON ENGI
EI
RO
N
MATCH LI
dgn

METRORAIL

COM
0' TCH L

7283
d05.

25 LF OF 18" PIPE

NG TRANSPORTATI
EXIST. M-PATH

APCTE.
79 LF OF 18" PIPE

592-
anr

138KV FPL TRANS

PH:305-
pl

138KV FPL TRANS


36 B/L SURVEY
oadway\

WWW.
1A

MA

h LANE,SUI
NY
LOP
LAST

S
AY
RW
TE
WA
35

TO
NS
35

AI
DR
TE
LLU
35

PO

10'
5

NOT
10'

10'

DO
3 35 6 DU
CT
I
LEI
RO
N

34 4-5" DUCTS 4
4 35
35
2
4-5" DUCTS 4-5" DUCTS
1 FDOT ITS FDOT ITS

1
\
ectr

EXIST. C&G

A&P CONSULTI
W .35t
EXIST. WELL (TO BE ADJUSTED) EXIST. FH (TO BE ADJUSTED) R/W LINE
(TO REMAIN)
oj

US-1
ne Pr

8935 N.
US-1 / SOUTH DIXIE HIGHWAY
l
Underi

LEGEND
01-

ONAL
BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
SW

A&P PROJECT

UFL
M BR

REG
20
32n

DATE
13/
10/

GNED BY

CHECKED BY
dR

DRAW N BY
SCALE

DESI
OA
N

D.

AN PLAN
06 PM

0 10 40

CYCLE AND
58:

R/W LINE
3:

Feet
00

00

PEDESTRI
NE STA.2519+40.

NE STA.2523+20.
20
13/

EXIST. CLEAN OUT EXIST. CLEAN OUT


10/

(TO BE ADJUSTED) (TO BE ADJUSTED)


VIZCAYA STATION

BI
EXIST. FENCE
I

(TO REMAIN)
ne Phase I

153 B/L SURVEY


154 155
MATCH LI

MATCH LI

C W ORKS DEPT.
383

NE PHASE I
377

382

371

372
373
374
375

376
MH 378
381

DA
MH

FLORI
li

138KV FPL TRANS


:Under

380

370
10'

10'

10'
369

380A

379
386
365

368

363

361 366

367

362
4-5" DUCTS

364

EXIST. M-PATH FDOT ITS


SheetSet

EXIST. C&G EXIST. MH (TO BE ADJUSTED)

ON & PUBLI
(TO REMAIN) EXIST. MH (TO BE ADJUSTED) R/W LINE
US-1
US-
1/SOUTHDI
XIEHI
GHWAY

UNDERLI

TRANSPORTATI
LEGEND

DADE
BICYCLE PATH DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON
as

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL


ed By: MRoj

-
AM I
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
MILLING & RESURFACING DETECTABLE WARNING

MI
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS
SHEET NUMBER
ot
Pl t
BY
SW 3

DATE
1stR
O AD
REFER TO LANDSCAPING
FOR MORE DETAIL
N

ONS
.

SI
396

REVI
0 10 40
EXI

8'
EXI
ST.FENCE ST.WALL
R/
WLI
NE (
TO REMAIN) (
TO REMAI
N)
00

Feet
NE STA.2523+20.

398

C10

C48

C11

C12

C15

C16

C17

C22

C18

C20

C24
C19 C25

C21

17
C23

C14

C13

METRORAI
L

00
EXI

PC STA. 159+15.
ST.WALL

8'

No.
NE STA.2528+80.
METRORAI
L (
TO REMAI
N)
395

EXI
ST.FENCE
393

NEERS CORP.
DA 33172
(
TO REMAIN) 394

392

TE 200.DORAL,FLORI
156
MATCH LI

390

15

ON ENGI
7 MET
158 RORAI
L
161
dgn

B/
LSURVEY 159
388

MET 160

COM
RORAI
384 385

7283
d06.

C7

NG TRANSPORTATI

APCTE.
MATCH LI

592-
anr

PH:305-
pl

138KV FPL TRANS


oadway\

WWW.
h LANE,SUI
389

387

391

NY
LOP
4-5" DUCTS LAS
T
YS
WA
ER
WAT
TO
NS
AI
DR
E
LUT

138KV FPL TRANS


OL
TP
NO
DO

NY
LOP
LAS
T

DU
CT
I
LEI
RO
N
10'

S
AY
ERW
WAT
TO
NS
AI
DR
E
LUT
OL
TP
NO
DO
EXI
ST.
4-5" DUCTS

M-
PATH
DU
CT
I
LEI
RO
N

C2

C1

C3 138KV FPL TRANS

C6

R/
WL
r

I
NE C4
NY
LOP
LAS
T
\

YS
22

WA
5L

ER
FOF1

AT
W
TO
ect

NS
5"

I
DRA
PI
PE

TE

A&P CONSULTI
LU
OL
TP
NO
DO

W .35t
DU
CT
I
LEI
RO
N

84LFOF1

10'
8"PI
PE
oj

C5
ne Pr

NY
LOP
LAS
T

YS
RWA
TE
WA
TO
NS
AI
DR
TE
LU
OL
TP
NO
DO

8935 N.
EL 4-5" DUCTS
DU
CT

EC
FDOT
I
LEI
ITS RO
N

C8
C32

C37

31LFOF24"PP
IE C47
i

C53
l
Under

C43

C38

C34

397

C26
LEGEND
01-

C27

C49

C28

ONAL
C29

BI
CYCLEPATH C46

DRAI
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI
NAGEI

NYLOPLAST
DTPW -

LE I
NL

RON
ET

CENSE NUM BER


UBALDO FRANK LENA
US-
1/ PEDESTRI
ANPATH C30

2CHAMBERDRAI
C44

SOUT NAGEWEL

CENSED PROFESSI
L
HDI 2'RESINBONDEDAGGREGATE(
SHL
L/
AR/
WLI
NE
C45

C50

XIUS-
1 DR.
) 3CHAMBERDRAI
EHIGHWA
NAGEWELL
DB18-

MILLI
NG &RESURF

43953
FDOT ITS

ACI
NG
Y 2'STONEPAVERS(
DETECTABLEWARNI
NG C44
C51

SHLDR.
) C52
C54
\

EXIST.METRORAI
P:

LCOLUMNS

FL LI

DATE
LI
SW 30t

A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
h RO AD

DRAW N BY
40
10

SCALE
0

DESI
N Feet

AN PLAN
.
07 PM

CYCLE AND
8'
58:

78
3:

EXIST. FENCE

81.
R/W LINE
(TO REMAIN) C114

00
8'
C108
C107

C109

C106

C93

C104

C110

. 166+
C98

C103

C97

C70

C94

C79
C102

C95

34+40.
C101

C82

C100

C92
C90

C77 C78

C91 C96 C111

C93A

PEDESTRI
C69
8'

C99

C105

C66

C80

C71

C86
C87

C112

C72

C76

C75

C74

C73

C67
00

C68

C88
C83 C84

C85

C89

C81
20

528+80.

C113
13/

PT STA
10/

NE STA.25

BI
167
PP
IE
NE STA.2

43LFOF18"
2
METRORAIL
199 LF OF 18" PIPE
166 NY
LO
PL
AS
T

S
AY
RW
TE
WA
TO
INS
DRA
E
UT
LL
PO
NOT
DO
I

DU
CT
I
LE
IRO
N
ne Phase I

METRORAIL
162

MATCH LI
165
163
NY
LO
PL
AS
T

164
YS
WA
ER
AT
W
TO
INS
DRA
E
UT
LL
PO
NOT
DO

DU
CT
I
LE
IRO
N

C W ORKS DEPT.
MATCH LI

NE PHASE I
METRORAIL

DA
FLORI
525

LSURVEY
B/
i

107 LF OF 18" PIPE


l
:Under

10'
138KV FPL TRANS

512
10'

C57A
SheetSet

138KV FPL TRANS

C57

PATH

ON & PUBLI
4-5" DUCTS
526

ST
EXI .M-
513

530

C58

NY
LO
PL
C63 AS
T
S
AY
W
ER
AT
W
TO
NS

517
AI
DR
E
LUT
PI STA. 163+00.

POL
NOT
DO

514
4-5" DUCTS
523

DU 520
516

CT 514

I
LE 524
528
IRO
N

C65

521

C63A

C64 519

529

527

4-5" DUCTS

UNDERLI
522

515

223 LF OF 18" PIPE


C56

L WL
AR/
/ NE
I
518

4-5" DUCTS

TRANSPORTATI
C59

C55
LEGEND

DADE
BICYCLE PATH
C60

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON
as
ed By: MRoj

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

-
FDOT ITS
C64A

AM I
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
78

MILLING & RESURFACING DETECTABLE WARNING

MI
FDOT ITS

C61

2' STONE PAVERS (SHLDR.)


C62

EXIST. METRORAIL COLUMNS


SHEET NUMBER
ot
Pl t
BY
SW 28t

DATE
ROAD
EXI
ST.UNDERLI
NEACCESS
M

(
TO REMAI
N)
H

SW 1st AVENUE

SW 28TH
S
A
N

RD

h
EXIST. C&G
2" GAS

(TO REMAIN)
EXIST. GUARDRAIL
(TO REMAIN) 587
585

584

R/W LINE N

ONS
544

583

550

589

551

586

EXIST. FENCE
563

556

536

538

578

SI
537

590

588

591

540

(TO REMAIN)
593

138KV FPL TRANS

557

REVI
543

603

545

606
562

558

604

566

608

539
C115

4-5" DUCTS

564
C124

565
607

549

542

0 10 40
138KV FPL TRANS

592

576
C122

547

6.05

138KV FPL TRANS


541

C123
575

554
00

546

595

580

00
581

577

609

560

582

548
555

138KV FPL TRANS


559

561
NE STA.2534+40.

NE STA.2540+00.
579

574

601

8'
552

Feet
C114
8'

CTS
DU
594

5"
4-
C117A

570

C117 600 568

553

598

572

599

573

596

567

C120

597

C121

571

C118

602

C116

C119

No.
223 LF OF 18" PIPE

NEERS CORP.
172

DA 33172
168 169 170 171
METRORAIL N
YL
O
PL
AS
T

AYS
ERW
WAT
TO
S
N
AI
R
D
E
LUT
N
YL

POL
O
PL

T
O
AS

N
T

O
D
AYS
W
ER
WAT
TO
S
D

N
AI
U
C

R
TI

D
LE

E
UT
IR

LL
O
N

PO
T
NO
DO
D
U
C
TI
LE
IR
ON

TE 200.DORAL,FLORI
MATCH LI

EXIST.
201 M-PATH
LF OF

MATCH LI
18" PIPE 486

METRORAIL B/L SURVEY

ON ENGI
487
dgn

COM
7283
d07.

488

NG TRANSPORTATI

APCTE.
592-
anr

PH:305-
pl

507
oadway\

WWW.
h LANE,SUI
10'

DRY

10'
32 LF OF 24" PIPE
508

511

510

489

494

485

503

500

496

491

502

499
r

497
\

501

498
504
ect

A&P CONSULTI
509

W .35t
492

495

E
L 493

E
C
oj

4-5" DUCTS
4-5" DUCTS
506

505
ne Pr

490

8935 N.
i

L/
AR/
l

R/W LINE WLI


NE
Under

LEGEND
01-

ONAL
FDOT ITS

BICYCLE PATH
DTPW -

DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
S
D

A&P PROJECT
SW 27t

SW 26t

UFL
M BR

REG
ROAD

20
S
D

DATE
13/
SW 1st AVENUE SW 1st AVENUE SW 1st AVENUE

10/

GNED BY

CHECKED BY
ST
S

SW 1ST
S
A
N
A
N
SW 1

DRAW N BY
AVEC&G
h ROAD

AVE EXIST.

SCALE
EXIST. C&G

DESI
2" GAS

2" GAS

(TO REMAIN)
2" GAS

(TO REMAIN)
PROP.CONC.SWK.
138KV FPL TRANS

SW 26TH
S
D

N
S
D

EXI
ST.UNDERLI
NEACCESS 138KV FPL TRANS

R/W LINE

AN PLAN
E

8'
L E
E L

(
TO REMAI
N) C E 453

531 N
YL

C
OP
LA
ST

RD

YS
WA
138KV FPL TRANS

R
TE
WA
TO
NS
AI
DR
E
UT
LL
PO
OT
N
DO
D
U
C
TI
LE
IR
O
N

455

454

W203
09 PM

536

533

W196

468

138KV FPL TRANS

457

456

532 459

CYCLE AND
460

534

467
4-5" DUCTS

E
L
E
0 10 40 W191
4-5" DUCTS

00
458

C
58:

465

461

W182

W202

466

W193

NE STA.2545+60.
462
3:

W170

W194
W195
W192
W200

463
W199

535 W197

464

W169

W201

Feet W171
8'

W198

PEDESTRI
00
NE STA.2540+00.

W168
20

W181

CROW N CASTLE (
W177

W179

2X1.
5" H D PE)
W167
13/

W166

10'
471

469

W180

W178

472
10/

470

W165

BI
173 174 175 176 177 178
EXIST. M-PATH

MATCH LI
N
YL
OP
LA
ST
S
AY
W
ER
AT
W
TO
S
N
AI
R
D
E

N
UT

YL
LL

O
PO

PL
T

AS
NO

T
DO

AYS
W
ER
AT
W
TO
NS

D
AI

U
DR

C
TI
LE
TE
U

I
LL

R
O
PO

N
T
NO
O
D

W190

METRORAIL
U
C
TI
LE
IR
O
N
I

222 LF OF 15" PIPE


ne Phase I

B/L SURVEY
MATCH LI

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

481

474

476
10'

477

483

484

480

475

482

W185

W183

478

W188

REFER TO SIGNING &


W186
SheetSet

W184

ON & PUBLI
MARKING FOR MORE DETAIL
479

473

W189

W187

L/
AR/
WLI
NE

UNDERLI
L/
AR/
WLI
NE

SW 26t

TRANSPORTATI
FDOT ITS

LEGEND

DADE
BICYCLE PATH DRAINAGE INLET
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON
as

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL


ed By: MRoj

-
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

AM I
h ROAD
MILLING & RESURFACING DETECTABLE WARNING

MI
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS
SHEET NUMBER
ot
Pl t
BY
COMCAST
S S
D D

SW 25t
ROAD
M

DATE
H M
H

SW 1st AVENUE SW 1st AVENUE SW 1st AVENUE ST


M
138SW 1
KV FPL TRANS
S
A
N
H
0 10 40
R/W LINE 138 AVE
KV FPL TRANS
RANS
KV FPL T EXIST. C&G

h
138
EXIST. C&G 3" STEEL EXIST. TREE 3" STEEL
2" GAS
(TO REMAIN) 38KV FPL TRANS (TO REMAIN)
R/W LINE 1
PROP.CONC.SWK. (TO REMAIN) Feet
N
YL
OP
LA
ST

4-5" DUCTS
58 LF OF 18" PIPE

AYS
W
ER
AT
W
TO
S
N
AI
R
D
E
LUT
POL
T
NO
DO
N
D
U
C
TI
LE
IR
O
N

3" GAS
W
W 1
1 1
1 1
8'
2

88 LF OF 18" PIPE W
1
1
W
0 1
0
9

ONS
W
W 1
4-5" DUCTS 0

SI
4-5" DUCTS 1
0
7
8

8'

REVI
3" STEEL
W
74 LF OF 18" PIPE 1
0
6
W
1
7
6
N
YL
OP
LA
ST

AYS
W
ER
N
YL

WAT
OP

TO
LA
ST

S
N
AI
R
D
W

TE

AYS
U
LL
PO

W
ER
T

WAT
O
N
O

TO
D

S
N
AI
R
D
TE
W 1

U
LL
PO
NOT
D

O
U

D
C
TI
LE
I

7
R

2L
O
N

1
FOF2
D
U

1
C

5
TI
LE
IR
ON

7
W
1
7
W
1
7
2
3
4"PI
PE
7
4
W
1
W
1
3
2 W
1 3 1 W
5 2 1
W 0 2
1 W 4
W 1 1 1
1 W 5 2 2

SW 25TH
3 1 2 3
3 1 W
3 1
W 1
7
00

00
1 W W
3 1
4 1 1
6 2
W 1
NE STA.2545+60.

NE STA.2551+20.
1

RD
W W 9
1 1 W
1 1 1
4 8 2
5
EXIST. M-PATH
10'

No.
179 180 B/L SURVEY 181 182 183 184

10'
EXIST. M-PATH

NEERS CORP.
DA 33172
W
METRORAIL 1
4
5

TE 200.DORAL,FLORI
ON ENGI
dgn

MATCH LI

MATCH LI
W

COM
7283
d08.

1
5 W
5
1
2

NG TRANSPORTATI
W 6
W 1
REFER TO SIGNING &

APCTE.
1 4 W
5

SW 25t
9 1

592-
3 2
7
anr

W
1
6
4
W
MARKING FOR MORE DETAIL W W
W
1
3

PH:305-
1 W 1 1
pl

W 4 3 3 6
W 1 W 8 1 8 7
5 1 4
1 4 5 W 0
5
oadway\

W 2 1

WWW.
8

h LANE,SUI
1 4 W
6 7
3 W W 1
1 W W 3
1 5 1 9
6 1

3" STEEL
1 W 6 4 4
1 6 W 1
5 W 1
9 4 W
W W 1 W 4 1
1 W 1 5 1 4
6 5 1 5 2
2 1 7 0
6 W
0 1
4

h ROAD
3
\
ectr

A&P CONSULTI
FDOT ITS

W .35t
oj

FDOT ITS
ne Pr

L/
AR/
WLI
NE

8935 N.
L/
AR/
WLI
NE
l
Underi

LEGEND
01-

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

ONAL
DTPW -

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSE NUM BER


UBALDO FRANK LENA
CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
MILLING & RESURFACING DETECTABLE WARNING
DB18-

43953
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS
\
P:

FL LI

DATE
LI
COMCAST
3" STEEL

A&P PROJECT
SW 23r
SW 24t

ROAD

UFL
M BR

REG
ROAD

EXIST. UTILITY POLE EXIST. TREE EXIST. TREE


EXIST. TREE

20
138KV FPL TRANS
(TO REMAIN) SW 1st AVENUE
138KV FPL TRANS SW 1st AVENUE

DATE
(TO REMAIN)

13/
(TO BE REMOVED) (TO REMAIN)
138KV FPL TRANS
138KV FPL TRANS
SW 1ST EXIST. TREE EXIST. TREE

10/

GNED BY

CHECKED BY
T

EXIST. TREE EXIST. TREE


AS

EXIST. TREE

DRAW N BY
EXIST. TREE EXIST. C&G (TO REMAIN) (TO REMAIN)
MC

(TO REMAIN) AVE


h

d
(TO REMAIN)
M
H
(TO BE REMOVED) (TO BE REMOVED) EXIST. M-PATH

5'

SCALE
CO

(TO REMAIN)

DESI
4-5" DUCTS
W W W
9 W 9 9
W 5 3 2
9 9
6 4
4-5" DUCTS 4-5" DUCTS
EXIST. TREE W
9
7
W
(TO REMAIN) W

AN PLAN
W W 9
1 W 9 8
0 1 1 9
2 0 0
1 0

W
1
11 PM

0
3

CYCLE AND
W W
8'

1
58:

1 0

5'
0 4
5

EXIST. TREE EXIST. FENCE


3:

R/W LINE W EXIST. UTILITY POLE


O
O
D (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED)
EXIST. UTILITY POLE PROP. FENCE

PEDESTRI
EXIST. TREE
00

00
(TO REMAIN) EXIST. TREE
EXIST. TREE (TO REMAIN)
NE STA.2551+20.

NE STA.2556+80.
20

(TO BE REMOVED)
EXIST. UTILITY POLE
13/

(TO BE REMOVED) EXIST. TREE


(TO REMAIN) EXIST. UTILITY POLE
10/

(TO REMAIN) (TO REMAIN)


T

EXIST. WALL
N
AS

184 185 186 B/L SURVEY 187 188 189


MC

(TO REMAIN)

BI
10'

CO

EXIST. GUARDRAIL
I

(TO REMAIN)
ne Phase I

0 10 40

C W ORKS DEPT.
MATCH LI

MATCH LI

NE PHASE I

DA
W
1
3
0

FLORI
Feet
i

W
l

1
W W 3
1
:Under

1 1
2 2
8 9
SheetSet

ON & PUBLI
FDOT I
L/
AR/
WLI
NE
TS L/
AR/
WLI
NE

UNDERLI
SW 24t

TRANSPORTATI
LEGEND

DADE
as

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON
ed By: MRoj

PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

-
AM I
h ROAD

2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
FDOT I
2' STONE PAVERS (SHLDR.) TS

EXIST. METRORAIL COLUMNS SHEET NUMBER


ot
Pl t
BY
SW 22nd

SW 21st
ROAD
ROAD

DATE
S
A
N

S
A
N

COMCAST

EXIST. UTILITY POLE


138KV FPL TRANS
(TO BE REMOVED)
138KV FPL TRANS

SW 1st AVENUE SW 1st AVENUE EXIST. TREE

ONS
138KV FPL TRANS 138KV FPL TRANS
SW 1ST (TO REMAIN)
EXIST. TREE EXIST. TREE EXIST. TREE EXIST. TREE EXIST. TREE

SI
EXIST. M-PATH AVE
(TO REMAIN) (TO REMAIN)

REVI
(TO REMAIN)

5'
(TO REMAIN) (TO REMAIN)
5'

4-5" DUCTS 4-5" DUCTS W


4-5" DUCTS
7 W W
W W W W 5 7 7
9 W W W W 7 7 7 4 3
1 W W W 8 W W 8 6
8 7 8 8 8 7 7
9 8 6 8 W W W 1 0 9

9'
0 9 8 5 8 8
4 8 2
3
00

00
WA
TE
R
NE STA.2556+80.

NE STA.2562+40.
5'
5'
EXIST.UTL
IITYPOLE R/W LINE

5'

No.
EXIST.WALL N)
(TO REMAI
5'

EXIST. FENCE (T N)
O REMAI EXIST.WALL
EXIST.GATE N)
(TO BE REMOVED) (TO REMAI
(T N)
O REMAI

NEERS CORP.
DA 33172
PROP. FENCE

EXIST. VALE

TE 200.DORAL,FLORI
(TO BE ADJUSTED)

ON ENGI
N
dgn

MATCH LI

MATCH LI
190 191 B/L SURVEY 192 193 194 195

COM
7283
d09.

NG TRANSPORTATI

APCTE.
592-
anr

PH:305-
pl
oadway\

WWW.
h LANE,SUI
0 10 40
\
ectr

A&P CONSULTI
W .35t
Feet
oj
ne Pr

8935 N.
l
Underi

LEGEND
01-

ONAL
BICYCLE PATH DRAINAGE INLET
DTPW -

DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
L/
AR/
WLI
NE 2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
A&P PROJECT
SW 20t

UFL
M BR

REG
20
ROAD

DATE
13/
10/

GNED BY

CHECKED BY
S
A
N

DRAW N BY
SCALE

DESI
h
COMCAST

AN PLAN
SW 1st AVENUE 138KV FPL TRANS SW 1st AVENUE
138KV FPL TRANS
12 PM

138KV FPL TRANS


SW 1ST 138KV FPL TRANS

CYCLE AND
6'
6'
EXIST. M-PATH AVE
58:

5'
5'
3:

4-5" DUCTS W 4-5" DUCTS W W


6 W W 6 W W 6
W W 7 6 6 4 6 6 1
W 7 W W W 6 5 3 2
7 1 7 6 6
2 0 9 6 8
A 9
E
L E
E L
C E WATER
C

PEDESTRI
00

00
NE STA.2562+40.

NE STA.2568+00.
20
13/
10/

6'
6'
5'
5'

R/W LINE E EXIST.LGHTPOL


I E
EXIST.WATERMETER EXIST.LGHTPOL
I ST.WALL
EXIST.WALL EXI
ED) (TO BEREMOVED) (TO BEREMOVED)

BI
(T UST
O BEADJ EXIST.WALL (T N)
O REMAI
(T N)
O REMAI
(T N)
O REMAI
EXIST.UTL
ITYPOLE
EXI ST.MH
USTED) (TO BERELOCATED)
(TO BEADJ
I
ne Phase I

EXIST .MH
(TO BEADJ USTED)

C W ORKS DEPT.
MATCH LI

MATCH LI
199 200 N

NE PHASE I
196 197 198

DA
FLORI
l
:Underi

B/L SURVEY

0 10 40
SheetSet

ON & PUBLI
Feet

UNDERLI

TRANSPORTATI

DADE
LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
L/
AR/
WLI
NE 2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS
SHEET NUMBER
ot
Pl t
BY
SW 19t
S
IT

ROAD

DATE
T
O
D
F

h
M
H COMCAST

SW 1st AVENUE
138KV FPL TRANS 138KV FPL TRANS

ONS
138KV FPL TRANS SW 1ST 138KV FPL TRANS

8'
6'
EXIST. M-PATH

SI
6'

AVE

REVI
4-5" DUCTS

W W
6
0 5
9 4-5" DUCTS 4-5" DUCTS
00

00
W
5
8
NE STA.2568+00.

NE STA.2573+60.
W
5
7

6'
6'

No.
EXIST.LGHTPOL
I E R/W LINE

6'
6'
EXIST.WALL EXIST.WALL
(TO BEREMOVED)
(T N)
O REMAI (T N)
O REMAI
)

NEERS CORP.
DA 33172
TH
U
(SO

TE 200.DORAL,FLORI
95
-
I

ON ENGI
201 202 B/L SURVEY 203 204 205 206
dgn

MATCH LI

MATCH LI
R/W LINE
N

COM
7283
d10.

NG TRANSPORTATI

APCTE.
592-
anr

PH:305-
pl
oadway\

WWW.
h LANE,SUI
0 10 40
r

)
\
ect

A&P CONSULTI
TH

W .35t
oj

R Feet
ne Pr

8935 N.
(N
95
li

-
I
Under

LEGEND
01-

ONAL
BICYCLE PATH DRAINAGE INLET
DTPW -

DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

CENSE NUM BER


UBALDO FRANK LENA
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
DB18-

43953
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
\
P:

FL LI
EXIST. METRORAIL COLUMNS

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
M
H

DRAW N BY
SCALE
M
H
COMCAST

DESI
M
H

M
H

SW 1st AVENUE

AN PLAN
138KV FPL TRANS
EXIST. LIGHT POLE
14 PM

138KV FPL TRANS


SW 1ST

8'
EXIST. M-PATH 2" GAS
(TO BE REMOVED) 2" GAS

CYCLE AND
R/W LINE
8'

138KV FPL TRANS 138KV FPL TRANS


AVE
58:

E
L
E
C
3:

4-5" DUCTS 4-5" DUCTS 4-5" DUCTS

PEDESTRI
00

00
W W
W 4 4
7

21
8
NE STA.2573+60.

NE STA.2579+20.
W
20

W W 9
5 5 5
2 1 0
13/

PC STA. 212+16.
W 5
5 3
W W 4
5 5
6 5
10/

EXIST.LGHTPOL
I E

6'
(TO BEREMOVED)
6'

BI
EXIST. L
GUARDRAI
EXIST.WALL (TO BEREMOVED) EXIST.WALL
(T N)
O REMAI (T N)
O REMAI
I
ne Phase I

207 208 209 210 211 212

C W ORKS DEPT.
MATCH LI

MATCH LI

NE PHASE I

DA
N

FLORI
l
:Underi

B/L SURVEY

0 10 40
SheetSet

ON & PUBLI
Feet

UNDERLI

TRANSPORTATI

DADE
LEGEND
as
ed By: MRoj

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON

-
AM I
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS SHEET NUMBER
ot
Pl t
BY
REFER TO LANDSCAPING
FOR MORE DETAIL

DATE
M
H

SW 17t
S
A
N GAS
4"

RO AD
WA

UE
TE

AVEN
R

st
COMCAST
S
A
S
A
N
WA
SW 1
N TE
WA R
TE
R

"DUCTS

h
4-5

40
0 10
SW 1stAVENUE
N SW 1 KV FPL TRANS

ONS
138
ST
8'

2"GAS

PAT
M- H

SI
138KV FPL TRANS
ST
EXI . AVE 138KV FPL TRANS

Feet

10'
SW 1ST

REVI
R/WLNE
I 4" GAS
"DUCTS

8'
138KV FPL TRANS 4-5

"DUCTS
AVE
4-5 2" GAS

URE
00

W
LPT
SCU
1

MATC
6
.
20.

IST )
21

EX IN
EMA L
AI
OR ROR
2+16.

W
(T
MET
W 1
W W 1 7
NE STA.2579+

1 8

217
2 9
1
6'

No.
2
0

H LI
6'
PC STA. 21

L
AI

NEERS CORP.
ROR

NE S

DA 33172
MET
EXIST.WALL PROP.RETAI
NING WAL 216

8'
(TO REMAI L
N)

TA.2

TE 200.DORAL,FLORI
EXI
ST.GUARDRAIL
2 (
TO BEREMOVE 215

ON ENGI
12 D)
MATCH LI
dgn

214

584+
213 LSURVEY
B/
L
AI

COM
7283
d11.

ROR
MET

NG TRANSPORTATI

APCTE.
592-
W
AL
I
anr

ROR

80.
2
W 2

MET
W W 2
2 3
2 4
5

PH:305-
pl

W
2
W 7

00
oadway\

WWW.
NE
2

h LANE,SUI
6
I
WL
R/
\
ectr

A&P CONSULTI
W .35t
oj
ne Pr

8935 N.
i

W
l

W 2
3
Under

2 8
W
3
1 W
W 2
3 W 9
3 3
0

LEGEND W
01-

3
4

ONAL
W
BICYCLE PATH DRAINAGE INLET 3
DO NOT POLLUTE DRAINS TO WATERWAYS

DUCTI

NYLOPLAST
LE I
RON
DTPW -

CENSE NUM BER


W

UBALDO FRANK LENA


3
7
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

CENSED PROFESSI
W
3
6
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL W
3
DB18-

43953
W
MILLING & RESURFACING DETECTABLE WARNING 3
8

2' STONE PAVERS (SHLDR.)


\
P:

EXIST. METRORAIL COLUMNS

FL LI

DATE
LI
4" GAS

A&P PROJECT
SW 15t

SW 1stAVENUE

UFL
M BR

REG
20
DATE
13/
10/

GNED BY

CHECKED BY
DRAW N BY
EL
EC

MH

N
h RO AD

SCALE

DESI
' R/
WL R/
WL
10 I
NE I
NE 40
EL
EC

0 10
WLNE
I

AN PLAN
R/
Feet
15 PM

CYCLE AND
W

12
13
58:

4-5"D
W

4-5"DUCTS
15

UCT
14

S
3:

00

MATCH
223
EL

EASEME
EC

NTL
.

I
NE
584+80

218

PEDESTRI
SW 15TH

22
20

2
RO AD
13/

21
CROW N CAS

LI
221 NE
10/

220 WL
R/ I
STA.2

NE
EXI
ST. B/
LSURVEY
M-
PAT
COM CAST

H METRORAI
L

BI
TLE (

STA.2
METRORAI
L
2X1.

REFERTO SI
GNING &MARKI
NG
NE

5" H DPE)
138KV

FORMOREDET AIL
I

H LI
ne Phase I

590+40
FPL TRA

6'
2" H OTW

C W ORKS DEPT.
MATC

NE PHASE I
PROP.
NS

CONC.

DA
IRE

FLORI
METRORAI
L

00
li

EASEME METRORAI
L
:Under

NTLI
NE
SA
10'

EXIST. M-PATH
6'
SD

W
4
R/ R/W LINE
WL

W
I
NE

5
EXIST. FENCE

W
6
SheetSet

ON & PUBLI
W

W
W

W
11

7
10

8
SW 15t

UNDERLI
EXIST. FENCE

TRANSPORTATI
LEGEND

DADE
h RO AD
as

BICYCLE PATH DRAINAGE INLET


DO NOT POLLUTE DRAINS TO WATERWAYS
DUCTI

NYLOPLAST
LE I
ed By: MRoj

RON

-
PEDESTRIAN PATH 2 CHAMBER DRAINAGE WELL

AM I
2' RESIN BONDED AGGREGATE (SHLDR.) 3 CHAMBER DRAINAGE WELL
4" GAS

MI
MILLING & RESURFACING DETECTABLE WARNING
2' STONE PAVERS (SHLDR.)
EXIST. METRORAIL COLUMNS SHEET NUMBER
ot
Pl t
Pl
ott as
ed By: MRoj SheetSet
:Under
line Phase I
I 10/
13/
20 3:
58:
18 PM P:
\DB18-
DTPW -
01-
Under
line Pr
oject
\roadway\
planr
d12.
dgn

MATC
H LI
NE STA.2
590+40
6' .
00

223

EXI
ST
EXI

.
ST

F
.
MET

MET
MET
MET

M-

ENCE
PATH
RORAI

RORAI
L

L
RORAI
RORAI
L
L

R/
WLI
W3

NE
224
4-5"D

EXI
ST

WATE
R
UCTS

.F

W2
ENCE

6'

W1

CO R
AL W
SW AY
13t h ST
REE
T
22

L
CO R
AL W
ST
5 B/

SW AY

EF
13t
LS
A.

h ST
REE
U
2

T
2
R
4
V
+

TBL
ENDPROJ

E
8
Y
0.
0
ECT
2,41

ANKI
.
2

B/
2

NT
'RT

LSURVEY

ENTI
226

ONALLY
R/
WLI
NE
R/
WLI
NE

227

LEGEND
BICYCLE PATH
PEDESTRIAN PATH

MILLING & RESURFACING


R/

2' STONE PAVERS (SHLDR.)


EXIST. METRORAIL COLUMNS
WLI
NE
0

2' RESIN BONDED AGGREGATE (SHLDR.)

N
10

RON
LE I
DUCTI
DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST
Feet

2
40

28

DRAINAGE INLET

DETECTABLE WARNING
3 CHAMBER DRAINAGE WELL
2 CHAMBER DRAINAGE WELL

LI
CENSED PROFESSI
ONAL
A&P PROJECT

UNDERLI
NE PHASE I
I DATE
10/
13/
20
BI
CYCLE AND UBALDO FRANK LENA
SCALE

PEDESTRI
AN PLAN DESI
GNED BY M BR FL LI
CENSE NUM BER
A&P CONSULTI
NG TRANSPORTATI
ON ENGI
NEERS CORP.
TRANSPORTATI
ON & PUBLI
C W ORKS DEPT. DRAW N BY REG
43953
8935 N.
W .35t
h LANE,SUI
TE 200.DORAL,FLORI
DA 33172
PH:305-
592-
7283
SHEET NUMBER

CHECKED BY UFL DATE No. REVI


SIONS DATE BY
MI
AM I
-DADE FLORI
DA WWW.
APCTE.
COM
BY
19 PM

DATE
58:
3:

2'-1 3/4"

SAWCUT

2"
2 1/

ONS
FLUSH 1/4" POLYMERIC SAND JOINT FLUSH

SI
2"

REVI
2 1/
A D

B
A
1 1/2" SAND LEVELING COURSE

8"
B

No.
8"
dgn

NEERS CORP.
DA 33172
SPDTRD01.

TE 200.DORAL,FLORI
ON ENGI
oadway\

COM
7283
NG TRANSPORTATI

APCTE.
592-
\
ectr

PH:305-
oj

WWW.
h LANE,SUI
l
Underine Pr

A&P CONSULTI
W .35t
01-

8935 N.
DTPW -
DB18-

ONAL
\

CENSE NUM BER


UBALDO FRANK LENA
P:

CENSED PROFESSI
01 ASPHALT PAVING 03 STONE PAVER SHOULDER (TYP.)

43953
N.T.S. N.T.S.

FL LI

DATE
LI
A&P PROJECT

UFL
M BR

REG
20
DATE
13/
1/8" RESIN BONDED

10/

GNED BY

CHECKED BY
AGGREGATE

DRAW N BY
LEGEND

SCALE

DESI
2"
2 1/

A SUPERPAVE ASHPALTIC CONCRETE (FDOT TYPE SP-9.5, TRAFFIC B)

GN
BITUMINOUS SURFACE SEALER

I PAVEM ENT DESI


A B COMPACTED LIMEROCK BASE, OR EQUIVALENT (COMPACTED TO 98% MODIFIED PROCTOR)
1:
2

C EXISTING STABILIZED SUBGRADE (LBR-40 WILL BE USED WHEN EXISTING SUBGRADE IS INSUFFICIENT)
B

LS
EXIST. GROUND

DETAI
D 4"X4"X4" FLORIDA KEY STONE UNIT PAVER, SAW CUT, UN-FILLED
8"
20
13/
10/

C
I
ne Phase I

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Under
SheetSet i

ON & PUBLI
UNDERLI
02 RESIN BONDED AGGREGATE (RBA) OVER ASPHALT

TRANSPORTATI
N.T.S.

DADE
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ott

C-021
Pl
BY
DATE
DRAINAGE INLET WITH PEDESTRIAN GRATE DETAIL

18
"M
IN

ONS
(1, 2) INTEGRATED DUCTILE IRON W
I
DT

SI
FRAME & GRATE TO MATCH BASIN O.D. H

REVI
G
UI
DE
LI
NE

No.
NEERS CORP.
DA 33172
8" MIN THICKNESS GUIDELINE

TE 200.DORAL,FLORI
MINIMUM PIPE BURIAL

ON ENGI
DEPTH PER PIPE
DGN

MANUFACTURER

COM
7283
(3) VARIABLE INVERT HEIGHTS
DRDTRD01.

NG TRANSPORTATI
RECOMMENDATION

APCTE.
AVAILABLE (ACCORDING TO

592-
(MIN. MANUFACTURING
PLANS/TAKE OFF) TRAFFIC LOADS: CONCRETE SLAB DIMENSIONS ARE FOR
REQ. SAME AS MIN. SUMP) (5) ADAPTER

PH:305-
GUIDELINE PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE

WWW.
ANGLES

h LANE,SUI
DESIGNED TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS,
nage\

TRAFFIC LOADING, & OTHER APPLICABLE DESIGN FACTORS.


ACCORDING TO
SEE DRAWING NO. 7001-110-111 FOR NON TRAFFIC INSTALLATION.
PLANS

A&P CONSULTI
ai

W .35t
\
ectdr

8935 N.
oj
ne Pr

(3) VARIABLE SUMP DEPTH


ACCORDING TO PLANS
li

(6" MIN. BASED ON


Under

MANUFACTURING REQ.)

ONAL

CENSE NUM BER


01-

LAZARO FERRERO
CENSED PROFESSI
DTPW -

(4) VARIOUS TYPES OF INLET & OUTLET ADAPTERS AVAILABLE:

58025
4" - 24" FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL,
DB18-

ADS/HANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35), 4" MIN

FL LI
PVC DWV (EX: SCH 40), PVC C900/C905, CORRUGATED & RIBBED PVC
\
P:

DATE
LI
A&P PROJECT
WATERTIGHT JOINT THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER

M BR

REG
GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I,

LF
(CORRUGATED HDPE SHOWN)

2019
CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321.

DATE
BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE

09/

GNED BY

CHECKED BY
PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321.

DRAW N BY
SCALE

DESI
LS
NAGE DETAI
20 PM
58:
3:

2.68
5.42
20
13/
10/

DRAI
NYLOPLAST
I
ne Phase I

0.67'
NS TO WATERWAYS

C W ORKS DEPT.
NE PHASE I

DA
FLORI
DO NOTPOLLUTE DRAI
l
:Under
SheetSet i

ON & PUBLI
DUCTILE IRON

Ø 44.21" Ø 50.90"

UNDERLI

TRANSPORTATI

DADE
as
ed By: MRoj

-
AM I
PEDESTRIAN GRATE DETAIL

MI
SHEET NUMBER
ot
Pl t
BY
DATE
8'-0"

SIONS
I
n Fl

REVI
ow
n.
8"

Mi
0"

n.
-
2'

Mi

No.
A A

0"
4"

-
-

4'
5'

0"

NEERS CORP.
n.

DA 33172
-
8" 8"

Mi
2'
6"

n.
8"

TE 200.DORAL,FLORI
Mi

ON ENGI
ow
DGN

n Fl

COM
7283
DRDTRD02.

NG TRANSPORTATI
I

APCTE.
592-
PH:305-
1'-9" 1'-9" 2'-0" 2'-0"

WWW.
h LANE,SUI
Min. Min. Min. Min.
nage\

TOP SLAB PLAN

A&P CONSULTI
ai

W .35t
\
ectdr

8935 N.
oj
ne Pr

MH COVER MH COVER
l
Underi

8" 8"

ONAL

CENSE NUM BER


01-

LAZARO FERRERO
CENSED PROFESSI
8"
DTPW -

58025
Inv. El. Varies
DB18-

Inflow Pipes 2'-0" 6" 3'-0"

FL LI
\
P:

DATE
Steel Well Grate

LI
Over 24" Deep Well
2'-0"

A&P PROJECT
In Flow

M BR

REG

LF
2019
DATE
12"

09/

GNED BY

CHECKED BY
DRAW N BY
0"
n.

6"
Mi
-

n.
4'

SCALE
-
Mi

DESI
3'
0"
n.
Mi
-
2'

LS
8"

NAGE DETAI
20 PM
58:
3:

3'-6" 2'-0" 2'-0"

Min. Min. Min.


9'-4"
20
13/
10/

SECTION A-A

DRAI
I
ne Phase I

DRAINAGE WELL

C W ORKS DEPT.
NE PHASE I

DA
FLORI
l
:Underi

24" STEEL WELL GRATE

Design Notes
SheetSet

Heavy duty "bee hive" grate

ON & PUBLI
Openings: 1-½" maximum 1.Depth of Casing Varies, 60' min.

Total Opening: 1.7 sq ft minimum 2.Depth of Open Hole, 10'-20'.

UNDERLI
For 24" well, outer diameter = 29"

TRANSPORTATI
Steel well grate to be installed over 24" deep well.

DADE
Steel grate to be hot dipped galvanized after fabrication
as
ed By: MRoj

-
AM I
MI
SHEET NUMBER
ot
Pl t

You might also like