DET-413 approval by the consultant before commencing any work.
14
00
8. The contractor shall confirm the line out of the design prior to
the commencement of work.
5mm THK METAL
30 900
9. The contractor shall coordinate with elevator contractor for
STAIRS WELDED TO size of shafts. Pit depths, override dimension, prior to execution
2
of work.
STRINGER
36
10. All ceiling levels show the actual ceiling height.
40
00
M 01 11. All materials and finishes shall be submitted to the supervising
0
TYPE 3 RAILING office for approval before installation.
40
50x50x3mm THK. 12. All building levels are based on an assumed datum of ±0.00 at
M 01
50
0
the floor finished level of external walkway at the existing main
GLASS RAIL FRAMING entrance.
WELDED TO METAL STAIRS
M 01
5
14
50
50x100x5mm THK.
00
KEY PLAN:-
N
METAL STRINGER
M 01 100 MECCA
MEZZANINE OPPORTUNITY
866sqm
TYPE 3 RAILING
FRONT ELEVATION
M 01 void below
void below
0 0
14
50x50x3mm THK
GLASS RAIL FRAMING
WELDED TO METAL STAIRS
6 TYPE 3 RAILING
31 M 01 LEGEND:-
M 01
5mm THK METAL STAIRS
300 1400
M 01
300 300
5
55
50
150
1400
EXPANSION JOINT 2
1200 DET-413
150
150
2108 300
55
SIDE ELEVATION
4 BLOW-UP DETAIL
1 PLAN DET-413 SCALE 1:6
DET-413 SCALE 1:25
1200
1200
1200
CLIENT:-
150
1200
1200
M 01
4500
4500
PT 10
2400
PT 10
2400
450
40x40x3mm THK.
SHS FRAME
1200
PERFORATED PT 10
900
METAL PANEL
PT 10
DRAWING TITLE
STAIR 2 DETAIL