Professional Documents
Culture Documents
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
#NEXION
#AMBIENT #BEIGE MEDIO #BLUE COLORED TILES #GREEN COLORED TILES #NEXION #WOOD #ESSENZE
#600MM X 600MM SELECTED BY THE CLIENTS SELECTED BY THE CLIENTS #ECAULIPTO #200MM X 1200MM
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
Ashtekar House
2 7 Mulberry Park
#BEIGE COLORED TILES
DRAWING TITLE:-
SELECTED BY THE CLIENTS
OUTHOUSE-
LAYOUTS
01/2021/SR+A 1:50
FLOORING LAYOUT
AR-GF-SR-FD-02-02 00
1. DRAWINGS ARE TO BE READ AND NOT MEASURED.
2. ANY AMBIGUITY IN DRAWING IS TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECTS BEFORE COMMENCEMENT OF
WORK.
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
THE ARCHITECT ON COMPLETION OF THIS WORK.
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
Ashtekar House
2 7 Mulberry Park
DRAWING TITLE:-
OUTHOUSE-
LAYOUTS
01/2021/SR+A 1:50
E&M LAYOUT
AR-GF-SR-FD-02-02 00
TEXTURE PAINT
SCREW TO BE FIXED
14
WITH ALLIGATOR
ANCHOR
14
PLASTER
60
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
BRICK WALL 4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
#BOTTOMLINE 5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
#SIP116 TO BE FIXED THE ARCHITECT ON COMPLETION OF THIS WORK.
ON PLASTER WALL
WITH ADHESIVE
FLOORING
F.F.L
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
50
R1
ELEVATION AT A ELEVATION AT B
150
150 150
50 100
FALSE CEILING TO BE FINISHED IN PAINT BY
150
#ASIAN PAINTS #CREAM PIE #L152
150
LED LIGHT STRIP TO BE PROVIDED
KEYPLAN
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
ELEVATION AT C ELEVATION AT D
Ashtekar House
2 7 Mulberry Park
DRAWING TITLE:-
OUTHOUSE-
A
ENTRANCE FOYER
D B
C N JOB NO. Scale
WALLING LAYOUT FLOORING LAYOUT RCP LAYOUT E&M LAYOUT LEGENDS- ENTRANCE FOYER
AR-GF-SR-FD-02-02 00
1. DRAWINGS ARE TO BE READ AND NOT MEASURED.
2. ANY AMBIGUITY IN DRAWING IS TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECTS BEFORE COMMENCEMENT OF
WORK.
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
THE ARCHITECT ON COMPLETION OF THIS WORK.
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
A
D B
00 20-03-2024 Issued For Construction Akshay Shawn
C
REV DATE DESCRIPTION DRAWN CHKD. APPD.
SR+A
CLIENT:-
NOTE:
Ashtekars
WASTAGE @15% + TO BE CONSIDERED FOR THE FLOORING AND SKIRTING
PROJECT TITLE:-
WALLING LAYOUT FLOORING LAYOUT LEGENDS- GYM
Ashtekar House
2 7 Mulberry Park
DRAWING TITLE:-
OUTHOUSE-
GYM.01
01/2021/SR+A 1:50
AR-GF-SR-FD-02-02 00
7 10 12
10 4 12
75
23
300
12
1. DRAWINGS ARE TO BE READ AND NOT MEASURED.
2. ANY AMBIGUITY IN DRAWING IS TO BE BROUGHT TO THE
150
26
NOTICE OF THE ARCHITECTS BEFORE COMMENCEMENT OF
150
WORK.
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
12
AT SITE.
5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
F.F.L THE ARCHITECT ON COMPLETION OF THIS WORK.
23
12 4 10
100
STRUCTURAL CONSULTANTS
TYPICAL HEIGHTS FOR SB1.2 TO SB1.12 DETAIL AT X SCALE (1:2) ENLARGED DETAIL AT Y SCALE (1:5)
M.E.P. CONSULTANTS
KEYPLAN
ELEVATION AT A ELEVATION AT B
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
Ashtekar House
X 2 7 Mulberry Park
DRAWING TITLE:-
OUTHOUSE-
GYM.02
01/2021/SR+A 1:50
ELEVATION AT C ELEVATION AT D
AR-GF-SR-FD-02-02 00
TEXTURE PAINT
SCREW TO BE FIXED
14
WITH ALLIGATOR
ANCHOR
14
PLASTER
60
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
BRICK WALL 4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
#BOTTOMLINE 5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
#SIP116 TO BE FIXED THE ARCHITECT ON COMPLETION OF THIS WORK.
ON PLASTER WALL
WITH ADHESIVE
FLOORING
F.F.L
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
ELEVATION AT A ELEVATION AT B
50
R1
150
150 150
50 100
FALSE CEILING TO BE FINISHED IN PAINT BY
150
#ASIAN PAINTS #CREAM PIE #L152
150
LED LIGHT STRIP TO BE PROVIDED
KEYPLAN
ELEVATION AT C ELEVATION AT D ELECTRICAL SCHEDULE REV DATE DESCRIPTION DRAWN CHKD. APPD.
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
Ashtekar House
A
2 7 Mulberry Park
D B
C DRAWING TITLE:-
OUTHOUSE-
MASSAGE ROOM
WALLING LAYOUT FLOORING LAYOUT RCP LAYOUT E&M LAYOUT LEGENDS- MASSAGE ROOM
AR-GF-SR-FD-02-02 00
1. DRAWINGS ARE TO BE READ AND NOT MEASURED.
2. ANY AMBIGUITY IN DRAWING IS TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECTS BEFORE COMMENCEMENT OF
WORK.
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
THE ARCHITECT ON COMPLETION OF THIS WORK.
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
A
D B
00 20-03-2024 Issued For Construction Akshay Shawn
C
REV DATE DESCRIPTION DRAWN CHKD. APPD.
SR+A
CLIENT:-
NOTE:
Ashtekars
WASTAGE @15% + TO BE CONSIDERED FOR THE FLOORING AND SKIRTING
PROJECT TITLE:-
WALLING LAYOUT FLOORING LAYOUT LEGENDS- JACUZZI
Ashtekar House
2 7 Mulberry Park
DRAWING TITLE:-
OUTHOUSE-
JACUZZI.01
01/2021/SR+A 1:50
AR-GF-SR-FD-02-02 00
1. DRAWINGS ARE TO BE READ AND NOT MEASURED.
2. ANY AMBIGUITY IN DRAWING IS TO BE BROUGHT TO THE
NOTICE OF THE ARCHITECTS BEFORE COMMENCEMENT OF
WORK.
3. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN METERS.
4. ALL DIMENSIONS SHOULD BE CHECKED BY CONTRACTOR
AT SITE.
5. COPYRIGHT & PROPERTY OF THIS DRAWING BELONGS TO
THE ARCHITECT. THIS DRAWING SHALL BE RETURNED TO
THE ARCHITECT ON COMPLETION OF THIS WORK.
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
ELEVATION AT A ELEVATION AT B
KEYPLAN
SR+A
CLIENT:-
Ashtekars
PROJECT TITLE:-
Ashtekar House
A 2 7 Mulberry Park
D B
DRAWING TITLE:-
C
OUTHOUSE-
JACUZZI.02
01/2021/SR+A 1:50
STRUCTURAL CONSULTANTS
M.E.P. CONSULTANTS
ELEVATION AT A ELEVATION AT B
KEYPLAN
NOTE:
WASTAGE @15% + TO BE CONSIDERED FOR THE FLOORING AND SKIRTING
Ashtekars
PROJECT TITLE:-
Ashtekar House
A
2 7 Mulberry Park
D B
C DRAWING TITLE:-
OUTHOUSE-
POWDER TOILET
WALLING LAYOUT FURNITURE FIXTURE FLOORING LAYOUT RCP LAYOUT E&M LAYOUT 01/2021/SR+A 1:50
AR-GF-SR-FD-02-02 00