You are on page 1of 1

- -

H J K H J K ORIENTATION

02 02

KEY PLAN

NOTES

THIS DRAWING MUST NOT BE SCALED.

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT
ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY
AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE
ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING,
LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES
AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.

© COPYRIGHT CHAPMAN TAYLOR 2020

03 03 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS UNLESS
OTHERWISE INDICATED.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT
ARCHITECTURAL,CIVIL,STRUCTURAL MECHANICAL AND ELECTRICAL ENGINEERING
SERVICES DRAWINGS.
3. ALL DIMENSION ARE TO BE CHECKED AND VERIFIED BY THE CONTRACTOR PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION ON SITE.THIS DRAWING MUST NOT BE SCALED AND
ONLY WRITTEN OR CALCULATED DIMENSION ARE TO BE USED.
4. CONTRACTOR SHOULD SUBMIT APPROVED MANUFACTURER'S SHOP DRAWINGS FOR
CLIENT'S APPROVAL, PRIOR TO EXECUTION ON SITE.

04 04

FFL +0.000 CONCESSION


B011
90.15 m²

05 05

CONCESSION
STORE
B010
125.47 m²

06 06

C01 16/Jul/2021 RN FOR CONSTRUCTION DW


01 11/Jun/2021 RN FOR INFORMATION DW
00 04/Jun/2021 RN FOR INFORMATION DW

REV DATE BY DESCRIPTION CHK'D


CLIENT

07 07

PROJECT & COST MANAGEMENT

ARCHITECT

STRUCTURAL CONSULTANT AND MEP SERVICES

1900 1900

2 ACOUSTIC

FFL +0.000 21101

08 CINEMA 1
08 CINEMA 1
XPERIENCE
XPERIENCE C1
PLF 490 SEATS
C1
PLF 490 SEATS WHEELCHAIR 3 SEATS
WHEELCHAIR 3 SEATS TOTAL SEATS 493
TOTAL SEATS 493
PROJECT

FFL +0.000

MUVI CINEMA AT RIYADH BOULEVARD


RIYADH , KSA

FFL +0.480
LOCAL ARCHITECT

FFL +0.480

DRAWING TITLE

CINEMA 1 DETAIL SHEET 2

JOB NO PACKAGE NUMBER SCALE


FFL +0.000
FFL +0.000 C361RBR / C361FEC 1 : 50 @ A0

DRAWING STATUS DRAWN DATE CHECKED BY


FOR CONSTRUCTION 22/Apr/2021 DW
DRAWN BY ISSUE DATE

CINEMA 1 ESCAPE PLAN CINEMA 1 SEATING PLAN 1 REVISION


RN 16/Jul/2021

1 1 : 50 2 1 : 50
21101 C01
PROJECT NUMBER ORIGINATOR ZONE LEVEL TYPE ROLE NUMBER

C361RBR-CTA-C1-00-DR-A- 21201

You might also like