1. PURPOSE:
The Purpose of this Calculation is to be determine the Cross Sections of the AC Cables - to be installed in PV plant.
2. REFERENCES:
3 BASIS OF CALCULATION:
Voltage Drop
Grouping Factors
4. GENERAL:
Current carrying capacities of the cables have been taken from cable supplier GTP