You are on page 1of 1

Rev. no.

Description of Revision Date Name

A For construction 10.02.22 JM


B Gym Update 09.03.22 JM

Matt Matt Matt Matt Matt

OUTDOOR EXIT
WORKOUT6,311
AREA 2,189
NOTES

1. DO NOT SCALE FROM THIS DRAWING. ALL


DIMENSIONS TO BE CROSSCHECKED ON SITE.
ANY DISCREPANCIES TO BE REPORTED TO THE

ENTRANCE
DESIGNER PRIOR TO CONSTRUCTION.

Cross trainer 6,477 2. DETAILING DISCREPANCIES OR

EXECUTIVE
4,000 to be confirmed once casting is done IMPLEMENTATION IMPRACTICALITIES MUST BE
REPORTED AND RESOLVED WITH THE INTERIOR

GYM DESIGNER BEFORE CONSTRUCTION


COMMENCES.
Drinks counter 3. CONTRACTOR TO ALLOW FOR SEALING OFF
towels OR MAKING GOOD OF JUNCTIONS BETWEEN
below BEAMS, FLOOR SLAB, OR ANY OTHER INCIDENTAL
OPENINGS AS NECESSARY WITH FLUSH, FIXED
PAINTED MDF PANELS.

Multi Gym WATER TANKS 4. APPROPRIATE MEASURES TO BE TAKEN AT ALL


MATERIAL WALLING TRANSITIONS, THAT IS,
CONCRETE/BLOCKWORK,
Rowing Machine

8,313
7,400
BLOCKWORK/DRYWALLING, ETC. TO PREVENT
CRACKING AND ENSURE SMOOTH BEADING-FREE
FINISHING.

Bench
Spinning Bike 01

BMI
Medical

Treadmill
BMI machine

CLIENT

ENTRANCE
6,311 1,789
ROOF
TERRACE
WC WC WC Shower Shower

PROJECT
LOUNGE LADIES
Changing
PROPOSED NEW OFFICE BLOCK
Room
SITE- LENANA ROAD, KILIMANI
LR No.

INTERIOR DESIGNER
BAR
P.O. BOX 1377, 00606,
Changing
GENTS Room
Forest Court, Wangari Maathai Rd, NAIROBI

S-01
QUANITY SURVEYOR
Shower Shower
WC

MEP ENGINEER

Drawing Description

SPACE PLAN
Job Number Drawing Number
2021/17 2021/17.PS.19.100
Drawn MJ Modified
Scale 1:100
Date 06/09/2022

Revision Number Issued For

L
FOR CONSTRUCTION

GSPublisherVersion 0.24.100.99

You might also like