Foundation Level of Pile Avg.

(m)
Bottom of Pier cap(m)
Size of Pier Pile cap (m)

S.No. BAR MARK Description of Bar

1 B1 Raft Bottom Bar in Bottom

2 B2 Raft Bottom Bar in Top

3 B4 Raft Bottom Bar in Top

4 B5 Raft Bottom Bar in Bottom

5 Z1 Pier Vertical Bar Both Face(along Barrel)

6 Z2 Pier Vertical Bar Both Face(along alignment)

7 U1 Pier Shaft Distribution bar

8 B3 Pile Cap Raft Binder

9 C2 Pile Cap Raft Link

10 C1 Pier Link
11 * Pile Cap Raft Chair
410.743 Top of Pier Pile cap 423.743 Top of Pier cap
421.943 Bottom of Pier cap 436.424 Formation Level
8.70x5.10 thickness of Pier shaft(m) 1.4 Clear Covver (mm)

Dia of Spacing(m
Shape M1(mm) M2(mm) M3(mm) M4(mm) M5(mm)
Bar(mm) m)

25 125 1425 4950 0 0 0

25 125 1425 8550 0 0 0

25 125 600 4950 0 0 0

20 125 600 8550 0 0 0

32 125 500 15206 1000 0 0

23 125 500 15206 1000 0 0

16 125 2040 5450 0 0

16 125 4900 4900 8500 0 0

10 250 100 1650 0 0 0

10 250 100 1300 0 0 0


20 15 Nos 250 1550 1000 0 0
Top of Pier cap 437.799
Formation Level 439.758
Clear Covver (mm) 75

Cutting
No. of
Length(m
Bars
m)

7700 69

11300 41

6050 69

9670 41

16578 90

16578 32

14980 102

26672 13

1810 735

1460 1122
4440 16