WORK BREAKDOWN STRUCTURE

CONSTRUCTION OF
A BRIDGE

2. DRAWING 3. PURCHASE OF
1. SITE DELIVERY 4. CONSTRUCTION 5. CLOSING
APPROVAL MATERIAL

1.1. Survey 2.1. Documents 3.1. Estimate Quantities 4.1. Site Preparation 5.1. Inspectio
Contact Us Testing
n and
1.1.1. Surface 2.1.1. Design Memo 3.2. Purchase Steel 4.1.1. Clear Site 5.1.1. Load Test
Investigation 2.1.2. Engineering Review 3.3. Purchase Tool 4.1.2. Remove Debris 5.1.2. Certification
1.1.2. Ground Behavior, 2.1.3. Specification
Control
1.1.3. Special Hazards 4.2. Substructure 5.2. Maintenance
Investigation 2.2. Public Approval 4.2.1. Foundation 5.2.1. Periodic Checks
2.2.1. Public Comment 4.2.2. Abutment 5.2.2. Structural
2.2.2. Hearings 4.2.3. Abutment Cap Maintenance
1.2. Planning and Design
1.2.1. Community Needs 5.2.3 Surface
1.2.2. Traffic Flow 2.3. Bidding 4.3. Superstructure Maintenance
1.2.3. Environmental 2.3.1. Project 4.3.1. Dirt Wall
Condition Information Session 4.3.2. Pedestal
1.2.4. Safety Criteria 2.3.2. Bid Review and 4.3.3. Deck Slab
Selection Girder
Cross Girder
1.3. Detailed Design
Approach Slab
1.3.1. Exact Dimensions
Crash Barrier
1.3.2. Strength and
4.3.4. Retaining Wall
Stability Calculations
4.3.5. Wearing Coat
1.3.3. Structural Details
1.3.4. Materials Used