LTD AND SHALL NOT BE PASSED ANY PERSON NOT AUTHORIZED BY SSC
TO RECIEVE IT. IT SHALL NOT BE COPIED OR MODIFIED IN FULL OR PART
A B WITHOUT SSC'S PRIOR PERMISSION. THE DETAILS FURNISHED IN THIS
DRG. ARE FOR THIS PROJECT ONLY.
3.27
0.15
T8@0.15C/C T8@0.15C/C MANHOLE TECHNICAL NOTES
A B W.T.T.L 0.60 X 0.60 1. ALL DIMENSIONS ARE IN CENTIMETER & MILLIMETER UNLESS
OTHER WISE SPECIFIED
11.20 2. ONLY WRITTEN DIMENSION TO BE FOLLOWED.
3. ANY DISCREPANCIES NOTICED IN THE DRG. SHALL BE BROUGHT TO
OUR NOTICE IMMEDIATELY.
1
0.30
4. EXECUTIVES SHALL CHECK ALL DRAWING BEFORE TAKING
0.23 0.23 EXECUTION IN HAND.
17
5. ENGINEER IN CHARGE TO ENSURE THAT CONSTRUCTION LOADS DO
NOT EXCEED LIVE LOAD,APPROPRIATE ARRANGEMENT TO BE MADE TO
3.16 FC DISTRIBUTE CONSTRUCTION LOAD EVENLY.
3.81
3.36
1.50
16 T10@0.15C/C T10@0.15C/C 8. "Ø" DENOTES HIGH STRENGTH DEFORMED BARS OF GRADE FE500
CONFORMING TO IS 1786 : 1985
FC 9. CLEAR COVER TO REINFORCEMENT.
1 A. COLUMNS = 40 MM
B. FOUNDATION = 60 MM
WATER TANK BOTTOM LAYOUT T10@0.15C/C T10@0.15C/C C. TIE BEAM = 40 MM
0.25
D. FLOOR BEAM = 25 MM
E. FLOOR SLAB = 20 MM
10. THE BUILDING FOUNDATION HAS BEEN DESIGNED FOR
W.T.B.L G+1.THE REQUIRED CAPACITY OF SOIL IS 120KN/M².
THE CONTRACTOR IS RESPONSIBLE FOR ATTAINING THIS
CAPACITY 120KN/M² BY CONSULTING WITH SOIL EXPERTS.
11. LOOSE SOIL IF ANY SHALL BE REMOVED BEFORE LAYING FOUNDATION.
A 12. THE DEPTH OF BEAMS SHALL BE INCLUDING THE SLAB THICKNESS.
B1 B1
3-T16(C)
0.90
3.27 MANHOLE
1
0.60 X 0.60 COLUMN COLUMN
17
B1
T8@0.150C/C
T.L
THK-0.15
3.81
B1
B1
3-T16(C) CLIENT
16 B1 - 0.23 X 0.45 REFER HEAD
B1 REFER HEAD ROOM SLAB REFER HEAD
C/S - DEATAILS
1 ROOM BEAM ROOM BEAM ----------
PROJECT
SECTION - 1 - 1
PROPOSED COMMERCIAL BUILDING
AT MADAVARAM
0.30 LEGENDS:
ARCHITECT/CONTRACTOR
W.T.T.L - WATER TANK TOP LEVEL
W.T.B.L - WATER TANK BOTTOM LEVEL
0.23
6-T16
STRUCTURAL CONSULTANT
FC1