You are on page 1of 9
PROPOSED CMPI NATIONAL HEADQUARTERS Fire Sprinkler Reports for Prepared By: July 04, 2022 Elite Software Development, inc. Proposed CMP! National Headquarters Page 2 General Project Data Report ‘General Data Project Title: Designed By’ Code Reference: Client Name: Address: ‘Company Name: ‘Company Address: Phone: Building Name: Contact at Building (CMP! National Headquarters Date: July 04, 2022 Approving Agency: Phone: City, State Zip Code: Representative: Reynaldo S. Alcala Jr City And State: Building Owner: Phone at Building Changan Motors Philippines Inc. Project Data Description Of Hazara: Ordinary 1 Design Area Of Water Application 1500 f° Default Sprinkler K-Factor: 5.65 Inside Hose Stream Allowance: 50.00 gpm In Rack Sprinkler Allowance: 0.00 gpm Sprinkler Specifications Make: Globe Size 1 Sprinkler System Type: wet Maximum Area Per Sprinkler: 120 f* Default Pipe Material: SCHED 40 WET STEEL Outside Hose Stream Allowance: 0.00 gpm. Model: 6 Temperature Rating: 160 [Renesas Dts | Source Of Information: Test Hydrant ID: Date Of Test Hydrant Elevation: of Static Pressure: 80.00 psi Test Flow Rate: 250.00 gpm _Test Residual Pressure: 65.00 psi Calculated System Flow Rate: 210.31 gpm Calculated Inflow Residual Pressure: 31.48 psi Available Inflow Residual Pressure: 69.11 psi Calculation Mode: Demand HMD Minimum Residual Pressure: 7.00 psi Minimum Desired Flow Density: 0.18 gpnvft? Maximum Water Velocity: 20.00 fs Maximum Frictional Loss / 100 feet: 20.00 psi Number Of Active Nodes: rT Number Of Active Pipes: 10 Number Of Inactive Pipes: 0 Number Of Active Sprinklers: 10 Number Of Inactive Sprinklers: 0 Monday, duly 04, 2022 Elite Software Development, Inc. Proposed CMP! National Headquarters Page 3 ire Sprinkler Input Data Node Non-Sprinkler Node No, Node Description Area Group Ser timate tre) Bevaton — Dichage 2 Sprinkler 5.65 1820 23.00 0.00 3 Sprinkler 5.65 sat 23.00 0.00 x Sprinkler 5.65 16.90 23.00 0.00 5 Sprinkler 5.65 1467 23.00 0.00 6 Sprinkler 5.65 11.09 23.00 0.00 z Sprinkler 5.65 10.15 23.00 0.00 8 Sprinkler 565 16.50 23.00 0.00 9 Sprinkler c 5.65 1431 23.00 0.00 10 Sprinkler c 5.65 10.78 23.00 0.00 " Sprinkler 8 5.65 10.15 23.00 0.00 1 Non Sprinkler NA 31.48 0.00 0.00 Monday, July 04, 2022 Elite Software Development, ne. Proposed CMP! National Headquarters Page + ire Sprinkler Input Data Pea. End. Pipe Description Diameter oe ee Diet | cegh © Crean gamers (inch) (feet) (feet) (feet) ps) 21 SCHED4oWET STEEL 4.0001 22900 000 22900 120 2 4 SCHED4OWETSTEEL 1.5000 600 000 600120 23 SCHED4OWETSTEEL 25000 1000 0.00 1000120 38 __SCHED4OWETSTEEL 1.5000 600000 600120 45 _SCHED4OWETSTEEL 1.2500 900 000 900 120 5 6 _SCHED4OWETSTEEL 1.0000 900 000 900 120 6 7 _SCHED4OWETSTEEL 1.0000 900 000 900120 8 9 _SCHED4OWETSTEEL 1.2500 900 000 900 120 9 10 SCHED4oWeT STEEL 1.0001 900 000 900 120 1011 SCHED40WeTSTEEL 1.0000 900 000 900 120 Monday, July 04, 2022 Elite Software Development, Inc. Proposed Pt Netonl Hews anes ire Sprinkler Output Data Pipe Segment Pipe Pipe Sprinkler Flow Non-Sprinkler Flow Beg. Node _ Imbalance Beg. End. Type Flow Rate At Beg. Node Out (+) Int) Residual —_ Flow At Beg. Node Node Group. (gpm) (gpm) Pressure (psi) __Node (gpm) 2 1 1 -210.31 24.11 0.00 0.00 18.20 0.31124 2 4 oO 81.47 24.11 0.00 18.20 2.3 0 10443 2a 0.00 48.20 ry 2382 000 0.00 1777 0.00669 ee er) 80.62 aes | 0 = 000 wit 4 2 0 81.47 23.23 0.00 0.00 16.90 0.00247 4 5 oO 58.24 23.23 0.00 0.00 16.90 5 4 0 68.24 21.64 0.00 0.00 14.67 0.00438 56 36.60 2164 0.00 0.00 1487 Bog 36.60 1881 0.00 0.00 4109 -0.04898 6 7 oO 17.74 18.81 0.00 0.00 11.09 7 6 0 17.74 18.00 0.00 0.00 10.15 0.25954 8 3 0 80.62 22.95 0.00 0.00 16.50 0.01058 8 9 o 57.66 22.95 0.00 0.00 16.50 oO. ee 1 57.6 2137 000 © 0.00 1431 0.00876 pene 36.28 fie somes ote 1431 10 9 1 -36.28 18.55 0.00 0.00 10.78 0.05050, 10 44 0 17.67 18.55, 0.00 0.00 10.78 ch 10 oO 17.67, 18.00 0.00 0.00 10.15 0.32574 1 204 210.31 000 000 ~— 0.00 31.48 Monday, July 04, 2022 Elite Software Development, Inc. Proposed CMP! National Headquarters Page 6 ire Sprinkler Output Data Nom. Dia Beg. Nodal Elevation Discharge R&sidual inside Dia, (9PM) F.LJFT Pipelen. _PF-PSI End. KFactor (feet) (apm) Pressure ‘C-Value. Velocity Fittings —_Fit-Len. PEPSI Node oe (si) (ps) Type-GrpTot-Len. —PV-PSI z 5.65 23.00 24.11 18.20 1.50 81.47 6.00 1.304 4 565 23002323. 1600161 12.84 0.00 0.000 ‘SCHED 40 WET STEEL 120 oO 6.00 0.014 2 565 ©2300-2411 1820 «28010443 0.04300 10.00 0.429 3 565 230023821777 «= 2.47 «7.00 === 0.000.000 SCHED 40 WET STEEL 120 0 10.00 0.003 3 5.65 23.00 (23.82 A777 1.50 80.62 0.21300 6.00 1,279 ee eee mone ee 0.00 0.000 SCHED 40 WET STEEL 120 oO 6.00 0.013 ge ee ee oe oe 5 565 23002164 «1467 1.381249 = 0.000.000 ‘SCHED 40 WET STEEL 120 0 9.00 0.018 5 56523002164 += 1467 1.00» 36.60 039800 «9.008.585 6 5.65. 23.00 18.81 11.09 1.05, 13.59 —_ 0.00 0.000 ‘SCHED 40 WET STEEL 120 0 9.00 0.034 6 565 = 2300S tat 14.09 4.00-S 17.74 «0.10400 © 9.000.989 2 Goo eo t) e 0.00 0.000 SCHED 40 WET STEEL i20 0 900 0016 er ee a oc ee ee 9 5.65, 23.00 21.37 14.31 1.38 12.37 —_ 0.00 0.000 SCHED 40 WET STEEL 120 oO 9.00 0.018 9 565 230021371431 4.00 36.28 0.39200 9.003.826 105.65 -23.00 1855 1078105 13.47 0.00 0.000 SCHED 40 WET STEEL i20 1300 0.034 i Ge ae thee os i, een a 1 5.65, 23.00 18.00 10.15 1.05, 6.56 _ 0.00 0.000 SCHED 40 WET STEEL 120 0 9.00 0.016 1 0.00 0.00 0.00 31.48 4.00 210.31 0.01400 229.00 3.314 2 565 2300 att 1820 403, OC 0.00 9.959 SCHED 40 WET STEEL 120 229.00 0.001 Monday, July 04, 2022 Elite Software Development, Inc. Proposed CMP! National Headquarters Page 7 ire Sprinkler Output Data Flowing Flowing Sprinkler Residual Flowing Sprinkler Sprinkier MG CIUP Sprinkler Elevation Pressure FIOMMNES Density Discharge Node No. Factor (feet) (psi) (gpmnift?) (gpm) no 5.65 23.00 1015 120.00 0.18 48.00 ‘Sub Totals For Group B 120.00 0.418 78.00 9 oc 5.65 23.00 143112000 oe 2137 wc 5.65 23.00 4078 120.00 015 4855 ‘Sub Totals For Group C 240.00 0.17 39.93 2 5.65 23.00 182012000 0.20 24M ‘Sub Totals For Non-Group 1120.00 020 24.vi 3 5.65 23.00 4777 120.00 0.20 23.62 ‘Sub Totals For Non-Group 120.00 0.20 23.82 4 5.65 23.00 1690 120.00 0.9 23.28 ‘Sub Totals For Non-Group 120.00 0.19 2323 5 5.65 23.00 1467 120.00 0.18 21.64 ‘Sub Totals For Non-Group 7120.00 0.18 2.64 6 5.65 23.00 41.09 420.00 0.16 1881 ‘Sub Totals For Non-Group 120.00 0.16 7881 i 5.65 23.00 4015 120.00 0.18 18.00 ‘Sub Totals For Non-Group 120.00 0.415 18.00 8 5.65 23.00 1650 120.00 0.19 22.95 ‘Sub Totals For Non-Group 7120.00 0.19 22.95 Toials For All Groups 7200.00 01921048 Monday, July 04, 2022 Elite Software Development, Inc. Proposed CMP! National Headquarters Page 8 ire Sprinkler Output Summary HMD Sprinkler Node Number: " HMD Actual Residual Pressure: 10.15 psi HMD Actual GPM 18.00. gpm ‘Sprinkler System Type: WeT ‘Specified Area Of Application: 1500.00 ft ‘Minimum Desired Density: 0.15 gpmit Actual Density: 0.14 gpmit? ‘Actual Area Per Sprinkler: 150.00 fi ‘Sprinkler Flow: 210.48 gpm Average Sprinkler Flow: 21.05 gpm ‘Maximum Flow Velocity (In Pipe - 6) 13.69 fps ‘Maximum Velocity Pressure (In Pipe —- 6) 0.03 psi ‘Allowable Maximum Nodal Pressure Imbalance: 0.010 psi ‘Actual Maximum Nodal Pressure Imbalance: 0.006 psi ‘Actual Average Nodal Pressure Imbalance: 0.002 psi ‘Actual Maximum Nodal Flow Imbalance: 0.326 gpm ‘Actual Average Nodal Flow Imbalance: 0.094 gpm ‘Number Of Unique Pipe Sections: 10 ‘Number Of Flowing Sprinklers: 10 Sprinkler Flow: 210.48: gpm Non-Sprinkler Flow: 0.00 gpm Total System Demand Flow: 210.48. gpm ‘Minimum Required Residual Pressure At System Inflow Node: 31.48 psi Demand Flow At System Inflow Node: 210.31 gpm Monday, July 04, 2022 Elite Software Development, ne. Proposed CMP! National Headquarters Page 9 ire Sprinkler Output Data 100 Py 0 10 a 2 80 “ x a ‘0 ° a 4 8 9 10 Adjusted Hydrant Data Static Pressure: 80 psi Test Residual Pressure: 65 psi Test Flow Rate: 250 gpm Demand Point Data Calculated Residual Pressure: 31.48 psi Calculated Fiow Rate: 210.31 gpm Excess Available Inflow Residual Pressure: 37.63 psi Monday, July 04, 2022

You might also like