You are on page 1of 2

ANE - DELEGACAO DE CABO DELGADO

O Delegado Provincial
ENSAIO DE D.C.P.
..........................
Jorge Govanhica

CLIENT: ORATHA CONSTRUCOES Data: 07.08.2023

Projecto: ESTRADA ANE CHUIBA Efectuado Por: Armando Cheia

Camada: Base / Sub-base P1 Lado Direito Verificado Por: Maulana Juma

BLOWS READING PENET. D.C.P N C.B.R U.C.S. BLOWS READING PENET. D.C.P N C.B.R U.C.S.

0 5.50 0.0 125 22.5 1.5 0.0 563.33 3951.5


5 8.00 2.5 0.5 414.995 3,020 130 24.0 1.5 0.3 470.329 3371.4
10 9.50 1.5 0.3 470.329 3,371 135 25.5 1.7 0.3 458.836 3298.8
15 9.70 0.2 0.0 550.237 3,871 140 27.2 1.8 0.4 453.169 3262.9
20 10.00 0.3 0.1 543.77 3,831 145 29.0 1.5 0.3 470.329 3371.4
25 11.00 1.0 0.2 499.996 3,558 150 30.5 0.0 0.0 563.33 3951.5
30 11.50 0.5 0.1 530.997 3,751 155 0.0 0.0 0.0 0.0 0.0
35 11.50 0.0 0.0 563.33 3,952 160 0.0 0.0 0.0 0.0 0.0
40 11.5 0.0 0.0 563.33 3,952 165 0.0 0.0 0.0 0.0 0.0
45 12.00 0.5 0.1 530.997 3,751 170 0.0 0.0 0.0 0.0 0.0
### 50 12.00 0.0 0.0 563.33 3,952 175 0.0 0.0 0.0 0.0 0.0
### 55 12.00 0.0 0.0 563.33 3,952 180 0.0 0.0 0.0 0.0 0.0
60 13.00 1.0 0.2 499.996 3,558 185 0.0 0.0 0.0 0.0 0.0
65 13.50 0.5 0.1 530.997 3,751 190 0.0 0.0 0.0 0.0 0.0
70 14.50 1.0 0.2 499.996 3,558 195 0.0 0.0 0.0 0.0 0.0
75 14.50 0.0 0.0 563.33 3,952 200 0.0 0.0 0.0 0.0 0.0
80 15.50 1.0 0.2 499.996 3,558 205 5.0 0.0 0.0 0.0 0.0
85 16.00 0.5 0.1 530.997 3,751 210 0.0 0.0 0.0 0.0 0.0
90 17.00 1.0 0.2 499.996 3,558 215 0.0 0.0 0.0 0.0 0.0
95 17.50 0.5 0.1 530.997 3,751 220 0.0 0.0 0.0 0.0 0.0
100 18.00 0.5 0.1 530.997 3,751 225 0.0 0.0 0.0 0.0 0.0
105 18.50 0.0 0.0 563.33 3,952 230 0.0 0.0 0.0 0.0 0.0
110 19.00 0.0 0.0 563.33 3,952 235 0.0 0.0 0.0 0.0 0.0
115 20.00 1.0 0.2 499.996 3,558 240 0.0 0.0 0.0 0.0 0.0
120 21.00 1.0 0.2 499.996 3,558 245 0.0 0.0 0.0 0.0 0.0

O Tecnico Chefe de Departamento Tecnico


…………….. …………………
Maulana Juma Daúda José Cinquenta
D.C.P. TEST RESULTS

PENETRAÇÃO (mm)
4 6 8 10 12 14 16 18 20 22 0.0 4.0 8.0 12.0 16.0 20.0
0
6

PENETRATION (mm)
8
10
20 10
10
PANCADAS

11
D.C.P. N Value mm/Blow
40 12
12
12
12
60 12
12
13
14
80
15
15
16
100 16
17
18
18
120
19
19
20
140 21

0 100 200 300 400 500 600 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500
6 C.B.R. (%) 6
8 U.C.S. (Kpa)
PENETRATION (mm)

PENETRATION (mm)

8
10 10
10 10
10 10
11 11
12 12
12 12
12 12
12 12
12 12
12 12
13 13
14 14
15 15
15 15
16 16
16 16
17 17
18 18
18 18
19 19
19 19
20 20
21 21

You might also like