Professional Documents
Culture Documents
Date, time & place of pre-bid 08.01.2024 at 11.30 hrs. hrs in the Office of Executive
4
meeting Engineer, P. H. Division Biharsharif
7
Date and time of opening of 18.01.2024 at l6:00Hrs on www.eproc2.bihar.gov.in
technical bid
Date and time of opening of financial 1o be intormed later after the approval of technical bid.
bid
9. Details of works:
Amount Costof BSEDC
No. of of Tender
schemes
Estimated
Earnest Document
Bid Completion
Group Cost (in Period
No.
Name of Work
ina Money (non Processing
Lakh) Fee (in (in months)
Group.. (in refundable)
Rs.)
Lakh) in Rs.
2 3 6 7
Name of Work: Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under
Har Ghar Nal Ka Jal" nischay yojna in areas having ground water quality issues; with Electric Driven Pumps in the District of Nalanda.
Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri
Grameen Peyjal Nishchay Yojna (Non Quaity Affected) Under P.H. Division.
S.N. Block Panchyat Habitation Ward
Aant
1 Bishunpur
SBNQ 2 Benia Bigha 1
8 269.87 5.40 10000.00 5900.00 6M
01 BEN Arawan
Beldariya 4
3 par
Ben Rannubigha 1
- aa-=
Aayatnga
SN Panctyat
Pahari 12
Pahar
3
13
Musatcr
Putpra
Pekthntrtf
5 Prlsa
SENO 11 235 407
BYagarf
Waatat
Samghu
Kara
Satat
11
Turgi Tungs
Dhanai
2
DsI
Bela
Bbipr
12
Bgaryz
6
13 22259
3
7
5
Petar
Prctiaa
10 Ssrsa
11 Gosináp
12
13 Crrdarz
Parchyt Haoeon Ward
Latatiga 10
Gror Paerag
Gru Sfal biga
SENO Locpr Belari
257 63 535 100000O
Raigr Lodipur Amrgy
Naub 3