You are on page 1of 1

NOTES AND SPECIFICATIONS

1. SPECIAL CASES OR PROPOSED CHANGES TO THESE


SPECIFICATIONS MUST BE DISCUSSED WITH AND
APPROVED BY BY THE DEPUTY MANAGER: ROADS
PLANNING.

2. CONSTRUCTION SPECIFICATIONS MUST BE ACCORDING


TO THE RELEVANT STANDARD DETAIL DRAWINGS AND
STANDARD SPECIFICATIONS FOR MUNICIPAL CIVIL
ENGINEERING WORKS, 3rd EDITION, 2005.

SECTION A-A

AMENDMENTS
NR. DATE APPROVED DESCRIPTION PAR.

DESIGNED DRAWN
J. DU PREEZ
S. AUDIE
SIGNATURE:......................................................................... DATE:....................................

DESIGN CHECKED BY INFRASTRUCTURE TECHNICAL INFORMATION

A A L.G. JOHANNES Pr. Eng. MANAGEMENT


D.J. CHALMERS

SIGNATURE:......................................................................... DATE:.................................... SIGNATURE:......................................................................... DATE:....................................

D B PROJECT STATUS

C C CONCEPT
DRAWING
TENDER
DRAWING
APPROVED FOR
CONSTRUCTION
DRAWING
AS BUILT
DRAWING

PROJECT ENGINEER ( CONSULTANT)

B D ................................................................................ ................................................................................ ..............................................................


INITIALS AND SURNAME SIGNATURE AND Pr. No. DATE
INSPECTOR OF WORKS (CITY OF TSHWANE):

................................................................................ ................................................................................ ..............................................................


INITIALS AND SURNAME SIGNATURE AND Pr. No. DATE

NOTE: CONSULTANT DETAIL

ABCD = SERVITUDE FOR


MUNICIPAL PURPOSES

CITY OF TSHWANE
ROADS AND TRANSPORT DEPARTMENT
Mr P. I. Letlonkane Ms. L. V. Kegakilwe-Piki
STRATEGIC EXECUTIVE EXECUTIVE DIRECTOR
DIRECTOR
P.O. BOX 1409 P.O. BOX 1409
PRETORIA PRETORIA
0001 0001
DRAWING APPROVED BY EXECUTIVE DIRECTOR
Ms. L. V. Kegakilwe-Piki

SIGNATURE:............................................................................. DATE:......................................................

PLAN OF TEMPORARY TURNING CIRCLE PERMANENT TURNING CIRCLE PLAN OF PERMANENT TURNING HEAD
LOCATION OF PROJECT:

FIGURE 2 FIGURE 3
TYPICAL STANDARD
FIGURE 1
SCALE 1: 50
SCALE 1: 50 SCALE 1: 50 ROADS AND STORMWATER
For Internal Approval
RECIEVED
SIGN WHEN APPLICABLE
DETAILS
DIRECTOR: INFRASTRUCTURE PROVISION DESCRIPTION OF PROJECT

SIGNATURE DATE

DIRECTOR: INFRASTRUCTURE CONSTRUCTION (PROJECT) MANAGEMENT

DATE
TURNING FACILITIES:
SIGNATURE

DIRECTOR: INFRASTRUCTUREASSET MANAGEMENT


DESIGN FLOW CHART
SIGNATURE
DIRECTOR: TRANSPORT INFRASTRUCTURE PLANNING
DATE
AND DETAILS
SIGNATURE DATE
CONTRACT No. : PROJECT No. :
DIRECTOR: INTELLIGENT TRANSPORT SYSTEN AND TRAFFIC ENGINEERING
ENGINEERING

SIGNATURE DATE

DIRECTOR: INFRASTRUCTURE MAINTENANCE MANAGEMENT (IMM) DATE : SCALE : ORIGINAL PAPER SIZE:

SIGNATURE DATE MAY 2013 AS SHOWN A1


DRAWING NO. SHEET NO:
0
PLN002 1 OF 1 REVISION

You might also like