1 1' 2 2' 3 3' 4 4' 5 5' 6 6' 7 SHOP DRAWING

COPYRIGHT
1. THIS DRAWING AND DESIGN IS THE COPYRIGHT OF THE
DESIGNER, NO PORTION MAY BE REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF THE DESIGNER
2. ALL DIMENSIONS TO BE VERIFIED ON SITE BY THE
CONTRACTORS, ANY DISCREPANCIES TO BE REPORTED TO
DESIGNER IMMEDIATELY
3. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE
DESIGNER SPECIFICATION AND CONDITION OF CONTRACT
4. DRAWING NOT SHOWING THE LATEST REVISION ARE TO BE
CANCELED
5. ALL INFORMATION ON THE DRAWING RELATING PT. MULTI CIPTA

1 BANGUN SERASI, WILL NOT BE RESPONSIBLE FOR ANY


DISCREPANCIES OR ERRORS DUE TO INCORRECT INFORMATION
CONTAINED THERE IN
REVISION
2 REVISION NOTE DATE PARAF

3 OWNER

STRUCTURE CONSULTANT

M & E CONSULTANT

5
PRINCIPAL ARCHITECT

6 K2 K2 K2 K2 K2 K2 YULIUS HARIDA PUTRA, ST.,MT.

ARCHITECT IN CHARGE

PROJECT TITLE

MULTI BIZPARK
SUMUR BATU
Sumur Batu, Bantargebang, Kota Bekasi, Jawa Barat
+0.00 M EL.FFL OFFICE +0.00 M EL.FFL OFFICE

550
550

800 -0.55 M EL.BOTTOM SLOOF DRAWING TITLE SCALE


-0.55 M EL.BOTTOM SLOOF

DENAH KOMPOSIT
PONDASI

650
650

1:125 & 1:50


1000

KOLOM ,SLOOF,
800

-1.20 M EL.TOP PILE CAP -1.20 M EL.TOP PILE CAP


FOOTPLAT

300
COL STRAUSS PILE
RUKO BLOK A1
300

COL STRAUSS PILE

-1.50 M EL.BOTTOM PILE CAP -1.50 M EL.BOTTOM PILE CAP


PROJECT NUMBER DRAWING NUMBER
1000 -1.65 M -1.65 M EL.GALIAN

150
EL.GALIAN
150

DENAH FOOTPLAT 1 DENAH FOOTPLAT 2 DRAWN BY DATE

SKALA 1 : 50 P1 SKALA 1 : 50 P2
S.A 2022
DETAIL FOOTPLAT 1 DETAIL FOOTPLAT 2
SKALA 1 : 50 P1 SKALA 1 : 50 P2 CHECKED BY APPROVAL
A B C D E F G H I J K L M SHOP DRAWING
COPYRIGHT
1. THIS DRAWING AND DESIGN IS THE COPYRIGHT OF THE
DESIGNER, NO PORTION MAY BE REPRODUCED WITHOUT THE
WRITTEN PERMISSION OF THE DESIGNER
2. ALL DIMENSIONS TO BE VERIFIED ON SITE BY THE
CONTRACTORS, ANY DISCREPANCIES TO BE REPORTED TO
DESIGNER IMMEDIATELY
3. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE
DESIGNER SPECIFICATION AND CONDITION OF CONTRACT
4. DRAWING NOT SHOWING THE LATEST REVISION ARE TO BE
CANCELED
1 5. ALL INFORMATION ON THE DRAWING RELATING PT. MULTI CIPTA
BANGUN SERASI, WILL NOT BE RESPONSIBLE FOR ANY
DISCREPANCIES OR ERRORS DUE TO INCORRECT INFORMATION
CONTAINED THERE IN

2 REVISION

REVISION NOTE DATE PARAF

3 OWNER

STRUCTURE CONSULTANT

M & E CONSULTANT
5
PRINCIPAL ARCHITECT
6
K2 K2 K2 B K2 K2 K2 YULIUS HARIDA PUTRA, ST.,MT.

ARCHITECT IN CHARGE

PROJECT TITLE

MULTI BIZPARK
SUMUR BATU
Sumur Batu, Bantargebang, Kota Bekasi, Jawa Barat
+0.00 M EL.FFL OFFICE
550

EL.BOTTOM DRAWING TITLE SCALE


-0.55 M SLOOF

+0.00 M EL.FFL OFFICE DENAH KOMPOSIT


PONDASI 1:125 & 1:50
800

BATU KALI & ROLLAG


550
750

EL.BOTTOM RUKO BLOK A1


-0.55 M SLOOF
-1.35 M EL. PASANGAN BATU BELAH
200

200
EL.BOTTOM
200

-0.75 M PAS.BATU KALI PROJECT NUMBER DRAWING NUMBER


-1.55 M EL. AANSTAMPING
-1.65 M EL. PASIR URUG
200
100

800
1000
1200
DRAWN BY DATE

S.A 2022
DETAIL PONDASI BATU KALI DETAIL PONDASI ROLLAG
SKALA 1 : 50 A SKALA 1 : 50 B CHECKED BY APPROVAL