You are on page 1of 1

Rev. no.

Description of Revision Date Name

A CONSTRUCTION ISSUE 21.02.22 JM

FIRE
UP
ESCAPE
STAIRS

SERVICES
RAISER
WASH POT
SNACK BAR
TRAY RACK

NOTES
HAND PAPER
DYER TOWEL

WASH 1. DO NOT SCALE FROM THIS DRAWING. ALL


SINK
DIMENSIONS TO BE CROSSCHECKED ON SITE.
ANY DISCREPANCIES TO BE REPORTED TO THE
LIFT LIFT DESIGNER PRIOR TO CONSTRUCTION.
2. DETAILING DISCREPANCIES OR
IMPLEMENTATION IMPRACTICALITIES MUST BE
REPORTED AND RESOLVED WITH THE INTERIOR
AC DESIGNER BEFORE CONSTRUCTION
COMMENCES.
ROOM 3. CONTRACTOR TO ALLOW FOR SEALING OFF
OR MAKING GOOD OF JUNCTIONS BETWEEN
BEAMS, FLOOR SLAB, OR ANY OTHER INCIDENTAL
OPENINGS AS NECESSARY WITH FLUSH, FIXED
LIFT LOBBY
PAINTED MDF PANELS.
DN
4. APPROPRIATE MEASURES TO BE TAKEN AT ALL
MATERIAL WALLING TRANSITIONS, THAT IS,
VOID CONCRETE/BLOCKWORK,
BLOCKWORK/DRYWALLING, ETC. TO PREVENT
CRACKING AND ENSURE SMOOTH BEADING-FREE
FINISHING.

ELECTRICAL RAISER
LIFT LIFT
AC
ROOM

N
LADIES

CLIENT

GENTS

PROJECT
PROPOSED NEW OFFICE BLOCK
POS
TRAY RACK
SITE- LENANA ROAD, KILIMANI
LR No.

SERVERY
TRAY RACK POT
WASH
INTERIOR DESIGNER
FIRE

SERVICES
RAISER
WASTE DRAIN
RETURN RACK ESCAPE
STAIRS P.O. BOX 1377, 00606,
UP
Forest Court, Wangari Maathai Rd, NAIROBI

QUANITY SURVEYOR

MEP ENGINEER

LEVEL Drawing Description

SKY GARDEN SPACE PLAN

03
Job Number Drawing Number
2021/17 2021/17.PS.03.100
Drawn MJ Modified
Scale 1:150
Date 06/09/2022

Revision Number Issued For


BA
FOR CONSTRUCTION

GSPublisherVersion 0.24.100.99

You might also like