-ALL DIMENSIONS IN THE DRAWINGS AND
MOCKUP SHALL BE VERIFIED ON SITE BEFORE
STARTING THE WORK.
BUKAAN J1 3.80x2.50 BUKAAN P1 1.70x2.10 -THE CONTRACTOR SHOULD MAKE AN ON-SITE
FFL. + 0.625 DARI LANTAI FFL. ± 0.00 DARI LANTAI MOCKUP FOR ARCHITECT APPROVAL BEFORE
STARTING THE WORK.
-ARCHITECT SHALL INFORMED IN WRITING OF
137 380 43
ANY DIFFERENCES.
-THE FINISHING THICKNESS MAY VARY DUE TO
62
TECHNICAL FACTORS ON-SITE OR THE
AVAILIBILITY OF FINISHING MATERIALS.
PROJECT TITLE
17
0
ENN WELLNESS CENTER
30
HAIRWASH
FFL. - 0.40 2023_28_WSP
DRAWING STATUS
17
1
SALON BUKAAN J2 1.70x2.10
100
15
DENAH BUKAAN PINTU JENDELA
FFL. - 0.40
BUKAAN J4 1.70x2.10 LS MS GP
01 3.8.2024 1:100
KEYPLAN
1
DENAH BUKAAN PINTU JENDELA
SLON-A4-001
1:100
Jl. Mawun, Pujut, Lombok Tengah, NTB 83573
NOTE
-ALL DIMENSIONS IN THE DRAWINGS AND
MOCKUP SHALL BE VERIFIED ON SITE BEFORE
STARTING THE WORK.
380 -THE CONTRACTOR SHOULD MAKE AN ON-SITE
101 179 101 MOCKUP FOR ARCHITECT APPROVAL BEFORE
STARTING THE WORK.
-ARCHITECT SHALL INFORMED IN WRITING OF
ANY DIFFERENCES.
1
SLON-A4-101 -THE FINISHING THICKNESS MAY VARY DUE TO
TECHNICAL FACTORS ON-SITE OR THE
AVAILIBILITY OF FINISHING MATERIALS.
52
Ø2
125
125
50
50
06
Ø2
PROJECT TITLE
103
Ø2
ENN WELLNESS CENTER
51
83 89
5
PROJECT NUMBER
6
259
259
7
Ø1 2023_28_WSP
88
84
1
SLON-A4-101
DRAWING STATUS
156
156
155
2
SLON-A4-101
2 CONSTRUCTION DRAWING
SLON-A4-101
64
64
DETAIL PINTU JENDELA
SLON-A4-101
62
63
MUKA LANTAI MUKA LANTAI
FFL ± 0.00 FFL ± 0.00 DRAWN BY CHECKED BY APPROVED BY
LS MS GP
01 3.8.2024 1:100
15
170
KEYPLAN
380
1 1
DETAIL JENDELA J1 DETAIL JENDELA J2
SLON-A4-101
1:100 SLON-A4-101
1:100
Jl. Mawun, Pujut, Lombok Tengah, NTB 83573
NOTE
-ALL DIMENSIONS IN THE DRAWINGS AND
MOCKUP SHALL BE VERIFIED ON SITE BEFORE
STARTING THE WORK.
-THE CONTRACTOR SHOULD MAKE AN ON-SITE
82 179 82 MOCKUP FOR ARCHITECT APPROVAL BEFORE
STARTING THE WORK.
-ARCHITECT SHALL INFORMED IN WRITING OF
ANY DIFFERENCES.
-THE FINISHING THICKNESS MAY VARY DUE TO
1
SLON-A4-201
TECHNICAL FACTORS ON-SITE OR THE
AVAILIBILITY OF FINISHING MATERIALS.
52
PROJECT TITLE
6
Ø20
103
ENN WELLNESS CENTER
87
Ø1
Ø1
51
78
1
SLON-A4-201
PROJECT NUMBER
5
2023_28_WSP
DRAWING STATUS
156
156
2
SLON-A4-201
CONSTRUCTION DRAWING
2
SLON-A4-201
205
DETAIL PINTU JENDELA 2
SLON-A4-201
62
DRAWN BY CHECKED BY APPROVED BY
01 3.8.2024 1:100
KEYPLAN
15
342
80 80
5 5
1 1
DETAIL JENDELA J3 DETAIL JENDELA J3
SLON-A4-201
1:100 SLON-A4-201
1:100
Jl. Mawun, Pujut, Lombok Tengah, NTB 83573
NOTE
-ALL DIMENSIONS IN THE DRAWINGS AND
MOCKUP SHALL BE VERIFIED ON SITE BEFORE
STARTING THE WORK.
-THE CONTRACTOR SHOULD MAKE AN ON-SITE
MOCKUP FOR ARCHITECT APPROVAL BEFORE
STARTING THE WORK.
-ARCHITECT SHALL INFORMED IN WRITING OF
ANY DIFFERENCES.
-THE FINISHING THICKNESS MAY VARY DUE TO
7
82 66 162 TECHNICAL FACTORS ON-SITE OR THE
AVAILIBILITY OF FINISHING MATERIALS.
1
SLON-A4-301
PROJECT TITLE
6
11
ENN WELLNESS CENTER
83
1
SLON-A4-301 PROJECT NUMBER
2023_28_WSP
2 2
192
64
64
SLON-A4-301 SLON-A4-301
DRAWING STATUS
CONSTRUCTION DRAWING
62
SKALA 1:20 SKALA 1:20
MUKA LANTAI MUKA LANTAI
FFL ± 0.00 FFL ± 0.00 DETAIL PINTU JENDELA 3
SLON-A4-301
39
15
LS MS GP
39
66 30 77 30 66
REV DATE SCALE
01 3.8.2024 1:100
170
KAN
SLON-A4-301
39
KEYPLAN
1
39
DETAIL JENDELA P2
SLON-A4-301
1:100
39
39
44 104
DEP
SLON-A4-301
1
DETAIL JENDELA J4
SLON-A4-301
1:100