Professional Documents
Culture Documents
WEEKLY PRODUCTION
Manpower Short
Manpower Short
Air Compressure Problem & Line-8 Extra Production Not Inputted in ERP (Buyer-Mayoral)
Manpower Short
Line -17 Full Stopped Due to Manpower Short & EID General Duty
Line-10 Extra Production Not Inputted in ERP, Machine Problem (Line-1,4) & Manpower Short
Line-10 Extra Production Not Inputted in ERP & Machine Problem (Line-8)
Line-8 Overlock (86 Min) & Line-2 Bon Topsin (45 min)
Line maintenance & electrical work (Line-3,10)
Line-5 Machine thread cut & front pocket Iron key problem
Line - 10 Loop make machine problem
Line maintenance & machine problem Line-08,05,14 (Power board & thread cut issues, Looper thread cut problem &skip problem)
Line-13 (1 hr) work hampered due to Waistbelt number mistake from cutting & Line -07 Sewing side seam machine adjustment pro
Line -07 (machine Skip problem & lope uneven problem) & some technical issues.
Line - 04 machine thread cut problem & Line -03 Pattern sewer machine feed problem & Layout (Line-7,11).
Line maintenance & machine problem Line-14 (Waist loop make machine(2nls) uneven and folder problem)
Line -03 Loop make machine (Flat lock) maintenance & Line-16 size numbering mistake from cutting section.
Line -06 (Thread breakage problem) & Line -01 machine skip problem & manpower short.
Line maintenance for machine problem Line-03(Roller broken problem) & some technical issues
Line-04 Machine Problem (Thread cut problem & machine skip problem)
Line-01,04 (Arm hole top stitch machine circuit problem,Kansai machine skip problem)
Fusing machine motor moving set problem & line -05 sewing back yoke machine needle bar brocken problem
Machine maintenance Line-03 Attach waist band to body (kansai) machine roller bearing problem & Seam cut mark updown proble
Line -03 (Machine thread cut problem, overlock machine problem and sew backrise machine skip problem).
Revit attach auto machine board problem and attach snap button machine mottor problem in finishing section.
Line-10 Zipper Ttach and j. stitch machine problem & some technical issues.
Machine problem Line -05 body bartack machine thread cut and ink rises problem, Line-15 back pocket stc alteration problem & m
Manpower short & some techinical issues.
Line maintenance at line-04 & 06 back pocket, waistbelt t/s & Bottom hem machine problem.
Finishing
Reason for Variation
Manual ERP Variation
24515 24515 0
16530 16530 0
19297 19297 0
21505 21505 0
24010 24010 0
22010 21180 -830
21005 21005 0
21026 21026 0
20112 20112 0
16511 16511 0
18016 17716 -300 SMS
17510 17510 0
23106 23106 0
38042 23538 -14504 SMS/Finishing 2 days production.
0 14504 14504 Weekend
21000 21000 0 SMS
22502 22502 0 SMS
21177 21177 0 SMS
19138 16331 -2807
21005 17078 -3927
24032 21336 -2696
20036 19,741 -295
21104 20,804 -300
21515 20913 -602
18509 18,509 0
22041 22,041 0 Extra production not inputted in ERP(Buyer-MAYORAL)
18501 18501 0
13003 12,703 -300
16800 16,500 -300 Extra production not inputted in ERP(Buyer-LPP, Line-10)
16006 16006 0 Extra production not inputted in ERP(Buyer-MAYORAL, Line-10)
17003 17,003 0
18017 18,017 0
19014 17,271 -1,743 Extra production not inputted in ERP(Buyer-CENCOSUD, Line-8)
20503 14,787 -5,716
19260 15,657 -3,603
19034 14,562 -4,472
20015 16,153 -3,862 Extra production not inputted in ERP(Buyer-LPP, Style-290AN/15450, Line-1)
21117 17,336 -3,781 Extra production not inputted in ERP(Buyer-LPP, Style-290AN/15450, Line-1)
19503 15103 -4400 Extra production not inputted in ERP(Buyer-LPP, Style-290AN/15450+ZB115, Line-1)
19033 14,533 -4,500 Extra production not inputted in ERP(Buyer-LPP, Style-290AN/ZB115, Line-1)
19005 15,596 -3,409 Extra production not inputted in ERP(Buyer-LPP, Style-290AN/ZB115, Line-1)
16008 15,100 -908
19204 18,464 -740
22515 22,515 0
22503 17,003 -5,500
18100 13,900 -4,200 Wash send size set(Buyer-Lpp,Just Group)
22015 16,846 -5,169 Extra production not inputted in ERP(Buyer-LPP, Style-802/ZA176, Line-4,12)
22010 18,357 -3,653 Extra production not inputted in ERP(Buyer-LPP, Style-802, Line-4), Wash send Some deliveries were made after 10:00 PM but due to inabilit
22156 15,977 -6,179
23110 13,675 -9,435 Send wash previous day, Size set sample pcs. Receive wash some extra pcs, size set sample
21056 12,088 -8,968 Send wash some rewash qty, Received wash some extra pcs.
23550 12,793 -10,757 Send wash previous day, Received wash size set sample
24115 10,784 -13,331 Wash Received some extra pcs & size set sample
20010 13,372 -6,638 Send wash some previous day, Wash Received size set sample
19506 13,401 -6,105 Send Wash Some deliveries were made after 10:00 PM but due to inability to change date in ERP, those quantities became on next day.
22015 18,340 -3,675 Send wash some previous day, Wash Received extra pcs & size set sample.
22005 17,294 -4,711 Send wash some Rewash, Wash Received extra pcs & size set sample.
18006 16,388 -1,618 Send Wash Some deliveries were made after 10:00 PM but due to inability to change date in ERP, those quantities became on next day.
19007 18,529 -478 Send wash some previous day, Wash Received extra pcs.
22044 21,459 -585 Send Wash Some extra pcs & deliveries were made after 10:00 PM but due to inability to change date in ERP, those quantities became on next
23024 23,024 0 Send wash some previous day & wash receive some rewash & size set
22546 22,546 0 Send wash some previous day & wash receive some size set
22,504 22,504 0 Send Wash Some extra pcs & deliveries were made after 10:00 PM but due to inability to change date in ERP, those quantities became on next
15002 15,002 0
22,002 22,002 0 Send wash some previous day & wash receive some size set
23069 23,069 0 Wash receive some size set
22010 22,010 0 Send wash some rewash & wash receive some rewash & size set
22015 22,015 0 Send wash some previous day & wash receive some rewash
23,006 23,006 0 Send wash some rewash,size set & wash receive some size set.
21,543 21,543 0 Send wash some rewash & wash receive some Extra qty.
15012 15,012 0
22,509 22,509 0 Send wash some previous day & wash receive some extra, size set qty
22,515 22,515 0 Wash send rewash qty, size set & wash receive some size set qty.
22,610 22,610 0 Send wash some previous day qty.
24,058 24,058 0 Wash send some rewash qty .
24,010 24,010 0 Wash receive some rewash qty .
23,529 23,529 0 Wash send some rewash qty & wash receive some size set.
23,078 23,078 0 Wash send some rewash qty & wash receive some size set.
22,015 22,015 0
21,543 21,543 0 Wash send some rewash & size set pcs & wash receive some size set sample.
22,015 22,015 0 Wash receive some size set.
22,025 22,025 0
0
0
0
0
er 10:00 PM but due to inability to change date in ERP, those quantities became on 25th.
Style: 181313, Prev. qty showing the total of multiple styles. 03-01-24 3 Days
Sewing Qty. should be PO & Color wise. 03-01-24 3 Days
Pending List
Pocketing color option will be required at booking
Done
Done
Pending
Pending