You are on page 1of 1

NOTRH

KEY PLAN:

201

1 NOTES:

1 2 3 4 5 6 7 8 9 10 01- THIS DRAWING IS THE PROPERTY OF VERFORM DUBAI,UAE. IT IS NOT


ALLOWED TO REPRODUCE ITS CONTENT IN ANY FORM EXCEPT FOR THE
PURPOSE FOR WHICH IT IS INTENDED.

02- THE DRAWING IS NOT TO BE SCALED- STATED DIMENSIONS ONLY ARE TO


BE CONSIDERED.

03- ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE


ENGINEER AND RESOLVED PRIOR TOO COMMENCEMENT OF ANY WORK.

04- ALL DIMENSIONS ARE IN MILLIMETERS, LEVELS ARE IN METERS UNLESS


NOTED OTHERWISE.

05- THE DRAWING IS TO BBE READ IN CONJUNCION WITH OTHER RELEVANT


ARCHITECTURAL, STRUCTURAL, INTERIOR DESIGN AND MEP DRAWINGS AND
GYPSUM TILES CEILING ALL RELEVANT SECTIONS OF THE SPECIFICATION DOCUMENTS.

06- ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AND APPROVED BY THE


CONSULTANT/ ENGINEER PRIOR TO ANY COMMENTS OF WORK.

A A Rev. Date Description


0.75 2.20 2.20 0.75 0.75 2.20 2.20 0.75

1.40

B B ISSUES
GYPSUM BOARD CEILING
REVISION
C C PROJECT:

7.35

GYPSUM BOARD CEILING


D D CLIENT:

7.55

7.94

203 2 E 4.20
E

EQ
1 203
GYPSUM BOARD CEILING
MAIN CONSULTANT
CONCEPT ENGINEERING CONSULTANCY

EQ
7.94 MOBILE: 01060699909-01200002520

1
F F TEL: 02 24721515- 02 24721516

FAX: 02 24721565

300 Email: concept.eng.c@gmail.com

Email: info@conceptcec.com

G G

6.80
ELECTROMECHANICAL CONSULTANT
Address: 115, 7th District Front of
6th of October club, Giza
Mobile: (+20)010 3097 4044

H H
Tel: (+02) 02 369 756 79

Website: www.bhceg.com

I I

202
PLOT NO. LOCATION

EGYPT

Drawing Title
FIRST CEILING

1 2 3 4 5 6 7 8 9 10 Drawing no.

Drawn by: Checked by:

SHEET SIZE A0 Scale :

Date :

01-FIRST FLOOR REVISION

1 1 : 50

You might also like