You are on page 1of 1

NOTES :

Copyright reserved - no part of this drawing shall be


use for any other purpose other than in connection
with the project for which it is intended except with
prior written consent of PT. Suryaputra Mandiri
Bersaudara.

This drawing is indicative of design intent only and


does not support to identify or solve completely all
problems related to the construction

Unless otherwise stated :


All dimension are in millimeters. Do not scale direct
from drawings. All dimensions are to be verified when
in doubt.

Contractor shall be responsible to verify dimension at


site where required.

OWNER / CLIENT :

PROJECT :

4335 1040 2200 1040 9020 1240 7900 1240 14085 TOKO DAGING
NUSANTARA

300 LOCATION :
200 613 662 1850 1000 1000 2000 1000 1000 7300 1000 1200 7700 1200 4900 150 8362 618 200
MATRAMAN
150 4700
DAK ATAP DAK ATAP
+8.395 SFL +8.395 SFL CONTRACTOR :

940
500
+7.455 FFL +7.455 FFL +7.455 FFL

4421
4550 PLAFON LT 2
3000

3000
4105
2000 11800 4800 12350 4800 5725 150
TOILET PRIA KEDAI STEAK NUSANTARA RESTAURANT OUTDOOR KEDAI STEAK NUSANTARA
175 175

950
+4.455 FFL +4.455 FFL +4.405 FFL +4.455 FFL

1655
1105

955
KEYPLAN:

7455
200
1025
+3.75 FFL +3.75 FFL +3.35 FFL
+3.35 FFL 1175 +3.35 FFL +3.35 FFL +3.50 FFL 2250 150
+3.20 FFL PLAFON LT 1
200 +3.00 FFL

3500
2642 35900 3225 250
3350
3350

NOTE FOR CONSTRUCTION:


TOKO DAGING NUSANTARA TERAS TOKO DAGING NUSANTARA
-0.15 ±0.00 FFL ±0.00 FFL ±0.00 FFL

1300
-0.15
LEVEL OUTDOOR

-1.30
LEVEL JALAN RAYA

4850 8000 7000 3900 5000 2250 5150 2850


200 1042 1675 39000 500

10 9 8 7 6 5 4 2 1

Accepted By : Checked By :

POTONGAN A - A
Designer Designer

SHEET NUMBER:

You might also like