Professional Documents
Culture Documents
KEY PLAN:
201
NOTES:
1 2 3 4 5 6 7 8 9 10 01- THIS DRAWING IS THE PROPERTY OF VERFORM DUBAI,UAE. IT IS NOT
ALLOWED TO REPRODUCE ITS CONTENT IN ANY FORM EXCEPT FOR THE
PURPOSE FOR WHICH IT IS INTENDED.
A A
06- ALL DIMENSIONS ARE TO BE VERIFIED ON SITE AND APPROVED BY THE
CONSULTANT/ ENGINEER PRIOR TO ANY COMMENTS OF WORK.
3.43
0.60
4.63
B GYPSUM BOARD CEILING B
1.20
1.50
1.50
ISSUES
C C
0.00
REVISION
1.71
PROJECT:
2.10
2.10
2.95
D D
1.71
CLIENT:
0.10
0.00
1.71
2.00
5.40
5.40
203 2 E E
1.71
EQ
1 203
2.49 11.01 5.75
MAIN CONSULTANT
EQ
CONCEPT ENGINEERING CONSULTANCY
1.71
1
F F MOBILE: 01060699909-01200002520
1.20
G G
8.15
Email: info@conceptcec.com
3.45
3.45
ELECTROMECHANICAL CONSULTANT
Address: 115, 7th District Front of
6th of October club, Giza
Website: www.bhceg.com
2.45
2.45
I I
202
PLOT NO. LOCATION
EGYPT
Drawing Title
1 2 3 4 5 6 7 8 9 10 Drawing no.
GROUND CEILING
Date :
REVISION