Works at Al Mustafa District

Unit
Item Amount
Description Unit Qty. Price
No.
USD USD
Works at Al Mustafa District
Project (AlZewen/2+ Bet Mhuder): -

Provide materials & equipment then start supply and


install integrated horizontal pump ( Pump, electric
engine, electrical operator type Star Delta) power 200
M3/H pressure 60 M must be the same specification
from ( Ksp Germany , Willo Germany, Grundafos
Hungary, Grundafos Denmark) as follows:-
1-Remove the old pump and demolish the concrete
foundation and remove the debris out of the location to
the specific location will determined by the supervising
engineer.
2-Construect suitable reinforced (not less than 100Kg of
rebar per M3 of concrete) concrete for the new pump
including the anger bolt inside the concrete to tide and
fixed the pump all works must be done as per on
specific design.
3-Supply all the required materials and accessories for
jointing (All accessories and piping which will be used in
the both side of the pump (suction and discharge) must
be from carbon steel with thickness at least 10 mm),
supply and install all the required accessories for jointing
from elbow, adapters and transformer with all the
required works such as cutting and welding. Supply all
valves, must be butterfly gearbox type, non-return valve
and anti-vibration from both side and all the mention
above must be from (American, British, Japanese,
Germany, France, Holland) Brand, including all the main
header works.
4-All dimension of accessories in suction side must be
bigger than suction hole with at least (100 mm) and all
1 the dimension of the accessories of main force side
must be bigger than discharge hole with at least (100
mm).
5-Supply, extend and link all the suitable cables.
End section pump
RPM:1500 rpm
Impeller type :- S bronze
Shaft:- stainless steel SS-420
Soft packing
PUMPLUPRICATION= (single point automatic lubricator) Nr 3 5,500.00 16,500.00
Pump efficiency bigger or equal to 70%
Pump case outside coating = powder coating
Pump case inside coating = Epoxy coating
Pump case (ductile iron or cast iron)
Pump operator type: electrical engine
Engine voltage: 380 Volt
Power: not below 55 KW
Engine return speed: 1500 returning per minute
Frequently: 50 Hartis
Type of isolation: F
Type of protection: IP-55
Surrounding temperature: 55 C
Note: Must back all the old pumps to the end user
warehouse.
All the above must be done with the required works
needed as per the supervising engineer instruction.

Project (AlSomod+Om Masjed): -

Provide the required materials & equipment then supply


and install integrated horizontal pump from (Pump,
electric engine, electrical operator type Star Delta)
power 250 M3/H pressure 30 M must be the same
specification ( Ksp Germany , Willo Germany,
Grundafos Hungary, Grundafos Denmark) as follows:-

1-Supply all the required materials and accessories for


jointing (All accessories and piping which will be used in
the both side of pump (suction and discharge) must be
from carbon steel with thickness at least 10 mm) supply
and install all the required accessories for jointing such
as elbow, adapters and transformer with all the required
works such as cutting and welding. Supply all valves,
must be butterfly gearbox type, non-return valve and
anti-vibration from both side and all the mention above
must be from (American, British, Japanese, Germany,
France, Holland) Brand, including all the main header
works with supply and install vacuum.
2-Supply and install filling system for pumps contain
submersible pump 20 M3/H × 10 M with all the
accessories such as elbow, pipes and valves require for
tie in the system with suction pump
3-All dimension of accessories in suction side must be
bigger than suction hole with at least (100 mm) and all
the dimension of the accessories of discharge side must
2 be bigger than main force hole with at least (100 mm).
4- Supply, extend and link all the suitable cables.
End section pump Nr 2 5,800.00 11,600.00
RPM:1500 rpm
Impeller type:- S bronze
Shaft:- stainless steel SS-420
Soft packing
PUMPLUPRICATION=(single point automatic lubricator)
Npsh-Required =>4n
Pump case outside coating = powder coating
Pump case inside coating = Epoxy coating
Pump case (ductile iron or cast iron)
Pump operator type: electrical engine
Engine voltage: 380 Volt
Power: not below 37 KW
Engine return speed: 1500 returning per minute
Frequently: 50 Hartis
Type of isolation: F
Type of protection: IP-55
Surrounding temperature: 55 C

Note: Must back all the old pumps to the end user
warehouse.

Project AlZewen/2:-

Supply and install three-phase submersible pumps


power 225 M3/H and pressure 25 M with electrical
operator ( Ksp Germany , Willo Germany, Grundafos
Hungary, Grundafos Denmark) and the specification of
the electrical operator as below.
Submersible spec: -
IP=68
V=400 volt
HZ=50
Submersible must contain protect as below:-
EFF=0.80
Impeller type S.S
With bronze casing and vanes stainless steel
Shaft: stainless steel -AISI316
Capacity minimum 27 kwatts
3
Pump case outside coating= powder coating Nr 1 4,800.00 4,800.00
Pump case inside coating= epoxy coating
Pump case (ductile iron or cast iron)
Submersible contain the below:
Over leak and overheating and over load
It is include:
1-Provide all the required materials and accessories for
jointing (all accessories and pipes which will be used in
the side of main force for submersible must be carbon
steel thickness not below 10 mm)
with supply and install all the required accessories for tie
in with main header such as elbow, adapters and
transformer with all the required works such as cutting
and welding. All valves must be butterfly gearbox type,
non-return valve and installation chains. With all the
works required and as per the supervising engineer.

Provide required materials & equipment and work on


supply circuit breaker from (France, British, Germany,
japan, Italy) as the below details: -
1-Supply and install circuit breaker capacity 630 A install
Nr 6 640 3840
after the transformers.
2-Supply and install circuit capacity 160 A in complexes
Nr 4 420 1,680.00
(AlMuntadhar, AlJedma).
4 3-Supply and install circuit breaker capacity 250 A in
Nr 4 315 1260
complexes (AlMuntadhar, AlJedma).
Supply and tie in all the require materials to link and
operate.

Provide required materials & equipment and work on


supply starter two-stages switch (delta- star) capacity
5
110 KW for Almuntadhar district complex with all the Nr 2 120 240.00
require works for installation and supply.
Supply required materials & equipment and work on
supply and extend cables size (70×40) mm from
(Jorden, Syria, Oman, Kuwait) from the main panel to
6 the High Propulsion Pumps. including all the required
works such as (excavation works, widening works, M 50 48 2,400
backfilling works and tie in with all the required works
and as per the supervising engineer instruct.
Project (AlZewen2 + Bet Mhoder): -

Supply and install chlorine machine power 4 KG/H as


per the specification below with each machine pipes
stainless steel Qty 2 with length 5 M with suitable fitting
(S.S 316) and suitable lead rings.
The machine must be separate type and can be fixed on
the wall.
1-Add with machine Non-return valve suitable with
chlorine gas.
2-The machine must contain chlorine gas filter.
3-Add to each machine Non-return valve, PVC type size
¼ INCH tie in between the machine and the injector.
4-Add and tie in Non-return between the booster and
pumping point in the circle.
All the above must be from (Germany, Denmark,
7 English, America)
Supply and install chlorin booster pressure 10 Bar as the
below details.
Specification details: =
Pump body = stainless steel AISI 304 Nr 4 6,400.00 25,600.00
Impeller diffuser = Stainless steel AISI 316
Seal holder = Stainless steel AISI 316
Mechanical seal= EPDM
Shaft= AISI 316
All the above must be from (Germany, Denmark,
English, America)
And the work includes suppling and linking pipes from
brass materials it is start from chlorin Cylinder to the
machine QTY 2 and UPVC pipes from the machine to
the boosters the works include all the required
accessories for linking and as per the supervising
engineer instruct.

Supply the require materials to maintenance the network


as list below:-
- Supply steel hose clamp D 110 mm Nr 25 18 450
- Supply steel hose clamp D160 mm Nr 35 18 630.00
- Supply steel hose clamp D 225 mm Nr 25 23 575.00
- Supply steel hose clamp D 250 mm Nr 25 23 575
- Supply butterfly gearbox 250 mm Nr 14 210 2,940
- Supply butterfly gearbox 225 mm Nr 12 120 1,440
Note: - All the above must be from (American, British,
Japanese, Germany, France, Holland)
8 Valve specification: -

- Disk / ductile

- Cast iron body with epoxy coated

- Standers ISO top flange for direct mounting

- Double flange (Long type)

Supply air compressor to fill equipment wheels, power


(10 horse) capacity 500 L (3 Piston) three phase with all
9
the required works as per the supervising engineer Nr 1 3,800.00 3,800.00
instruct.

- Supply refrigerator 12 Feet Nr 2 800 1,600.00

- Supply and install air-condition, power 2 Ton


type (LG, Hisense, Al-warth) use cable 4 mm with all Nr 1 980 980
10 the require electrical work with protection machine.
- Supply air-condition, power 2 Ton with
Nr 4 90 360.00
protection machine.

Supply non-return double flange from (Germany,


Denmark, English, America, Japan, France, Belgium)

11
- Non-return double flange D 6 Nr 6 120 720
- Non-return piston check valve 5 Nr 6 240 1440

Supply the required materials to works on winding


electric motors and supply and install all the require
materials and accessories to operate the motor
12

- Power motor 45 KW Nr 1 850.00 850.00


- Power motor 55 KW Nr 2 1,100.00 2,200.00
Supply the list below: -
- Ball bearing size 6310 type SKF Nr 20 48 690.00
13
- Ball bearing size 6309 type SKF Nr 25 88 2,200.00

Chlorine system for complex of AlMuntadhar


district: -

Supply all the require materials & equipment and work


on supply with link pipes type PPR high pressure size 1,
¾ for chlorine system between booster and chlorine
14
machines and injection machines with supply all the
Ls Ls 3200 3200
require accessories for linking such as elbow,
transformer, adapter and valves, food type and
nonreturn valve. All of these must be done by instruct of
supervising engineer.

Project (Alzewen1+Almuntadhar district):-

Supply all the require materials & equipment and work


15 on supply and install booster pressure 16 Bar with
electrical operator and supply all the require accessories Nr 3 890 2670
and materials. All these must be done by the instruct of
supervising engineer.

Al Zewen project: -

Supply all the require materials & equipment and work


on maintenance and operate power generator 400KVA
Perkins include the below: -
Nr 1 2400 2400
- Repair the generator motor.
16

- Replace oil filter and gasoil filter.


- Replace the battery.

All must be done by the instruct of supervising engineer.

Supply mechanic tool kit contain the below; -


(wrench big size (set 2), wrench small size (set 2),
thermal screwdriver ( set 2), pliers (Qty.2), cutter pliers
(Qty.2),
Hummer 5 Kg (Qty.2), iron saw (Qty.2), wooden saw
17 (Qty.2), socket big size ( set 1), socket small size ( set
1), hex key (set 2), tool bag (Qty.2), drilling hammer
Ls Ls 4800 4800
2400 W ( Qty.1), electrical cutter machine ( Qty.1), pin
punch ( Qty.2), cyclone bar (Qty.1)). All the above must
be from (Germany, Denmark, English, America)

18 Supply hydraulic cart for lift the pumps. Nr 1 120 120


Project ( Al Muntadhar district+ Al Zewen 2+Aljedaa-
Om AlSjda):-
19 Nr 4 130 520
Supply slider for lift pumps and submersible on the pull
platform
Sub Total USD. 103,080.00

Provide all required materials & equipment and work on


construct warehouse by dimensions ( 5 x 7) m height M2 35 850 29,750
3.5 m as below;
Site preparation: -

Provide all required materials & tools & equipment and


1 staff then start excavation work with depth (50 Cm)

and transport it out of work location with compact the


natural ground with all the required works and as per
instruction of the supervising engineer.
Sub-base backfilling: -

Provide all required materials & tools & equipment and


staff then start with install material type (B) for the site
2 ground till achieve the required level and the works must
be done by layers not exceed (20 cm) with watering and
compacting to achieve 95% MMD and include spread
chlordane anti-termite. All must be done as per technical
specification and instruction of supervising engineer.

Normal concrete works: -


Provide all required materials & tools & equipment and
staff then start with pouring normal concrete by mix ratio
(4:2:1) except blinding concrete mix ratio (6:3:1) use
sulphate resistance cement with all the works under the
moisture level. The price includes formworks, bitumen
asphalt number 30/20 for all concrete slabs which
connect directly with the earth. all the works must be
done by instruct of supervising engineer.
3

A- Blinding concrete for bases thickness 10 cm the


same dimension of the foundation

B- Pouring concrete above the slab walls (thickness 10


cm)

C- Moisture-proof concrete thickness (10 cm) mix with


specific anti-wet materials all as per instruction of
supervising engineer.
Reinforcement concrete works: -

Provide all required materials & tools & equipment and


staff then start with pouring reinforced concrete by mix
ratio (3:1.5:1) use anti salt cement from (Iraq, Iran,
Pakistan) the price include reinforce bars from (Iran,
Turkey, Ukraine), also formworks and bitumen asphalt
number 30/20 from (Iraq, UAE, Germany, Bahrain). For
all the slabs which connect directly to the earth with
curing works. All the works must be done as per
drawings and the instruction of supervising engineers as
below: -

4 - Foundation with dimensions, width (0.7) M and


thickness (0.4) M use sulphate resistance cement
(C35).

- For slabs with thickness (20 cm), for the beams


above the doors and windows dimensions (25 x 30)
cm and for the fallen beams from the slabs on the
walls dimensions (25 x 50) cm the thickness must be
(20 cm) from the interior side of the slabs with
construct Cantilever from one side width (60) cm for
the slab, use (C30).

Bricks work: -

Provide all required materials & tools & equipment and


staff then start with bricks works from (Iraq, Iran), all the
works must be done as per drawings and the instruct of
supervising engineers as below: -
A- All the bricks work under the moisture level must be
done by sand and sulphate resistance cement with mix
ratio (3:1), cement from (Iraq, Iran, Pakistan). All the
materials must be inspected and passed from laboratory
test. Start gradually with (43 Cm) height (17 cm), (36
cm) height (17 cm) and (24 cm) till reach the required
level. The price includes plastering from both side with
5 sulphate resistance cement mortar with mix ratio (3:1)
with bitumen coat for both side by asphalt number 30/20
from (Iraq, UAE, Bahrain, Germany)

B- Provide all required materials & tools & equipment


and staff then start with bricks works thickness (24 cm).
use normal cement and sand with ratio (3:1). Cement
from (Iraq, Iran, Pakistan). All the materials must be
inspected and passed from laboratory test. All the above
details from the work above the moisture level for
loading (walls and partition) with height (3.25). The price
include installation the frames of (doors & windows) and
all the require holes in the walls in any type and
anywhere as per the drawings and instruction from
supervising engineers.

Cement plaster works: -

Provide all required materials & tools & equipment and


staff then start with cleaning the walls and ceiling from
dust and other things then start spread cement mix
before plastering from both side (interior, exterior) then
start plastering works for both side. Cement from (Iraq,
Iran, Pakistan) as below details: -

A- Indoor plastering thickness (2 cm) with mix ratio


(3:1). Start with vertical levelling bar and must not
6 exceed (1) M between one to other and the final surface
must be level and smoothly and all the corner must be
levelled and sharp. The price includes plastering the
ceiling with putty powder. All the works must be done as
per instruction of the supervisor engineer.

B- Outdoor plastering thickness (2 cm) with mix ratio


(3:1)). Start with vertical levelling bar and must not
exceed (1) M between one to other and the final surface
must be level and smoothly and all the corner must be
levelled and sharp. All the works must be done as per
instruct of supervising engineer.

Putty powder works: -

7
7 The final interior layer of walls and ceiling plaster with
putty powder. Must be all the walls and ceiling smoothly
and cleanly.
Indoor paint works: -

Provide all required materials & tools & equipment and


8 staff then start with painting the interior walls with one
primer coat and two finishing painting layers from plastic
paint (UAE, Jorden, Kuwait). And as per the colour that
will be select from the supervising engineer.

Outdoor paints work: -

Provide all required materials & tools & equipment and


staff then start removing all the dust and other things
from the walls. Painting the exterior walls and roof walls
9 as per the highlight location on the drawings and the
instruct by supervising engineer as the below: -
Use mix from white cement and sand. Mix ratio (1:1) by
use the special machine for spread the paint. And as
per the colour that will be select from the supervising
engineer.
Granite flooring: -

Provide all required materials & tools & equipment, staff


install the ground by granite from (Turkey, China). All
10 the materials must be inspected and passed from
laboratory test. Granite thickness (2 cm) with cement
and sand mortar. And then must be clean the paving by
special materials and as per specification and instructs
of supervising engineer.
Skirting: -

Provide all required materials & tools & equipment and


11 staff then start with skirting the walls by height (10 cm)
porcelain or ceramic from (India, Turkey, China high
quality, Spanish) with white cement mortar and all the
other required works.
Roofing: -

Provide all required materials & tools & equipment and


staff then start with roofing the concrete slabs as per
drawings and the instruction from the supervising
engineer as below: -

- Clean the area from dust or any debris.


- Lay two layers from bitumen coat asphalt
number 30/20 from (Iraq, Iran, UAE, Bahrain). All the
materials must be inspected and passed from
laboratory test. With one layer of bitumen roll from
(Kuwait, UAE, Bahrain).

- Lay two layers of bitumen rolls each layer in


different direction from (UAE, Bahrain) must be
checked by the supervising engineer. Use the
12 asphalt coat in overlap area between each layer.
The overlap must not less than 15 cm).

- Lay the clean soil layer thickness (10 cm) with


levelling the slope and compacting it.

- Lay one layer of clean sand thickness (5 cm).

- Paving with concrete tiles size (80 x 80 x 4 ) cm


from ( Iraq ) with doing all the require works such as
levelling longitudinal and fill the joints by roof mastic
that must be select from the supervising engineer
and use pre-cast corner for the angle and also must
use heat for all the joints. All the materials must be
inspected and passed from laboratory test.

Note:- only the horizontal areas are calculated in the


final calculation.
Drain pipes: -

Provide all required materials & tools & equipment and


staff then start with install drain pipes from (UPVC)
13 diameter (4) inch with all the required accessories for fix
the head and the bottom end. All works must be done
as per drawings and instruction from supervising
engineer.
The same elevation of the roof.
Iron window: -
Provide all required materials & tools & equipment and
staff then start with manufacture and installation of the
windows and vacuums from iron frame from iron size 4’’
and thickness (4 mm) with all the require such as
window handles, locks, butt hinge, iron frames (exterior,
interior), glass thickness (4 mm) with install anti-insect
mesh with its wooden frame painted by special paint.
The price includes manufacture and installation of the
14 window iron shield as per the drawing include painting
three layers above two layers of anti-rust paint. All the
works must be done as per the work specification and
the instruction from the supervising engineer as below: -

A- Windows dimensions (1.5 x 1.5) M.

B- Vacuum dimensions (0.5 x 0.5) M .

Note: - All the windows above must be sealed and


approved from the supervisor engineer.
Iron door: -

Provide all required materials & tools & equipment and


staff then start with manufacture and install iron door
with all the accessories such as handles, locks, butt
hinge, exterior frame size 4’’ thickness not less than 4
mm, interior frame from square iron size 1.5’’ thickness
15
(2 mm). And cover from both side by plate iron size 1
mm. The price includes painting three layers above two
layers of anti-rust paint and fix the welding area by fibre
iron paste. All the works must be done as per the work
specification and the instruction from the supervisor
engineer as below: -
- Door dimension (2.10 x 2) M. For room.
Electrical works: -

Provide all required materials & tools & equipment and


staff then start with extend and install and test all the
following switches (lightings, air vacuum, fans). The
price includes all the plug switch. The materials must be
from (America, Jorden, Europe). And cables from
(Egypt, Jorden, Kuwait, Sweden) size 2.5 mm 2 for
source and 1.5 mm2 single for the circle inside plastic
pipes diameter 25 mm 2 inside the walls as the below: -
- Provide all required materials & tools &
equipment and work on install main control panel
contain main circuit breaker (100)A three phase,
single poles (25)A (Qty.4), single poles (10)A (Qty.4),
single poles (40)A (Qty.2) and single poles (32)A
(Qty.4. The price include supply and extend cable
size (6 x 4 mm) from the main panel to the
management room.

- Provide all required materials & tools &


equipment and work on install electrical cables with
light holder LED (50)W with light lamp, must be high
quality (Qty.8).

- Provide all required materials & tools &


equipment and work on install electrical cables with
16
exterior light holder must be atmospheric resistant
with glass cover with high quality lamp (Qty.8).

- Supply & install & test socket switch (13) A from


(eastern Europe) with install electrical cables size (4
mm2) from the distribution panel to each room. And
for each plug switch cables size (2.5 mm 2) (Qty.6) All
works must be done as per the specification and the
supervisor engineer instruction.

- Supply & install & test socket switch (15) A from


(eastern Europe) with install electrical cables size (4
mm2) (Qty.6). All works must be done as per the
stander specification and the supervisor engineer
instruction.

- Provide all required materials & tools &


equipment and work on install and extend electrical
cables with ceiling fan and the organizer from (Egypt,
India, Korea, Europe) (Qty.2).

- Provide all required materials & tools &


equipment and work on install and extend electrical
cables with air vacuum size 12’’ must be high quality
with all the require works and as per the instruction
on supervisor engineer.
29,750
Grand Total USD 132,830.0