You are on page 1of 1

APARTMENT DETAILS

KEY PLAN:-

200
1900
920
CD
CD CD

Water Drop 150 MM NOTES:-


1. ALL THE DIMENSIONS ARE IN MILIMETERS
2. ALL DIMENSIONS ARE TO BE CHECKED AT THE SITE BEFORE
EXECUTION
3. ANY DISCREPANCY FOUND, MUST BE BROUGHT TO THE NOTICE
OF ARCHITECT FOR FINAL DECISION.
FLOOR TILE

Legends

450
2950
B B' B B' B B'
A A' A A' A A' C4 375 x 350
200 mm

WALL
115 mm

SP CEILING FAN

230
V
EXHAUST FAN
150
C' D'
500 400 C4 C' D' C4 C' D' C4
SP TILE STARTING POINT

TOILET LAYOUT PLAN TOILET FLOOR(TILES) PLAN CEILING PLAN RCC


Floor Tile
(300 x 300)

Italian Marble Finish

Fixtures
Fix no. Description Model
MOISTURE RESISTANT
GYPSUM CEILING
F7 Basin Tap As/BOQ

ITALIAN MARBLE
FINISH

Sr.No Date Description of Revision Remarks


MIRROR
3000
2100

JAQUAR BASIN F7

JAQUAR CLOSET
850

STR. CONSULT. ELEC. CONSULT.


Anand Kasaudhan Sahil Verma
30

PLUM. CONSULT. ARCH. CONSULT.


Satyam Kushwaha Mohit Kumar Gupta
SECTION AA' SECTION BB' SECTION CC' SECTION DD'
ARCHITECT SIGNATURE:-

RKD CO NO. CA/__/__

PROPOSED ADDITION IN PLAN:-

WORKING DRAWING:-
WORKING TOILET (TYPE-1)

WORKING TOILET (TYPE-1) N


ARCHITECT:-
AR. ANURAG MAHAJAN, 4th Yr.

DRAWN BY:- ANURAG MAHAJAN


CHECKED. BY:- DR. HARSHIT SOSAN LAKRA
DRAFTED ON:- 30/11/2021
CHECKED ON:-
SHEET NO. :- 10
CLIENT :- IIT ROORKEE
SCALE :- 1:50 @ A2

You might also like