PRICE N°1: SUPPLY AND INSTALLATION OF PV SOLAR MODULES FOR 570


KWP SOLAR ROOFS

This price covers the supply and installation of photovoltaic panels with the following
characteristics:

 The solar modules must be monocrystalline.


 The solar modules must be based on Mono-PERC bi-glass cells.
 The peak power per module: 540 Wp Standard Test Conditions (STC).
 An efficiency per panel greater than or equal to 25% under standard STC test
conditions.
 The constructor must ensure a minimum of 10 years operation for the solar
modules while maintaining 80% performance after 25 years.
 Junction box up to IP68 and MC4 connectors or equivalent.
 Voltage at maximum power (Vmp) greater than 41 V.
 Intensity at maximum power (imp) greater than 13 A.
 NOCT 45+2
 Permissible module temperature: -40°C +85°C.
 Each module shall be provided with a forgery-proof serial number and a label
giving the factory specifications.
 The frame of the modules shall be made of aluminium.
 Minimum IP of the module 67.

Work paid to the whole

PRICE N°2: SUPPLY AND INSTALLATION OF SOLAR OPTIMIZERS.

This price covers the supply and installation of the solar optimizers, which must meet the
following requirements:

 Minimum efficiency of 99%.


 Overvoltage category II.
 Protection class IP68
 The optimizer must ensure operation for 25 years
 Powerline communication with inverters.
Work paid to the whole

PRICE N°3: SUPPLY AND INSTALLATION OF PHOTOVOLTAIC PANEL


MOUNTING STRUCTURES.

This price covers the supply and installation of aluminium photovoltaic panel mounting
structures. Care will be taken to eliminate any risk of corrosion by electrolytic coupling. All
screws and bolts used will also be stainless. The angle of inclination of the support must be
optimal.

Work paid to the whole

PRICE N° 4: SUPPLY AND INSTALLATION OF GRID CONNECTED PV SOLAR


INVERTERS.

This price covers the supply and installation of solar inverters with the following
characteristics:

 Sinusoidal signal with very low harmonic distortion: THD=< 3%.


 The inverters must be multi MPPT to keep part of the production in case of
maintenance or failure of a part of the solar PV generator or failure of a part of the
solar PV array.
 Output voltage: nominal voltage "-380 V phase to phase 3P+N”
 Frequency: 50 Hz with a tolerance of +/- 1Hz.
 European yield min: 97%.
 Minimum protection class: IP65.
 Max efficiency of the machine greater than or equal to 98%.
 DC/AC ratio between 09 and 1.1 taking into account the maximum power of the
inverter and the module power in STC.
 The inverters must be equipped with arc protection devices
 The inverters must be equipped with devices to protect the photovoltaic modules
against the PID effect

Input (DC):

 Maximum input DC voltage >=1100V.


 Maximum DC current per MPPT >= 226A.
 Maximum short circuit current >=40A.
 Starting voltage: 200V.
 MPPT voltage range: 200-1000V.
 Max number of DC inputs via MPPT: 2
 Minimum number of MPPT inputs: 3

Output (AC):

 Nominal AC active power between 40kW and 60kW


 Maximum apparent AC power between 44 KVA and 66 KVA
 Maximum AC active power (cos phi-1) between 44 KW and 56 KW
 Nominal mains frequency 50 HZ +1%.
 Harmonic distortion rate (THD): <3

Inverter protections:

 Disconnecting device on the DC side: Integrated


 Anti-islanding protection: integrated
 AC overcurrent, short circuit and overvoltage protections: integrated
 Reverse polarity protection DC: integrated
 DC surge protector type 2: Integrated
 AC surge protector type 2: Integrated
 Arc fault protection: Integrated
 Protection against PID effect: Built-in

General characteristics:

 Cooling system: Natural convection or intelligent cooling system (not a forced


system).
 Compatibility with optimizers
 Powerline communication with optimizers

Work paid to the whole

PRICE N°5: SUPPLY AND INSTALLATION OF CONNECTION CABINETS WITH


THE ELECTRICAL NETWORK

This price covers the supply and installation of the connection cabinets with the electrical
network including all the electrical protections required in the CPS.

Work paid to the whole


PRICE 6: SUPPLY AND INSTALLATION OF JUNCTION BOXES AND
PROTECTIONS, CABLES, CABLE TRAYS AND FIXING ACCESSORIES.

This price covers the supply and installation of junction boxes and protections, cables,
cable trays and fixing accessories required in the CPS.

Work paid to the whole

PRICE N° 7: SUPPLY AND INSTALLATION OF SOLAR PRODUCTION METERS


WITH DIGITAL DISPLAY.

This price covers the supply and installation of solar production meters with digital
display.

Work paid by unit

PRICE 8: SUPPLY AND INSTALLATION OF REMOTE INTERNET MONITORING


SYSTEMS FOR THE INSTALLATION.

This price covers the supply and installation of remote monitoring systems for the
installation.

 The data measured will include


 Irradiation on the inclined surface
 Ambient temperature
 The power transmitted to the grid for each inverter
 DC current value for each inverter
 DC voltage for each inverter
 The AC current value for each inverter
 The AC voltage for each inverter:
 The storage capacity of the acquisition device shall be at least 2 years.

Work paid to the whole

PRICE N° 9: SUPPLY AND INSTALLATION OF SYSTEMS FOR DISPLAYING


THE PLANT'S PRODUCTION DATA ON A 65" LED FLAT SCREEN.

This price covers the supply and installation of systems for displaying the production data
of the installation on a professional full HD flat screen monitor that can be displayed 24h/24h,
7d/7d, with a minimum size of 65" and the following characteristics.
 Format: 16 9
 Resolution: 1920 x 1080 (FHD)
 Brightness: 450 cd/m2
 Contrast ratio: 1.100 1
 Life cycle: minimum 45,000 hours

The screen shall be equipped with a display system with a customized Template (hosted on
an in-house server) that allows for the display of at least

 Solar electricity production (daily production, production of the current month,


production of the current year and the cumulative production since commissioning)
 Cumulative CO2 savings since commissioning with its environmental equivalence:
 Financial savings per day/month/year/since commissioning: Presentation of the
plant
 Background with a picture of the power plant.

Work paid for by the unit


PRICE LIST DETAILED ESTIMATE
SUBJECT:
Installation works of a photovoltaic system for the production of electricity in the buildings
of the annex of the Ministry of Interior in Hay Riad Rabat (Tranche 2) (single lot).

PRICE LIST AND ESTIMATE


N° Designation Unit Quantity PU Total (excl.
(excl. taxes)
taxes) DH
1 PRICE N°1: SUPPLY AND INSTALLATION AS A 1
OF PV SOLAR MODULES FOR 570 KWP WHOLE
SOLAR ROOFS
2 PRICE N°2: SUPPLY AND INSTALLATION AS A 1
OF SOLAR OPTIMIZERS. WHOLE
3 PRICE N°3: SUPPLY AND INSTALLATION AS A 1
OF PHOTOVOLTAIC PANEL MOUNTING WHOLE
STRUCTURES.
4 PRICE N° 4: SUPPLY AND AS A 1
INSTALLATION OF GRID CONNECTED WHOLE
PV SOLAR INVERTERS.
5 PRICE N°5: SUPPLY AND INSTALLATION AS A 1
OF CONNECTION CABINETS WITH THE WHOLE
ELECTRICAL NETWORK

6 PRICE 6: SUPPLY AND INSTALLATION AS A 1


OF JUNCTION BOXES AND WHOLE
PROTECTIONS, CABLES, CABLE TRAYS
AND FIXING ACCESSORIES.
7 PRICE N° 7: SUPPLY AND UNIT 1
INSTALLATION OF SOLAR
PRODUCTION METERS WITH DIGITAL
DISPLAY.
8 PRICE 8: SUPPLY AND INSTALLATION AS A 1
OF REMOTE INTERNET MONITORING WHOLE
SYSTEMS FOR THE INSTALLATION.
9 PRICE N° 9: SUPPLY AND UNIT 2
INSTALLATION OF SYSTEMS FOR
DISPLAYING THE PLANT'S
PRODUCTION DATA ON A 65" LED FLAT
SCREEN.
Total ( excl. taxes)

VAT (20%)

Total incl. taxes en DH