SHOP DRAWING
350
110
240
400 1500 250 4850 7000 3900 3900 7000 4850 250 1500 400
Ø13-150 Ø13-200 Ø13-250 Ø13-200 Ø13-150
LAYOUT KABEL PC-I GIRDER H-1.7m
C D
L-35.8m , CTC 2.3m
320
320
8 D13
2 D13
320
2D13
INFRA STRUKTUR
BURSTING STEEL
C
35800L
MENGETAHUI NAMA TANDA TANGAN
7000 7000 7800 7000 7000 SITE
AKHMAD
ENGINEER
MUDJIBURROKHMAN
B MANAGER
X
KONTRAKTOR PELAKSANA
400 400
800
C
X
35800
TAMPAK ATAS
TAMPAK ATAS
SKALA 1:150
1.CONCRETE
COMPRESSIVE STRENGTH AT SERVICE : Min K - 600
COMPRESSIVE STRENGTH AT STRESSING : Min K - 600
Ø AGGREGATE MAX. : 20 mm
2.PRESTESSING STEEL
- PC STRAND Ø 12,7 mm DIPERIKSA NAMA TANDA TANGAN
(Grade -270-ASTM A416)
- JACKING FORCE : 75% UTS
PROJECT MANAGER HADI PRIYONO
- Beban SiDL : 1,1 kN/m (Aspal t=5 cm)
- Beban LL : 7,88 kN/m
SITE ENGINEER
: 49 kN/m 1 ( ) BASTI AGUSMAN
MANAGER
Angkur hidup
1 X 14 K 13
Ø strand 0.5"
C1=19K13 C1=19K13 K-Range prestressing system
Jumlah strand per tendon
Bursting Steel D13 Jumlah tendon
C2=19K13 C2=19K13
1700
1700
C3=19K13
C3=19K13
1050
C4=19K13 C2=19K13
350
Tendon
C3=19K13
400
800
350
C4=19K13
200 150 150 200
350 350 700
NO. REFERENSI :
700 400 1500
NO. GAMBAR :
SKALA 1:35 SKALA 1:35 SKALA 1:35 SKALA 1:35 SKALA HALAMAN TOTAL HALAMAN
Nts 1 7
1.CONCRETE PROYEK
COMPRESSIVE STRENGTH AT SERVICE : Min K - 600
COMPRESSIVE STRENGTH AT STRESSING : Min K - 600 7000
Ø AGGREGATE MAX. : 20 mm
PELAKSANAAN PEKERJAAN PEMBANGUNAN JALAN TOL
2.REINFORCING STEEL 3 4 5 6 RUAS LUBUK LINGGAU - CURUP - BENGKULU
- DIA > 13 mm : BJTD 40 TAHAP 1 : BENGKULU - TABA PENANJUNG
- DIA < 13 mm : BJTP 24 G1 D13
3.PRESTESSING STEEL G1A D13
- PC STRAND Ø 12,7 mm G1B D13
G8 D13
SHOP DRAWING
(Grade -270-ASTM A416) G7 D13
- JACKING FORCE : 75% UTS
800
700
G4 D13
G7 D13
DETAIL PENULANGAN
G1B D13
G1A D13 G8 D13 PC-I GIRDER H-1.7m
G1 D13 L-35.8m , CTC 2.1m
3 4 5 6
KONTRAKTOR PELAKSANA
1900 250 4850
3 4 G8 D13 5 6
G1B D13
G1 D13
G1A D13
G4 D13 INFRA STRUKTUR
SITE
AKHMAD
ENGINEER
MUDJIBURROKHMAN
MANAGER
SUBKONTRAKTOR
CATATAN
G1 D13 G6-2D13 G1 D13 G6-2D13
G5-2D13 G5-2D13
ST1 D13
G6-2D13 G6-2D13 ST1 D13 ST1 D13
G5-2D13 G5-2D13
ST1 D13
G7-5D13 G7-5D13 G7-5D13 G7-5D13
G6-2D13 G6-2D13
ST1 D13 ST1 D13
1700
1700
1700
1700
G5-2D13 G5-2D13
ST1 D13
G6-2D13 G6-2D13
G5-2D13 ST1 D13 G5-2D13 ST1 D13 ST1 D13
NO. REFERENSI :
SKALA 1:30 SKALA 1:30 SKALA 1:30 SKALA 1:30 SKALA HALAMAN TOTAL HALAMAN
Nts 2 7
1.CONCRETE PROYEK
COMPRESSIVE STRENGTH AT SERVICE : Min K - 600
COMPRESSIVE STRENGTH AT STRESSING : Min K - 600
Ø AGGREGATE MAX. : 20 mm
PELAKSANAAN PEKERJAAN PEMBANGUNAN JALAN TOL
2.REINFORCING STEEL RUAS LUBUK LINGGAU - CURUP - BENGKULU
- DIA > 13 mm : BJTD 40 TAHAP 1 : BENGKULU - TABA PENANJUNG
- DIA < 13 mm : BJTP 24
3.PRESTESSING STEEL
- PC STRAND Ø 12,7 mm SHOP DRAWING
(Grade -270-ASTM A416)
- JACKING FORCE : 75% UTS
7000 7800 DETAIL PENULANGAN
7 8 PC-I GIRDER H-1.7m
L-35.8m , CTC 2.3m
G8 D13 G8A D13 G8 D13 G8 D13
G7 D13 G11 D13
KONTRAKTOR PELAKSANA
G7 D13 G11 D13
G8 D13 G8A D13 G8 D13 G8 D13
7 8
INFRA STRUKTUR
D13@100 D13@250 D13@100 D13@100 D13@300 200 D13@300 D13@100
G8 D13 7 G8 D13 8
SUBKONTRAKTOR
CATATAN
1700
1700
1700
G14 D10 G14 D10
G15-10D10 G16-10D10
SKALA 1:30 SKALA 1:30 SKALA 1:25 SKALA HALAMAN TOTAL HALAMAN
Nts 3 7
PROYEK
DENAH DIAFRAGMA
SKALA 1:35
INFRA STRUKTUR
D13-150 D13-150
MENGETAHUI NAMA TANDA TANGAN
SITE
AKHMAD
ENGINEER
MUDJIBURROKHMAN
MANAGER
SUBKONTRAKTOR
265
4D13
880
277
264
200
POTONGAN A
2x4D13 2x4D13 SKALA: 1:Nts
DIPERIKSA NAMA TANDA TANGAN
2300 2300
HADI PRIYONO
PROJECT MANAGER
D13-150 D13-150
4D13
CATATAN
6D13 - 208
1250
500
2x6D13 2x6D13
1.CONCRETE
4D13 4D13 POTONGAN B COMPRESSIVE STRENGTH AT SERVICE : Min K - 600
SKALA: 1:Nts COMPRESSIVE STRENGTH AT STRESSING : Min K - 600 NO. REFERENSI :
Ø AGGREGATE MAX. : 20 mm
2300 2300 2.REINFORCING STEEL NO. GAMBAR :
- DIA > 13 mm : BJTD 40
- DIA < 13 mm : BJTP 24 TANGGAL :
3.PRESTESSING STEEL
PENULANGAN DIAFRAGMA UJUNG - PC STRAND Ø 12,7 mm SKALA HALAMAN TOTAL HALAMAN
(Grade -270-ASTM A416)
SKALA 1:50 - JACKING FORCE : 75% UTS Nts 4 7
PROYEK
800 800
75 650 75 75 650 75 PELAKSANAAN PEKERJAAN PEMBANGUNAN JALAN TOL
125 75 RUAS LUBUK LINGGAU - CURUP - BENGKULU
TAHAP 1 : BENGKULU - TABA PENANJUNG
120 125
50 700 50 SHOP DRAWING
1700
1700
1700
1700
KONTRAKTOR PELAKSANA
C2=19K13
250 200 250
C3=19K13 C1=19K13
C4=19K13
C2=19K13
250
676
464
332
296
INFRA STRUKTUR
200
250
155
138
122
C3=19K13
C4=19K13
342 9 9 342 226 124 124 226
700 700
700 700
MENGETAHUI NAMA TANDA TANGAN
SITE
AKHMAD
ENGINEER
MUDJIBURROKHMAN
MANAGER
POTONGAN UJUNG GIRDER POTONGAN TENGAH GIRDER DETAIL PROFIL TENDON SEGMEN 1-2 & 4-5 DETAIL PROFIL TENDON SEGMEN 2-3 & 3-4 SUBKONTRAKTOR
SKALA 1:100 SKALA 1:100 SKALA 1:100 SKALA 1:100
800 800
400 400 400 400
170 170
150
320
DIPERIKSA NAMA TANDA TANGAN
310
HADI PRIYONO
PROJECT MANAGER
530
270
MANAGER
PIN JOINT
DRAFTER RICKY ANDRIAN
1700
1700
CATATAN
380
650
390
200
200
180 170 170 180 150 200 200 150
700 700
1.CONCRETE
COMPRESSIVE STRENGTH AT SERVICE : Min K - 600
COMPRESSIVE STRENGTH AT STRESSING : Min K - 600 NO. REFERENSI :
Ø AGGREGATE MAX. : 20 mm
DETAIL PIN JOINT SEGMEN 1-2 & 4-5 DETAIL PIN JOINT SEGMEN 2-3 & 3-4 2.REINFORCING STEEL NO. GAMBAR :
- DIA > 13 mm : BJTD 40
SKALA 1:100 SKALA 1:100 - DIA < 13 mm : BJTP 24 TANGGAL :
3.PRESTESSING STEEL
- PC STRAND Ø 12,7 mm SKALA HALAMAN TOTAL HALAMAN
(Grade -270-ASTM A416)
- JACKING FORCE : 75% UTS Nts 5 7
PROYEK
SHOP DRAWING
BARSHAPE
BENTUK BESI & DAFTAR BESI
PC-I GIRDER H-1.7m
BARLIST GIRDER EXTERNAL L-35.8m , CTC 2.3m
D D E D E
E
F F F
KONTRAKTOR PELAKSANA
A
B INFRA STRUKTUR
C C C
C
C
D E SITE
AKHMAD
A A ENGINEER
MUDJIBURROKHMAN
MANAGER
C
B
C
B
D
D E E SUBKONTRAKTOR
A
B
G5 D13
C
A B
G5A D13 DIPERIKSA NAMA TANDA TANGAN
C
C
HADI PRIYONO
PROJECT MANAGER
B
B
A
B SITE ENGINEER BASTI AGUSMAN
MANAGER
G6 D13 G6A D13 G6B D13
G5B D13
C DRAFTER RICKY ANDRIAN
CATATAN
A
A
NO. REFERENSI :
NO. GAMBAR :
TANGGAL :
Nts 6 7
PROYEK
D E F G C
PELAKSANAAN PEKERJAAN PEMBANGUNAN JALAN TOL
RUAS LUBUK LINGGAU - CURUP - BENGKULU
B
TAHAP 1 : BENGKULU - TABA PENANJUNG
B
BENTUK BESI & DAFTAR BESI
B
PC-I GIRDER H-1.7m
A
C
ST1 D13 L-35.8m , CTC 2.3m
KONTRAKTOR PELAKSANA
E
D
A E
F
H
B
I
C C C
G8 D13 G11A D10 A INFRA STRUKTUR
A A
BURSTING STEEL
C
B
C
B
D E D E
G
F
SUBKONTRAKTOR
C
B
F
A
A
D
D E
F
G
C
B
G13 D10
A
A
G
G10 D13
F
D
D E
C
B
A HADI PRIYONO
PROJECT MANAGER
G14 D10
SITE ENGINEER BASTI AGUSMAN
MANAGER
CATATAN
C
G11 D10
G15 D10
G7 D13
NO. REFERENSI :
NO. GAMBAR :
Nts 7 7