400MW KHAVDA SOLAR PARK-P4 , GUJARAT

1. PURPOSE:

The Purpose of this Calculation is to be determine the Cross Sections of the AC Cables - to be installed in PV plant.

2. REFERENCES:

 SLD-Single line diagram AC

 Cable GTP and Derating Chart

3 BASIS OF CALCULATION:

 Continuous Current Rating

 Voltage Drop

 Grouping Factors

 Maximum Ambient Temperature of 50 deg c.

 Maximum Average Ground Temperature of 45 deg c.

4. GENERAL:

 Current carrying capacities of the cables have been taken from cable supplier GTP

Total % voltage drop of AC Cables ( ICOG to Subpooling) 0.5%