1 General & Preliminaries

1.1 Key Milestones


1.1.1 Contractual Milestones Performance security.
1.1.2 Control Milestones
1.2 NOC from Authorities Insurance of the Works.
1.2.1 Submission of NOC's
1.2.2 Approval/Receiving of Construction NOC's Third party insurance.
1.3 Contractual Requirements
1.4 Temporary works
1.4.1 Site Safety & Traffic Diversion/Management
1.4.2 Project Sign Board
2 Engineering
2.1 Baseline Program
2.2 Method Statement Submittals
2.2.1 Method Statement Submission
2.2.2 Method Statement Approval
2.3 Prequalification Submittals
2.3.1 Prequalification Submission
2.3.2 Prequalification Approval
2.4 Material Submittals
2.4.1 Material Submission
2.4.2 Material Approval
2.5 Shop Drawing Submittals
2.5.1 Shop Drawing Submission
2.5.2 Shop Drawing Approval
3 Procurement
3.1 Ordering Materials
3.2 Delivery of Materials
4 Construction
4.1 Ground Investigation
4.2 Demolition & Site Clearance
4.2.1 Site Clearance
4.2.2 Demolition
4.3 Earthwork
4.4 Roads & Paving
4.4.1 Unbound Sub-Base
4.4.2 Bituminous Bound Pavements
4.4.3 Kerbs & Kerb Painting
4.5 Provisional Sum
5 Testing & Commissioning
6 Handing Over