Session 13 – Planning and Selection of
10-30%
Equipment - 1
Aritra Halder
| Aritra Halder | Assistant Professor
Assistant Professor | School of Construction
Predictable behaviour – easier planning Avoidance of delay due to spare parts & repair
Social of
Labour Overseas Quality and Development
objectives of Lesser personnel – easy control Less lead time to mobilize and start work
Relationships Projects Performance of Industries
the project
Helps in Skill, Tech, Industrial Development No requirement of disposal of waste parts and spare
1
12-04-2023
2
12-04-2023
Manpower Planning for Equipment Management Factors Governing Manpower Planning For Equipment
• Essential requirements for a sound manpower planning: • Manpower requirement is directly related to the total hours worked per
day by the employee in a project.
–It should be done sufficiently in advance.
• The factor “number of shifts” should be considered while running the
–It should be reviewed periodically, so that modifications or construction project in shifts and deciding manpower requirements.
alterations, if any, can be incorporated. • Nature of work includes adverse weather, climatic conditions,
–The planning should have top management support. topography, toughness etc. All these govern manpower planning.
–It should be need based. • Normally following standard is considered as guidelines for measuring
–It should be economic in nature. workers' efficiency:
– Operators having one year of job experience = 85%
–It should incorporate the elements of flexibility and elasticity. – Newly appointed operators after training = 60%.
–It should provide a suitable policy.
3
12-04-2023