Professional Documents
Culture Documents
Moving on up.
crane systems
Do you have no appropriate supporting
structure to which to attach the crane
installation in your building?
2
We deliver the right solutions
for individual applications
3
Moving on up.
crane systems
We deliver the solution
Welding qualifica-
tions according to
EN 1190-1
Installation
For the installation, place your trust in our experienced
qualified engineers. The installation is preceded by a
technical clarification process of both crane and support
structure, to ensure that everything fits as it should and
the installation time is as brief as possible.
4
Gallows supports
Auxiliary girders
5
Moving on up.
crane systems
Support consoles
6
Rear-side anchoring of the support console to the lami-
nated wooden beam.
Tie consoles
Tie consoles enable the HB crane system to be connec-
ted directly beneath the supporting structures of building
ceilings. The tie hole is drilled from the side and there-
fore does not need to be accessible from above for the
installation. Tie consoles are available for wooden and
various types of reinforced concrete trusses.
7
Moving on up.
crane systems
Embracing brackets
1)
1)
oben unten
upper side lower side
Bmax bmin
mm mm kg HB250 ≤ 26 kN kg
HB160/200/250 ≤16 kN
HB160/200/250 ≤ 16 kN HB250 ≤ 26 kN
nderungen vorbehalten!
9
Moving on up.
crane systems
Roof stools
Roof stools are used if large sus- existing supporting structures. Pro- ably. Additional stiffeners against
pension heights exist between file suspension extensions are an swinging are therefore no longer
ceiling and crane installation. alternative to suspension with very necessary.
These are fastened with dowels, long threaded rods. They reduce
by clamping or bolting onto the the pendular movement consider-
10
Complete solutions from ABUS
HB support structures, designed to ping isolated or connected work advise you on-site.
meet specific requirements, offer areas with the ABUS HB crane sys-
comprehensive solutions for equip- tem. Our specialist team will gladly
11
Moving on up.
crane systems
Further product information...
…on ABUS lightweight crane systems and on our entire product range will be gladly forwarded to you.
You can also view these directly and download them from our homepage.
MODULARITY
HB-System
WHICH PATH IS THE RIGHT
ONE?
QUALITY
RELIABILITY
Tailor-made modular crane systems
for Safe Working Loads up to 2000 kg
FLEXIBILITY
Stand: 18.6.2014
2 3
(x 10 + y 285) ACHTUNG – Seitenzahlen bei Prospekten rechts + links !! (x 190 + y 285)
–1–
ABUCompact
Moving on up.
Moving on up. crane systems
Name:
Company:
Street:
Postal code/City/Country:
Telephone:
9.15
E-mail:
AN 120221GB
Date Signature