You are on page 1of 5

Ice Cream

SMSF 2024, BCEC


Artist's Impression
Plants and props are a representation only. Graphics to be supplied by the client.

Sheet List
Sheet
Number Sheet Name
A01 Title Page
A02 Perspective View
A03 Plan and Elevations
A04 Render
B03 Signage Schedule

Development
VENUE:
SMSF 2024, BCEC
ACCT MANAGER: Sarah M/Sheri REVISION NUMBER: D 01 PAGE NUMBER: A01

Not for construction


DESIGNER: Katie D REVISED BY: KD PAGE SIZE: A3
© Harry the hirer
EVENT DATE: Feb, 2024 REVISION DATE: 1/12/2023 8:30:13 AM SCALE:

FILE: O:\_2024\SMSF 2024\Organiser\Feature Areas\Ice Cream\Ice Cream - SMSF 2024.rvt


Perspective View
Artist's Impression
Plants and props are a representation only.
Graphics to be supplied by the client.

Infill Panel Materials

Foam PVC

Digital print signage

Furniture Schedule
Description Qty

WALLING Nero walling with curved


beam feature and capsule fascia
Signage on back wall
Aspen side walling is neighboring shell
walling

Development
PROJECT: VENUE:
ACCT MANAGER: Sarah M/Sheri REVISION NUMBER: D 01 PAGE NUMBER: A02

Not for construction Ice Cream SMSF 2024, BCEC


EVENT DATE: Feb, 2024
DESIGNER: Katie D REVISED BY:
REVISION DATE:
KD
1/12/2023 8:30:14 AM
PAGE SIZE:
SCALE:
A3
1 : 100
© Harry the hirer
FILE: O:\_2024\SMSF 2024\Organiser\Feature Areas\Ice Cream\Ice Cream - SMSF 2024.rvt
Plan and Elevations
Infill Panel Materials

Foam PVC

Digital print signage

3000

3000
992

1488

1 Plan View
A03 1 : 40
616

2990
2374
992

2 Elevation - Front 3 Elevation - Right


A03 1 : 40 A03 1 : 40

Development
PROJECT: VENUE:
ACCT MANAGER: Sarah M/Sheri REVISION NUMBER: D 01 PAGE NUMBER: A03

Not for construction Ice Cream SMSF 2024, BCEC


EVENT DATE: Feb, 2024
DESIGNER: Katie D REVISED BY:
REVISION DATE:
KD
1/12/2023 8:30:15 AM
PAGE SIZE:
SCALE:
A3
As indicated
© Harry the hirer
FILE: O:\_2024\SMSF 2024\Organiser\Feature Areas\Ice Cream\Ice Cream - SMSF 2024.rvt
Artist Impression Only
Depicted artwork for indicative purposes only.
Print ready artwork to be supplied by client.
Signage Schedule
Sign
Number Description Substrate Finish Width Height Qty Comments
A1 Nero 3m Deco Fascia Capsule 3mm Corflute White Digital Print 1328 mm 507 mm 1
B1 3mm Forex (985mm x 985mm) Printed Denver Panel 3mm Forex White Digital Print 985 mm 985 mm 1
B2 3mm Forex (985mm x 985mm) Printed Denver Panel 3mm Forex White Digital Print 985 mm 985 mm 1
C1 3mm Forex (985mm x 1482mm) Printed Denver Panel 3mm Forex White Digital Print 1482 mm 985 mm 1
D1 3mm Forex (985 x 2347mm) Printed Aspen Panel PVC 3mm White Digital Print 985 mm 2347 mm 1
D2 3mm Forex (985 x 2347mm) Printed Aspen Panel PVC 3mm White Digital Print 985 mm 2347 mm 1
D3 3mm Forex (985 x 2347mm) Printed Aspen Panel PVC 3mm White Digital Print 985 mm 2347 mm 1
Grand total (items) 7

A1

D1

D2

D3

B2

B1 C1

Development
PROJECT: VENUE:
ACCT MANAGER: Sarah M/Sheri REVISION NUMBER: D 01 PAGE NUMBER: B03

Not for construction Ice Cream SMSF 2024, BCEC


EVENT DATE: Feb, 2024
DESIGNER: Katie D REVISED BY:
REVISION DATE:
KD
1/12/2023 8:30:21 AM
PAGE SIZE:
SCALE:
A3
© Harry the hirer
FILE: O:\_2024\SMSF 2024\Organiser\Feature Areas\Ice Cream\Ice Cream - SMSF 2024.rvt

You might also like