Professional Documents
Culture Documents
A
M-1A-0511
ø150 mm PD
ø65 mm PD
BOP ± -1543
B
M-1A-0511
150
ø100 mm PD
BOP ± -968
ø100 mm PD
BOP ± -968 FROM PRETREATMENT LAUNDRY
1200
1200
ø65 mm PD ø65 mm PD
ø150 mm PD A ISSUED FOR TENDER
ø150 mm PD BOP ± -1543
BOP ± -1543
3650
2000
TeamworX
Building C, Ground Floor
Jl. TB. Simatupang No. 41, Cilandak
Jakarta Selatan 12550 - INDONESIA
Phone : +62 21 780 0940
Fax : +62 21 789 2151
Website : www.teamworx.co.id
150 150
150 150
PROJECT TITLE :
SECTION A SECTION B
FOR TENDER ONLY
SCALE 1 : 20 M-1A-0511
M-1A-0511
SCALE 1 : 20
DRAWING NUMBER :
4217-CSD-M-1A-0511-RA
THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO at A1
COPYRIGHT
KEY PLAN
B
M-1A-0512
A
M-1A-0512
ø100 mm PD
BOP ± -415
TO SUMP PIT - 5
1000
ø65 mm VT
ø65 mm VT
1st Floor - = REVISION MARK = REVISION CLOUD
EL. -0.050
EL.+0
500
650
BU CV
150
1450
A ISSUED FOR TENDER
ø65 mm PD ø65 mm PD
ø125 mm PD
BOP ± -1423 ø50 mm PD
800
3750
CHECKED BY: APPROVED BY :
REV. DATE CLIENT ISSUANCE
Drafter Sr. Eng. Eng. MgrProj. Mgr
CLIENT :
3100
2000
2000
PT. Erlangga Edi Laboratories
CONSULTANT : PT TeamworX Indonesia
Beltway Office Park
TeamworX
Building C, Ground Floor
Jl. TB. Simatupang No. 41, Cilandak
Jakarta Selatan 12550 - INDONESIA
Phone : +62 21 780 0940
Fax : +62 21 789 2151
Website : www.teamworx.co.id
PROJECT TITLE :
150 150
Expansion Project at Salatiga
150 500 150 650 200 2850 150 150 2400 150 DRAWING TITLE :
SCALE
650 4000 2700
PLOT
DETAILS - MECHANICAL STANDARDS #11 1 : 20
SECTION A SECTION
SCALE 1 : 20 M-1A-0512 SCALE 1 : 20
B
M-1A-0512 FOR TENDER ONLY DRAWING NUMBER :
4217-CSD-M-1A-0512-RA
THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO at A1
COPYRIGHT
KEY PLAN
PROJECT TITLE :
PROJECT TITLE :
PROJECT TITLE :
SCHEDULES - MECHANICAL EQUIPMENT #3 (PHASE 1A) FOR TENDER ONLY DRAWING NUMBER :
4217-CSD-M-1A-0603-RB
SCALE : NTS
THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO at A1
COPYRIGHT
KEY PLAN
PROJECT TITLE :
SCHEDULES - MECHANICAL EQUIPMENT #4 (PHASE 1A) FOR TENDER ONLY DRAWING NUMBER :
4217-CSD-M-1A-0604-RB
SCALE : NTS
THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO at A1
COPYRIGHT
KEY PLAN
LEGEND :
RW
: RAW WATER PIPE
BY BY
VENDOR CONTRACTOR
PI
BV
FROM DEEP WELL Ø100-RW Ø100-RW
PUMP 01
CV
PI
BV
FROM DEEP WELL Ø40-RW Ø40-RW
PUMP 02
CV - = REVISION MARK = REVISION CLOUD
PI
B ISSUED FOR TENDER
BV
A FIRST
FIRST ISSUED
FROM DEEP WELL Ø40-RW Ø40-RW A ISSUED
PUMP 03
CV
PROJECT TITLE :
M-1A-0703, SHEET 2
M-1A-0703, SHEET 2
TO 3RD FLOOR
TO 3RD FLOOR
EL +15.600
3RD FLOOR NOTE & LEGEND
DISCLAIMER:
DRAWING SHOWS IS NOT A SHOPDRAWING:
INFORMATION DEPICTED IS SUBJECT TO CLIENT AND A/E APPROVAL IN
Ø80 - CDW Ø80 - CDW Ø80 - CDW Ø80 - CDW Ø80 - CDW Ø80 - CDW SUBMITTALS ISSUED BY THE CONTRACTOR IN THE PRE-CONSTRUCTION
PROCESS.
Ø20
Ø20
Ø32
Ø40 - CDW Ø40 - CDW APPROVED SUBMITTALS SHALL BE SUBJECT TO FIELD-VERIFICATION BY THE
Ø25
ENGINEER PRIOR TO INSTALLATION ON-SITE.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
Ø20
Ø100 - CDW
Ø40 - CDW
LV 9 FC 1 FC 1 FC 1 : POTABLE WATER PIPE
LAUNDRY EQUIP. 3
FIXTURES QUANTITY FIXTURES QUANTITY
EW 1 EWS 1
FC 3 WC 3 1-2M03 AHU - COATER
HDW GENERATOR 1
UR 2 FIXTURES QUANTITY
EL +11.400
LV 3 FC 1 2ND MEZ. FL.
Ø25
Ø20
3-2058 F. CHANGE ROOM (CNC) 1-2031 VISITOR CHANGE ROOM 5-2-02 AHU-AUDITORIUM R.
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
LV 9 LV 3 FC 1
Ø50 - CDW Ø50 - CDW Ø32 - CDW Ø25 - CDW Ø20 - CDW Ø20 - CDW Ø40 - CDW
Ø20
Ø20
Ø20
Ø100 - CDW
3-2060 LAUNDRY 1-2067 JC 1-2006 F. CHANGE ROOM 1-2005 M. CHANGE ROOM 4-2-01 POWDER
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
3-2061 PRAYER ROOM (FEMALE) 3-2062 TOILET FEMALE
LAUNDRY EQUIP. 3 FC 1 LV 2 LV 3 WC 1
FIXTURES QUANTITY FIXTURES QUANTITY
EWS 1 UR 1
FC 3 WC 5 EL +7.200
LV 1
LV 3 2ND FLOOR
Ø40 - CDW
- = REVISION MARK = REVISION CLOUD
Ø50 - CDW Ø50 - CDW Ø50 - CDW Ø40 - CDW Ø50 - CDW Ø50 - CDW Ø50 - CDW Ø32 - CDW
Ø32 - CDW
Ø32
Ø40
Ø25
Ø50
Ø20
Ø32
Ø15
Ø50 - CDW
Ø100 - CDW
1-1045 WASH ROOM 1-1050 TEMPORARY TRUCKERS 1-1060B FEMALE TOILET 1-1060A MALE TOILET 5-1-12 MALE TOILET 5-1-11 DISABLE TOILET 5-1-13 FEMALE TOILET 5-1-14 JANITOR
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
3-1066 BOILER ROOM B ISSUED FOR TENDER
SINK 1 WC 1 WC 1 WC 1 WC 3 WC 1 WC 5 FC 1
FIXTURES QUANTITY A FIRST ISSUED
UR 1 LV 2 LV 1 UR 2 LV 1 LV 3
EWS 1
LV 1 UR 2 LV 3
BLOW. TANK 1
Ø50 - CDW
Ø50 - CDW Ø50 - CDW Ø50 - CDW Ø20 - CDW Ø20 - CDW Ø20 - CDW Ø15 - CDW Ø20- CDW Ø32 - CDW
Ø15
Ø20
Ø32
Ø20
Ø20
Ø125 - CDW
PROJECT TITLE :
16-1-01 WASTE STORAGE 17-1-01 CANTEEN 17-1-09 FEMALE TOILET 17-1-07 MALE TOILET 17-1-12 JANITOR 17-1-04 FOOD PREPARATION 17-1-03 LOBBY & HAND BASIN 8-1-02 TOILET EPCM Services for New Facility
Ø32 - CDW
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
FC 4 WC WC 1 FC 1 FC 2 FC 8
Expansion Project at Salatiga
EWS/SS 1 1 WC 1
EL +0.0 LV 2 LV 2 EL +0.0 LV 1 EL +0.0 DRAWING TITLE :
GND FL UR 2 GND FL FC 1 GND FL SCALE
0. GENERAL PLOT
POTABLE WATER
M-1A-0730 Ø125 - CDW Ø50-CDW Ø20 - CDW
SCHEMATIC - POTABLE WATER PIPE
FROM WTP / PUMP AREA SYSTEM , SHEET 1
FOR TENDER ONLY DRAWING NUMBER :
4217-CSD-M-1A-0702-RB
SCHEMATICS - POTABLE WATER PIPE SYSTEM , SHEET 1 THIS DRAWING IS PROPERTY OF PT. TEAMWORX INDONESIA AND IS SUBJECT TO
SCALE : NTS at A1
COPYRIGHT
KEY PLAN
EL +29.000
ROOF
AAV
Ø50
Ø25
Ø15
Ø15
NOTE & LEGEND
1-4M14 FEMALE TOILET 1-4M13 MALE TOILET 1-4M12 PANTRY 3-4M01 AHU - 4 ROOM 1-4M04 TOILET
DISCLAIMER:
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY DRAWING SHOWS IS NOT A SHOPDRAWING:
WC 3 WC 2 SINK 1 FC 1 WC 1 INFORMATION DEPICTED IS SUBJECT TO CLIENT AND A/E APPROVAL IN
SUBMITTALS ISSUED BY THE CONTRACTOR IN THE PRE-CONSTRUCTION
LV 3 LV 2 LV 1 EL +28.200 PROCESS.
UR 2 4TH MEZZ APPROVED SUBMITTALS SHALL BE SUBJECT TO FIELD-VERIFICATION BY THE
ENGINEER PRIOR TO INSTALLATION ON-SITE.
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
ALL LEVEL ARE IN METERS UNLESS NOTED OTHERWISE.
Ø15
Ø15
Ø15
Ø15
Ø15
Ø15
CDW
: POTABLE WATER PIPE
1-4503 BATH ROOM 1-4302 SENSORY ROOM 1-4214 WASH & DECON 1-4305 GLASSWARE STORAGE 1-4306 PRIMARY PACKAGING 1-4309 GRANULATION 1 ROOM 1-4313 AYAKAN
Ø32 - CDW
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
WC 1 LV 1 SINK 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1
LV 1
SHOWER 1
Ø50 - CDW Ø50 - CDW
Ø25 - CDW Ø15 - CDW Ø15 - CDW Ø32 - CDW
Ø15
Ø15- CDW
Ø20
Ø15
Ø15
Ø15
Ø15
1-4007 TOILET MALE 1-4506 PANTRY
FIXTURES QUANTITY FIXTURES QUANTITY 1-4415 GLASSWARE & WASH R. 1-4414 FUME HOOD 1-4413 ORGANIC ROOM 1-4410 DISSOLUTION ROOM 1-4316 DRYING FBD 1-4315 GRANULATION 2 R. 1-4314 FINAL MIXING R.
1-4102 MALE CHANGE ROOM WC 2 SINK 1
Ø32 - CDW
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
FIXTURES QUANTITY UR 3 SINK 2 SINK 1 SINK 1 SINK 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1
FC 3 LV 3
Ø15- CDW Ø25 - CDW Ø15 - CDW Ø15 - CDW Ø32 - CDW Ø32 - CDW
Ø25
Ø15
Ø15
Ø15
Ø15
Ø25 - CDW
Ø50 - CDW
AAV
Ø25 - CDW
1-4101 FEMALE CHANGE ROOM 1-4008 TOILET FEMALE 1-4332 WASH AREA 1-4317 COATING 2 ROOM 1-4318 COATING 1 ROOM 1-4319 COMPACTOR ROOM 1-4320 PRINTING ROOM 1-4407 PREPARATION ROOM
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
Ø40 - CDW
FC 3 WC 3 SINK 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1 SINK 1
LV 3 EWS 1
Ø50 - CDW Ø50 - CDW Ø32 - CDW Ø32 - CDW Ø32 - CDW
Ø15
1-4003 POWDER
Ø15
Ø15
Ø15
Ø15
Ø32
Ø15
Ø40 - CDW
WC 1
1-4118 FLAMMABLE STORAGE 1-4204 JANITOR 1-4401 LOCKER 1-4326 FILLING SEMISOLID R. 1-4325 MIXING SEMISOLID R. 1-4324 COLLOID MILL R. 1-4323 FILLING LIQ. ROOM 1-4322 MIXING LIQ. ROOM LV 1
Ø50- CDW
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY UR 1
EWS/SS 1 FC 1 EWS/SS 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1 MANUAL POU 1
EL +24.000
4TH FLOOR
Ø40 - CDW
Ø100 - CDW
Ø15
Ø15
Ø15
Ø100 - CDW
3-3044 AHU PLANT ROOM 1-3037 JANITOR 1-3040 WASH AREA 1-3067 PANTRY 1-3068 JANITOR 1-3047 CLEAN UTILITY AREA 4-3-01 POWDER
Ø50 - CDW
FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY FIXTURES QUANTITY
FC 1 FC 1 EQUIPMENT 2 KITCHEN SINK 1 FC 1 SOFT WATER GEN. 2 WC 1
SINK 1 FC 1 UR 1 PT. Erlangga Edi Laboratories
CONSULTANT : PT TeamworX Indonesia
EWS 1 EWS 1 LV 1 Beltway Office Park
Building C, Ground Floor
EL +15.600
3RD FL
TeamworX Jl. TB. Simatupang No. 41, Cilandak
Jakarta Selatan 12550 - INDONESIA
Phone
Fax
: +62 21 780 0940
: +62 21 789 2151
Website : www.teamworx.co.id
PROJECT TITLE :
M-1A-0702, SHEET 1
FROM 2ND MEZZ
HOT POTABLE
MIG BV CONTROL
WATER TANK 3 m3
PANEL
GLV
TI TT TT PG PG
GV
SP
Ø80 - IS IS
M-1A-0713, SHEET 2
GV GV GV STR BV PRV GV INDUSTRIAL STEAM
BV
TI
TO DRAIN
CV BtV
M GLV GLV
STR
B 08-09-2023 FJ KIS FM EA BN IFT
BtV STR HWP 01 A 14-07-2023 BP KIS FM EA BN IFA
CAP. 17.3 M3/H Ø25 - SC SC CHECKED BY: APPROVED BY :
REV. DATE CLIENT ISSUANCE
M-1A-0713, SHEET 2 Drafter Sr. Eng. Eng. Mgr Proj. Mgr
PRESSURE 8 BAR
STEAM CONDENSATE CLIENT :
CV CONDENSATE CV
MECHANICAL PUMP
CAP. 2 M3/H
PRESSURE 8 BAR
PT. Erlangga Edi Laboratories
CONSULTANT : PT TeamworX Indonesia
Beltway Office Park
Building C, Ground Floor
PROJECT TITLE :
Ø80 - HDW
Ø80 - HDW
Ø80 - HDW
WET GRANULATION ROOM NAME WASH AREA ROOM NAME TECHNICAL AREA
ROOM NAME
(300kg/run) ROOM No. 1-3041A ROOM No. 1-3048
Ø80 - HDW
ROOM No. 1-3019 Mobile Vessel CIP Station EQUIP NAME Cleaning Unit Skid
EQUIP NAME
EQUIP NAME High Shear Mixer Granulator Pump Skid EQUIP TAG CIP-PB1-GRN-3L-001
EQUIP TAG HSMG-PB1-GRN-3L-002 EQUIP TAG PU-PB1-WSH-3L-003 FLOWRATE 6.0 m3/h
FLOWRATE 0.5 m3/h FLOWRATE 9.0 m3/h PRESSURE 2.0 barg
PRESSURE 2.0 barg PRESSURE 4.0 barg TEMPERATURE 60 °C EL +15.600
TEMPERATURE 60 °C TEMPERATURE 60 °C 3RD FLOOR
HDW
M-1A-0704, SHEET 1
Ø80 - HDW
Ø80 - HDW
B ISSUED FOR TENDER
A FIRST ISSUED
SUGAR COATING ROOM NAME COATING ROOM 1 ROOM NAME COATING ROOM 2 ROOM NAME COATING ROOM 3
ROOM NAME
SOLUTION PREPARATION ROOM No. 1-2052 ROOM No. 1-2050 ROOM No. 1-2048
ROOM No. 1-2075 B 08-09-2023 FJ KIS FM EA BN IFT
EQUIP NAME Tablet Coating Machine 1 EQUIP NAME Tablet Coating Machine 2 EQUIP NAME Tablet Coating Machine 3
Sugar Coating Solution A 14-07-2023 BP KIS FM EA BN IFA
EQUIP NAME EQUIP TAG CO-PB1-COT-2L-001 EQUIP TAG CO-PB1-COT-2L-002 EQUIP TAG CO-PB1-COT-2L-003
Preparation Vessel 1 CHECKED BY: APPROVED BY :
EQUIP TAG TA-PB1-COT-2L-002 FLOWRATE 0.5 m3/h FLOWRATE 0.5 m3/h FLOWRATE 0.5 m3/h REV. DATE
Drafter Sr. Eng. Eng. Mgr Proj. Mgr
CLIENT ISSUANCE
FLOWRATE 5.4 m3/h PRESSURE 2.0 barg PRESSURE 2.0 barg PRESSURE 2.0 barg CLIENT :
PRESSURE 4.0 barg TEMPERATURE 60 °C TEMPERATURE 60 °C TEMPERATURE 60 °C
TEMPERATURE 60 °C
EL +7.200
2ND FLOOR
PT. Erlangga Edi Laboratories
CONSULTANT : PT TeamworX Indonesia
Beltway Office Park
Building C, Ground Floor
PROJECT TITLE :