You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

Note :
FOR TIE BEAM DETAILS REF. DWG. No.
BP03-SSD-STL-EVS-TWR-GNLOT-951

LEGENDS :

02
02

THIS DRAWING HAS BEEN CHECKED FOR COMPLETENESS, ACCURACY,


COORDINATION, AND COMPLIANCE WITH THE CONTRACT DOCUMENTS.
ALL DIMENSIONS AND FIELD CONDITIONS HAVE BEEN VERIFIED.
CONTRACTORS'
REPRESENTATIVES DATE: 23-APR-2020

G 200
COORDINATED BY
200 WORK COMPANY DATE REPRESENTATIVE SIGNATURE
DESCRIPTION

STRUCTURAL
EVERSENDAI 23-APR-2020 SSN
STEEL

02 02

REFERENCE
DOCUMENT NO. TITLE REV.
E

02

KEY PLAN
D

02 REVISED AS CLOUDED 23-APR-2020


01 REVISED AS CLOUDED 04-FEB-2020
00 FIRST ISSUE 27-DEC-2019
REV. DESCRIPTION DATE

C PROJECT NAME :

MERDEKA PNB118
CADANGAN MEMBINA 1 BLOK BANGUNAN PERDAGANGAN
BERCAMPUR 118 TINGKAT DI ATAS LOT 795, 796, 797, 799, 800 &
SEBAHAGIAN LOT 743, 746, 802, 803, REZAB JALAN & LAMAN,
MUKIM BANDAR KUALA LUMPUR, DAERAH KUALA LUMPUR,
WILAYAH PERSEKUTUAN

CLIENT :

PNB
PNB MERDEKA VENTURES SDN. BERHAD (51799-A)
TINGKAT 4, BALAI PNB
201-A, JALAN TUN RAZAK
50400 KUALA LUMPUR, MALAYSIA
TEL: 03-2050 5100, 03-2050 5500 FAx: 03-2050 5820

B CONTRACTOR :

SUBCONTRACTOR :

EVERSENDAI CONSTRUCTIONS (M) SDN. BHD.


Lot 19956, Jalan Industri 3/6,
Rawang Integrated Industrial Park
48000 Selangor Darul Ehsan
Tel: 603-6091 2575 Fax: 603-6091 2577
Web Site : www.eversendai.com
DRAWING TITLE :
NOTE:-
FOR MARK NO "RF1 TO RF5, RF5.1, RF6 TO RF13, RF13.1 TO RF13.3, STEEL STRUCTURE SHOP DRAWING
A RF14, RF14.1 TO RF14.3, RF15, RF17 TO RF23 ALL COLUMN AND VERTICAL TOWER, UPPER SOLAR ARRAY
BRACING TO BE GRADE S460ML & ALL BEAMS AND HORIZONTAL LAYOUT PLAN (EL.+564.350 TOS)
BRACING TO BE GRADE S355J0 OF BS EN10025 OR EQUIVALENT.
DRAWN BY : MSV CHECKED BY : PDS
NOTE:-
SCALE : A0 / AS SHOWN DATE : 27-DEC-2019
REFER TO CONNECTION ID MARKING DWG. NO. BP03-SSD-STL-EVS-TWR-USAOT-002
FOR IDENTIFICATION OF STEEL BEAM TO CORE WALL, STEEL TO STEEL AND DRAWING NO. : REV. :

STEEL TO MEGA COLUMNS CONNECTIONS. BP03-SSD-STL-EVS-TWR-USAOT-001 02

You might also like