Professional Documents
Culture Documents
ro ATTENTION OF THE ARCHITECT AND GET RESOLVED WITHIN SEVEN (7) WORKING
DAYS OF ISSUES OF THE DRAWING (OR) PRIOR TO THE PROCUREMENT /
ad EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER.
- DRAWING APPROVAL IS FOR THE CONFORMITY WITH OUTLINE DESIGN INTENT AND
DOES NOT RELIEVE THE CONTRACTOR / SUBCONTRACTOR FROM FULL
RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR PURPOSE OF
DESIGN.
83°
146'-3"
SITE DIMESNIONS:
176°
TRENCH
104'-10"
ro
ad
LEGENDS:
120'-7"
171°
56'-10"
174°
170°
81'-9"
PROJECT:
109'-2"
ARCHITECTS:
170°
TRENCH
SITE
ad AUTHORIZED SIGNATURE
80'-6"
ro
roa
d
118°
174°
ARCHITECT/ENGINEER CLIENT
117° 95°
166°
116'-11"
151'-8"
MEP CONSULTANTS:
99'-1" 59'-4"
adjacent site
TRENCH
SUBJECT:
adjacent site
SITE PLAN
DRAWING NO:
REV NO
MYSORE/ARC/CMR/RST/JUL/2022
01