Professional Documents
Culture Documents
DAHRMABAD
STR.NO.: 1/1
Type of Structure ROB
Design Chainage 0+547.8
Proposed Span (m) 1x22.0+1x37.28+1x22.0m
0+550
0+500
0+600
Remark SPAN
TO UMRI TO BASARA
'3'
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
A1
P1
P2
A2
RAMP RAMP
BASARA
SECTION A-A PROW PROW PROW PROW PROW PROW PROW PROW PROW
A1 P1 P2 A2
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
KEY PLAN
DAHRMABAD
B (NOT TO SCALE)
BH-1
BH-3
I. GENERAL NOTES:
RAMP
A A
BASARA
RAMP
IV. IMPORTANT NOTES:
DETAIL-'3'
®
'1'
DETAIL-'2'
'2'
DETAIL-'1'
MUDKHED-SECUNDERABAD SECTION
PUBLIC WORKS DEPARTMENT GOVERNMENT OF MAHARASHTRA PUBLIC WORKS DEPARTMENT - DESIGN CIRCLE DIVISIONAL OFFICE HEAD QUARTERS
DESIGNED JS
RL Galdhar Prashant Kore G.H. Rajput B.S. Pandhare H.N. Shaikh M.I. Shaikh S.S. Bhonge Vasuprada Consultants Pvt. Ltd. AUTHORITY OF WORK:- DEPOSIT WORK
Surya Prasad Y.Srinivas Sabhiram Y.Sriteja A.Koteshwar Rao T.Neela Pavani B.Venkanna Mothilal Bhookya S.Sajid P.Tarun B.Chintaiah C. Nagaraju CHECKED YPK
SCALE: AS SHOWN
Assistant Executive Engineer Executive Engineer Superintending Engineer
I/C S.D.E Executive Engineer Chief Engineer (Designs), Flat C-11, CEL Apartments (EXECUTED BY PWD, MAHARASHTRA)
Chief Engineer Vasundhara Enclave,
P.W. Design Division P.W. Design Division P.W.Department,
Dharmabad Sub-Division Bhokar Division Nanded Circle P.W.Region-Nanded SSE/DRG/BRIDGES/HYB DEN/BRIDGES/HYB DEN/NORTH/HYB SR.DEE/TRD/HYB SR.DEE/HYB SR.DSTE/CO-ORD/HYB SR.DOM/HYB SR.DEN/CO-ORD/HYB DRM/HYB JE/DESIGN/HQ SSE/DRG/HQ AXEN/ROB DY.CE/BR.D CBE/SC New Delhi -110 096 APPROVED NGK DATE : OCT-2023 SIZE : A0
Aurangabad Aurangabad Navi Mumbai