task_code status_code wbs_id task_name start_date end_date

Activity ID Activity StatuWBS Code Activity Nam (*)Start (*)Finish


3 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8DESPEJE Y D 15-May-18 01-Jun-18
4 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8EXCAVACIÓN17-May-18 06-Jul-18
5 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8EXCAVACIÓN15-May-18 11-Jun-18
6 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8TERRAPLÉN O17-May-18 03-Aug-18
7 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8CORONACIÓN21-May-18 20-Jun-18
10 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Marco O.D. 20 29-May-18 05-Jun-18
11 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Caño O.D. 2029-May-18 06-Jun-18
13 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Cunetas 29-May-18 14-Aug-18
14 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Bajantes 29-May-18 11-Jul-18
19 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Excavación en26-Jun-18 05-Jul-18
20 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Pilotes Ø 18 05-Jul-18 24-Jul-18
21 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encepado est25-Jul-18 07-Aug-18
22 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encepado pila25-Jul-18 26-Jul-18
23 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encepado pila25-Jul-18 26-Jul-18
24 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encepado pila25-Jul-18 26-Jul-18
25 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encepado est25-Jul-18 01-Aug-18
27 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Estribo 1 25-Jul-18 10-Aug-18
28 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Estribo 2 02-Aug-18 17-Aug-18
29 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Pila 1 27-Jul-18 02-Aug-18
30 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Pila 2 27-Jul-18 02-Aug-18
31 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Pila 3 27-Jul-18 02-Aug-18
32 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Cabecero pila27-Jul-18 02-Aug-18
34 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Vigas prefabr03-Aug-18 07-Aug-18
35 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Encofrado pe24-Jul-18 01-Aug-18
36 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81.
Tablero 01-Aug-18 10-Aug-18
37 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Impermeabili10-Aug-18 17-Aug-18
38 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Relleno cuñas20-Aug-18 31-Aug-18
39 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Remates y var03-Sep-18 03-Sep-18
42 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Anclajes y gun12-Jun-18 18-Jun-18
43 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Viga de atado12-Jun-18 20-Jun-18
44 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Micropilotes (212-Jun-18 18-Jul-18
46 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Excavación en12-Jun-18 12-Jun-18
47 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Excavación en12-Jun-18 12-Jun-18
48 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Resto de sole12-Jun-18 30-Jul-18
49 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Revestimient15-May-18 02-Jul-18
51 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Anclajes y gu 06-Aug-18 15-Oct-18
52 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Viga de atado16-Oct-18 24-Oct-18
53 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Micropilotes 16-Oct-18 21-Nov-18
55 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Preparación y03-Jul-18 03-Jul-18
56 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Boca Oeste 03-Jul-18 24-Jul-18
57 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Boca Este 03-Jul-18 24-Jul-18
58 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Rellenos fals 03-Jul-18 10-Jul-18
59 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Rellenos fals 03-Jul-18 20-Jul-18
60 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Acabados y li24-Jul-18 24-Jul-18
62 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Zahorra artific03-Sep-18 18-Oct-18
63 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Capa Base M.19-Sep-18 25-Oct-18
64 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Capa Interme27-Sep-18 01-Nov-18
65 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Capa Rodadu26-Oct-18 08-Nov-18
67 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Tierra vegetal08-Nov-18 26-Dec-18
68 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Hidrosiembra27-Nov-18 23-Jan-19
69 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH8Plantaciones 17-Dec-18 30-Jan-19
72 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Señalización v08-Nov-18 12-Nov-18
73 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Pinturas 08-Nov-18 14-Nov-18
74 Not Started VIADUCTO TOLEDO 2007.xml.CH81.CH81
Barreras flexi08-Nov-18 23-Nov-18
75 Not Started VIADUCTO TOLEDO 2007.xml.CH81 REMATES, LI 30-Jan-19 31-Jan-19
76 Not Started VIADUCTO TOLEDO 2007.xml.CH81 FIN DE OBRA 31-Jan-19 01-Feb-19
TA1-200 Not Started VIADUCTO TOLEDO 2007.xml RASILLON 15-May-18 04-Jun-18
TA1-250 Not Started VIADUCTO TOLEDO 2007.xml INST. BAÑO 15-May-18 04-Jun-18
TA1-260 Not Started VIADUCTO TOLEDO 2007.xml INST.COCINA15-May-18 04-Jun-18
TA1-300 Not Started VIADUCTO TOLEDO 2007.xml FT ESCAYOLA15-May-18 04-Jun-18
TA1-320 Not Started VIADUCTO TOLEDO 2007.xml PINT. TEMPLE15-May-18 04-Jun-18
resource_list delete_record_flag
(*)Resources Delete This Row
DESPEJE Y DESBROCE Y DEMOLICIONES
EXCAVACIÓN TIERRA VEGETAL
EXCAVACIÓN EN DESMONTES Y SANEOS
TERRAPLÉN O PEDRAPLÉN
CORONACIÓN DE EXPLANADA
Marco O.D. 203,1 (4,00x 2,00)
Caño O.D. 207.6 Ø1800
Cunetas
Bajantes
Excavación en cimientos
Pilotes Ø 1800 mm. (23,5 ml)
Encepado estribo 1
Encepado pila 1
Encepado pila 2
Encepado pila 3
Encepado estribo 2
Estribo 1
Estribo 2
Pila 1
Pila 2
Pila 3
Cabecero pilas
Vigas prefabricadas (36,00 ml)
Encofrado perdido
Tablero
Impermeabilización
Relleno cuñas de transición
Remates y varios
Anclajes y gunitado de taludes Anclajes y gunitado de taludes
Viga de atado (2 x 18ml) Viga de atado (2 x 18ml)
Micropilotes (22 ml) Micropilotes (22 ml)
Excavación en avance.
Excavación en destroza.
Resto de solera, drenaje.
Revestimiento e impermeabilización
Anclajes y gunitado de taludes
Viga de atado (2 x 18ml)
Micropilotes (22 ml)
Preparación y montaje inicial de encofrados
Boca Oeste
Boca Este
Rellenos falsos túneles. Boca Oeste
Rellenos falsos túneles. Boca Este
Acabados y limpieza
Zahorra artificial
Capa Base M.B.C. G-25
Capa Intermedia M.B.C. D-20
Capa Rodadura M-10
Tierra vegetal
Hidrosiembra
Plantaciones
Señalización vertical
Pinturas
Barreras flexibles
REMATES, LIMPIEZA FIN DE OBRA
FIN DE OBRA
user_data
UserSettings Do Not Edit
DateFormat=dd'-'mmm'-'yy
CurrencyFormat=EURO