You are on page 1of 1

1 2 3 4 5 6

KEYPLAN:

STP

SEWAGE TREATMENT PLANT


E
NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN


METRES UNLESS OTHERWISE INDICATED.
2. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH
ALL OTHER TRADES FOR COORDINATION PURPOSES AND IN
CONJUNCTION WITH THE SPECIFICATIONS.
3. THIS PLANT LAYOUT IS DEVELOPED FOR SCHEMATIC DESIGN
STAGE. NOT FOR CONSTRUCTION.

30 4. BUILDING OREINTATION, PROCESS UNITS, ACCESS TO ALL


STRUCTURES AND VEHICLE TURNING RADIUS TO BE
OPTIMIZED DURING DETAIL DESIGN.

29
LEGEND:

STP Boundary wall

E 692611.272 E 692661.646 28 Potable Water


Irrigation
N 2750762.512 N 2750805.874 Stormwater
Wastewater
Medium Voltage
D
Low Voltage
E 692669.508
Telecom
N 2750796.731 StreetLightning
E 692703.996 Fence
N 2750826.375

00 SCHEMATIC DESIGN 06/24/2022 KK MG


no. description date chkd appd
issues\revisions

SCHEMATIC DESIGN
B
project

ROSHN REAL ESTATE


RIYADH EAST
Lead Consultant
90A George St, EH2 3DF
Edinburgh, UNITED KINGDOM
T: +44 131 225 6269

27 web: https://www.kettle.co
email: mail@kettle.co

Engineering Consultant
Rolex Tower, Level 4
274-336, Sheikh Zayed Road
P.O. Box 49100, Dubai, U.A.E.
T: +971 4325 4931, F: +971 4386 4933
web: http://www.keoic.com
email: info@keoic.com
Client
ROSHN Real Estate Developement
4600, Ath Thumamah Road,
Al Munsiyah District, Saudi-KAS
T: +966 9200 222 88
web: https://www.roshn.sa/en
email: info@roshn.sa
Dwg. Title
SEWAGE TREATMENT PLANT
A SITE LAYOUT
This Parameter is auto-updated while printing

Scale: Proj. Start Date:


1 : 250
FEB 2022
Drawn: Arch/Engr Hd. A/E
HH KK MG
Tuesday, November 29,

Proj. Dir. QA/QC PM


FDM TSD FDM
2022 10:53:44 AM

E 692672.179 E 692756.365 Proj. No:


21-4020-0000
Rev:
00

N 2750691.638 N 2750763.978 Dwg. No:

00301-KEO-ZZ-A0-DSD-ST-10000
Original Sheet Size: A1 Copyright © 2022 by KEO International Consultants, WLL

You might also like