You are on page 1of 15

mandir

3'

2'-6''

1'-6''
living room
9'x14'11''

coffe table
6'-6''

tv unit
6'

4'-1''
partition

living room
passage
3'-11" 7'-5"

MIRROR WALL

partition
3' 2'-6"

bench
4'-10"
3'-10"

4'
2'-9"
1'-8"

7' table
centre

living room
5'-7"
CURTAIN

2'-5" 7'

4'
mandir tv unit

1'-8"
6'-5"

FURNITURE LAYOUT DRAWING NO .1.

MR & MRS DATE:- 14.02.2024

OPTION 1 SCALE - NTS


False Ceiling Level

9"
False Ceiling Level

2'-11"
6'-3"

5'-11"
9'-2"

Vanity Storage made


11'-5"

8'-5"

11'-5"
in W.P.C. Finished

4"
with Laminate

1'
Vanity Storage made

1'-7"
1'-11"

in W.P.C. Finished

5"
with Laminate
Vanity Storage made

2"
in W.P.C. Finished
with Laminate

5'-3"

SECTION A'A'
SECTION B'B'

7'-1"
5'-3"

5'-3"
6'

PLAN
CONFERENCE TOILET
False Ceiling Level False Ceiling Level

9"

9"
4'-5"
2'-10"
11'-5"

11'-5"
8'-5"

3'-9"

3'-9"
6"

5'-3" 5'-11"

SECTION B'B'

5'-11"

2'-5"
5'-3"

2'-6"

GENTS TOILET
6'

PLAN
False Ceiling Level False Ceiling Level

9"
9"
2'-10"

6'-3"
11'-5"
11'-5"

8'-5"
8'-5"

4'
4'-3"

1'-8"
2'
Vanity Storage made
in W.P.C. Finished
with Laminate

6"
6' 6" 5'-3"

SECTION B'B' 6' SECTION A'A'


7"
4"

4'-7"
1" 1'-8"
5'-4"

5'-4"
1'-2"

1'-6"

2'-7"

6'

female toilets PLAN


False Ceiling Level False Ceiling Level

9"

9"
4'-5"
2'-10"
11'-5"

11'-5"
8'-5"

3'-9"

3'-9"
6"

5'-3" 5'-11"

SECTION B'B'

5'-11"

2'-5"
5'-3"

2'-6"

GENTS TOILET
6'

PLAN
2'-1" 2'-1" 2'-1" 2'-1" 2'-5" 2'-1" 2'-1" 2'-1" 2'-1" 2'-5"

3'-10"

3'-10"
loft loft loft loft loft loft loft loft loft loft

3'-1" 5'-9"

1'-6" 1'-6"

1'-4"
1'-7"

1'-7"

1'-4"
1'-1"
profile glass

1'-7"

1'-7"
shutter profile glass
2'-11" shutter shutter shutter

2'-6"
open space

2'-6"
open space

2'-5"
2'-3" dish drainer 2'-3" dish drainer
profile glass

10"
profile glass

10"
1'

1'-4"

1'-4"
2'-11" shutter

1'-4"

1'-4"
1200 shutter
LG DIOS 1200

LG DIOS
2'-9" 3'
SAMSUNG
2'-11" 1'-11" SAMSUNG
2'-11" 1'-11"
2'-3" 2'-3"
mixer / grinder

1'-8"
mixer / grinder

1'-8"
storage storage
4'-10" 4'-10"
cuttlery
6"

1'-6" 1'-6"
drawer
cup and saucer shelf shelf shelf
9"

2'-4"

2'-4"
2'-7"

bottles

2'-8"

2'-4"
wicker baasket

2'-8"
and glass shutter shutter shutter shutter shutter wicker baasket
1'-1"

drawer vessel plain basket

3' 3' 1'-9" 1'-6" 1'-6" 2'-4" 1'-6" 1'-7" 1'-7" 2'-4" 1'-6" 1'-7" 1'-7"

working elevation
overheadunit

1'-6"
2' fridge
2' 7'-6"
2'-1"

10'-9" 2'-3"

11'-3"

7'-9"

2'-5" 2'-9" 2'-8"

fridge

2'-3"
2'-10"

2'-5"

kitchen
overheadunit
11'-3"

10'-9"

11'-3"
3'-9"
kitchen top
7'-6"

1'-6" 2'-7"
1'-2"

2'-8"
7'-10"

plan
False Ceiling Level

9"
False Ceiling Level

2'-11"
6'-3"

5'-11"
9'-2"

Vanity Storage made


11'-5"

8'-5"

11'-5"
in W.P.C. Finished

4"
with Laminate

1'
Vanity Storage made

1'-7"
1'-11"

in W.P.C. Finished

5"
with Laminate
Vanity Storage made

2"
in W.P.C. Finished
with Laminate

5'-3"

SECTION A'A'
SECTION B'B'

7'-1"
5'-3"

5'-3"
6'

PLAN
CONFERENCE TOILET
5" False ceiling False ceiling
4" 2"
2"
Loft 1'-4" 1' Loft
1" 2"

4" 2' 4" 7'-5" 4" 2' 4" Wardrobe Photo Frame
Frame 2" 2"
finished in pu
Wardrobe 2"

POP moldings
open able
Bay window shutters
7'-7" 4'-4"
Hanging Hanging 7' UP-LIFT TRAY
light 6'-4" light handle( as per
selection)
6" 6" Cushioned 2"
1"
headboard
2'-3" dawer dawer dawer dawer 6"dawer dawer
3'-6"
4" mattress 2'-2" 1'-7" 1'-7"
2'-6" shutter shutter shutter shutter 1'-7"
Cushioned 3 sides
1'-8" 1'-8" 1'-3" 1'-3" 1'-3" 1'-3"
1'
skirting to bed Room entrance
3" 3" 3" 3" 3" 3'-4" 3'-4" 5'-0 1/2" 4"
10'
Elevation A Elevation C
Elevation D

1'-4" Loft storage Loft storage Loft storage


6" 6"
12 equal parts Photo Frame
2'-3" eq eq Hanging space
3'-6" 3'-6" Shelf Shelf eq
4" 4"
3'-11"
3'-11" 3'-3" eq 3'-3" eq
1' Fabric tufted on ply backing 1'-3" Fabric tufted on ply backing
Hanging space Shelf Hanging space Shelf UP-LIFT TRAY
3" skirting to bed skirting to bed
eq Hanging space
3" 3" 3" eq eq
Front Elevation Front Elevation
DRAWER 7" DRAWER DRAWER DRAWER DRAWER DRAWER

GLASS DR GLASS DR
eq dawer dawer dawer dawer
3'-4" Shelf
Cushion tufted 2'-5" GLASS DR GLASS DR
2'-6" shutter shutter shutter shutter
on ply GLASS DR GLASS DR eq
1'-3" 1'-3" 1'-3" 1'-3"
1" 1"
6'-8" 6'-8" 3" Skirting Room entrance
4" 4"
3" 3'-4" 3'-4" 3'-4" 3'-4" 5'-0 1/2" 4"

1' Bed with storage 1' DRESSER SECTION


1'-3" hydraulic shutter opening 1'-3" WARDROBE SECTION D
3" 3"
6'-9" 6'-7"

Side Elevation Side Elevation

Side table finished with 4"


knobs as per

1'-2"
white semi gloss PU. 1' side side
4"
selection table table
1'-4" Loft
Metal legs 2'
3" 2'
Side table Front Elevation ABOVE-20"
HYDRULIC

5'-2"
WINDOW HT.-69" BED
C-18"

6'-8"
Full ht. storage
bay window

A
2'-3" OPENABLE
WARDROBE
B D

9'-11"
7'
Side table Side table
drawers below drawers below
C
2"bed back
3'-5" 6'
6'-6"

2'-5"
1" ply border Bed with storage
UP-LIFT TRAY MASTER BEDROOM
hydraulic shutter opening
3'-3" 5'
3" 4'-5"

1'-6"
1" 5'-10" 1"
dresser
LOW
HT.STORAGE
Elevation E
2'
3'-4"
PLAN
PLAN

4'-5"
STORAGE

6" DOOR HT.-84"


ABOVE-21"

DOOR HT.-84"
ABOVE-21"
paint finish

paint finish paint finish same as above


study overhead cabinet
V
groove
groove to 2" teakwood

with lintel level


to be aligned
open open space vertical
shutter

4'
golden
'T' patti shelves
open space open
space 1'-6" dia circular
shutters cut-outs with glass
finished in shelves inserted

6 eq div
lamination in center for

6'
display/books
softboard TV
1'-6"

1'-6"
soft board
3"

7"
indirect light drawers
glass mirror
6" 6"

9"
3"

shelves with golden upholstered headboard open space


2'-6"

2'-6"
border
side table side table
wooden louvers
bal

drawers wallpaper wardrobe drawers wallpaper same as study table wall mirror
skirting bedroom door skirting bronze mirror

ELEVATION B-B' ELEVATION A-A' ELEVATION C-C


3 eq div

24" space to packed 3" below headboard top circular


1'-3"

mirror with shelves


1'-9"

overhead storage golden border

9"

7"
glass shelves
study table full height dresser side table side table
eq eq storage with mirror wooden louvers
on shutter wooden battens with painted 2'-8"
5'-4" study table 1'-5"

13"
finished with paint border on all sides 3 eq div
with overhead
cabinet tv unit mirror
PLAN 3'-9"
3'-0"
PLAN
PLAN

B
space to packed 3" below headboard top

side table side table


wooden battens
finished with paint

5'-4"
A study table A'
with overhead
cabinet

bed
1'-3"
1'-9"

c c'
tv unit
3 eq div
mirror 7" 1'-7" 2'-8"

glass shelves

9"
circular cut-outs
with glass shelves
for display/books
mirror
TOILET with golden
border

wardrobe

B'

DAUGHTER'S BEDROOM DETAILS

You might also like