Governance
Legal Compliance
Industry Norm :
To implement a management system that ensures compliance with all national legal
requirements, including national obligations under international law.
Partially Meets
We are fully compliant with all national legal requirements.
Fully Meets
We are fully compliant with all national legal requirements and with international
conventions and law where these are required nationally.
Business Integrity
Industry Norm :
To implement a management system that prohibits and effectively prevents bribery
(including facilitation payments), corruption and anti-competitive behavior.
Partially Meets
We have begun implementation of a management system or process to prevent bribery
(including facilitation payments), corruption and anti-competitive behavior, but it is
incomplete and/or not (yet) fully implemented.
Fully Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 1/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Exceeds
1. Formally participate in a national or international recognized initiative for the
combatting of bribery, corruption or anti-competitive behavior.
2. Comply with guidelines of an international convention or framework on the prevention
of bribery, corruption or anti-competitive behavior.
3. Disclose payments to national governments and significant business
partners/operations in countries considered to be at high risk of corruption, bribery or
anti-competitive behavior.
Stakeholder Engagement
Industry Norm :
To carry out stakeholder mapping, and to implement an engagement plan, and to
establish a grievance mechanism.
Partially Meets
We have begun to develop and maintain a stakeholder map and engagement plan, and
to establish a grievance mechanism, but it is incomplete and/or not (yet) fully
implemented.
Fully Meets
We have developed a documented stakeholder map, engagement plan and established
grievance mechanism, which are being fully implemented.
Exceeds
1. Maintenance of a mechanism to have continually informed consultation and
participation of stakeholders in key decisions and activities throughout the project
lifecycle.
2. Establishment of a formal stakeholder committee/panel (that includes local, national
and international representatives) that meets at least annually to review the
environmental, social and governance performance of the site / facility, and which
publishes a report of their findings and recommendations for improvements at the site /
facility.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 2/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Business Relationships
Industry Norm :
To promote responsible business practices with significant business partners, including
suppliers.
Partially Meets
We have begun to communicate with and/or directly engage some business partners to
promote responsible business practices, but we do not currently communicate with
and/or engage all our significant business partners.
Fully Meets
We communicate with and/or directly engage all our significant business partners to
promote responsible business practices.
Exceeds
1. Implementation of a comprehensive business-partner engagement policy/process
that meets prevailing industry best practices.
2. We monitor sustainability performance of our business partners on a regular basis.
Industry Norm :
To implement a management system that prevents the employment of children under
the age of 15, prevents the worst forms of child labor, and prevents the exposure of
employees under the age of 18 to hazardous work in line with ILO Conventions No. 138
and No. 182.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 3/19
8/5/2020 RBA - Risk Readiness Assessment Tool
ensure against the employment of children under the age of 15 and the exposure of
employees under 18 to hazardous work.
Partially Meets
We have begun to develop policies, procedures and practices (a management system)
that ensure against the employment of children under the age of 15 and the exposure of
employees under 18 to hazardous work, but implementation has not started or is
incomplete.
Fully Meets
We have in place policies, procedures and practices (a management system) that ensure
against the employment of children under the age of 15 and to the exposure of
employees under 18 to hazardous work.
Exceeds
1. Active influencing of contractors, consultants and suppliers to apply the standards in
ILO Conventions 138 and 182 at their operations.
2. Active support for (especially 'at risk') children in zone of influence.
Forced Labor
Industry Norm :
To implement a management system that prevents the use of any forms of forced labor
and participation in acts of human trafficking in line with ILO Conventions No. 29 and
No. 105.
Partially Meets
We have begun to develop policies, procedures and practices (a management system)
that ensure against the use of any forms of forced labor and against participation in
acts of human trafficking, but implementation has not started or is incomplete.
Fully Meets
We have in place policies, procedures and practices (a management system) that
assures we do not use any forms of forced labor or participate in the acts of human
trafficking.
Exceeds
1. Active influencing of contractors, consultants and suppliers to apply the standards in
ILO Conventions 29 and 105 at their operations.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 4/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Industry Norm :
To respect employees’ rights to freedom of association and to collective bargaining in
line with ILO Conventions No. 87 and No. 98, participate in collective bargaining
processes in good faith and not obstruct alternative means of association where there
are legal restrictions.
Partially Meets
We have begun to develop policies, procedures and practices (a management system) to
respect employee rights to freedom of association and collective bargaining, but
implementation has not started or is incomplete.
Fully Meets
We have in place policies, procedures and practices (a management system) that ensure
we respect employee rights to freedom of association and to collective bargaining.
Where national law restricts workers’ organizations, we do not restrict workers from
developing alternative mechanisms.
Exceeds
1. Active influencing of contractors, consultants and suppliers to apply the standards in
ILO Conventions 87 and 98 at their operations.
Industry Norm :
To prevent and address all forms of harassment and discrimination in the workplace in
line with ILO Conventions No. 100 and No. 111.
Partially Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 5/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Fully Meets
We have in place policies, procedures and practices (a management system) that ensure
we prevent discrimination in all aspects of our employment practices including
recruitment, hiring, compensation, benefits, work assignments, access to training,
advancement, discipline, termination or retirement.
Exceeds
1. Active influencing of contractors, consultants and suppliers to apply the standards in
ILO Conventions 100 and 111 at their operations.
Gender Equality
Industry Norm :
To continually assess and monitor progress to ensure the implementation of a policy on
gender equality in the workplace.
Partially Meets
We have begun to develop policies, procedures and practices (a management system)
on gender equality, but implementation has not started or is incomplete.
Fully Meets
We have in place public policies, procedures and practices (a management system) on
gender equality and continually monitor our progress on its implementation to address
gender inequality in the workplace.
Exceeds
1. Set and met targets for female employment at all levels of the organization and equal
pay; positive progression towards the target is demonstrated.
2. Female positions in senior and line management exceed industry average.
Working Hours
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 6/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Industry Norm :
To keep employees' total regular and overtime working hours to 60 hours per week
Partially Meets
We have begun developing policies, procedures and practices (management systems) to
keep employees' regular and overtime working hours within legally required limits / not
more than eight hours in the day and forty-eight hours in the week, but implementation
has not started or is incomplete.
Fully Meets
We have in place policies, procedures and practices (a management system) to keep
employees' regular and overtime working hours within legally required limits / not more
than eight hours in the day and forty-eight hours in the week.
Exceeds
1. Active influencing of contractors, consultants and suppliers to apply the standards in
ILO Convention 1 at their operations.
Remuneration
Industry Norm :
To pay wages that equal or exceed the national minimum wage, the appropriate industry
wage (if higher), or a living wage.
Partially Meets
We have begun implementing policies, procedures and practices (a management
system) to pay employees wages that equal or exceed national minimum wage or the
appropriate prevailing industry wage, but implementation has not started or is
incomplete.
Fully Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 7/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Exceeds
1. Active influencing of contractors, consultants and suppliers to pay wages that equal
or exceed national minimum wage or the appropriate prevailing industry wage,
whichever is higher to employees working at their operations.
2. In cooperation with employees, the development of a mechanism for determining and
achieving payment of living wages for employees.
Industry Norm :
To implement an occupational health and safety management system that is in line with
internationally accepted best practice frameworks (e.g. OHSAS 18001 or ISO 45001).
Partially Meets
We have begun to align our polices, procedures and practices (a management system)
with occupational, health and safety international convention, standard or guidance
framework, but implementation has not started or is incomplete.
Fully Meets
We conform with a recognized occupational, health and safety international convention,
standard or guidance framework.
Exceeds
1. Requirement for and monitoring of significant service providers and suppliers to
conform with a recognized international convention, standards or guidance frameworks
on occupational health and safety.
Industry Norm :
To establish and implement a grievance mechanism accessible to all employees.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 8/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Partially Meets
Fully Meets
We have implemented and maintain a grievance mechanism developed in consultation
with employees.
Environment
Environmental Risk Management
Industry Norm :
To implement an environmental management system (EMS) functionally equivalent to
an internationally recognized EMS standard (e.g. ISO 14001).
Partially Meets
We have begun to develop an environmental management system but implementation
has not yet started or is incomplete.
Fully Meets
We have fully implemented and maintain an environmental management system that
meets the requirements of, or is functionally equivalent to, an internationally recognized
EMS standard.
Industry Norm :
To quantify, establish reduction targets for and disclose CO2 equivalent emissions in
line with established international reporting protocols (e.g. IPCC or GHG Protocol).
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 9/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Partially Meets
We have made a public and documented commitment to quantify and disclose (at least
Scope 1) our CO2-e emissions, but implementation has not yet started or is incomplete.
Fully Meets
We have published total (at least Scope 1) CO2-e emissions for the site / facility.
Exceeds
1. Absolute target set that requires a reduction in total CO2-e emissions in a future year
when compared to a base year.
2. Residual GHG emissions that have not been avoided are fully offset in Clean
Development Mechanism (CDM) or Reducing Emissions from Deforestation and Forest
Degradation (REDD+) projects, resulting in no net emissions of GHGs or a net positive
impact (if the offset exceeds the residual GHG emissions)
Energy Consumption
Industry Norm :
To implement and quantify energy efficiency improvements and increased use of
renewable energy to reduce total energy consumption and/or energy intensity.
Partially Meets
We have publicly committed to quantify our energy efficiency and consumption and to
put in place programs to improve efficiency and reduce consumption, but
implementation has not yet started or is incomplete.
Fully Meets
We have in place programs to reduce energy consumption and improve energy
efficiency, and we publish, at least annually, quantitative performance data on energy
efficiency and energy consumption.
Industry Norm :
To conduct a comprehensive assessment of water-use impacts and risks in
collaboration with relevant stakeholders and to implement measures to ensure that
water consumption does not restrict availability/access for other water users or reduce
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 10/19
8/5/2020 RBA - Risk Readiness Assessment Tool
the range and populations of fauna and flora in the catchment area of the site / facility.
Partially Meets
We have begun to develop a water management system to minimize impacts on other
water users and on fauna and flora in the catchment area of our site /facility but
implementation has not yet started or is incomplete.
Fully Meets
We have implemented a water management system and / or other measures that
minimize consumption on other water users and on fauna and flora in the catchment
area of our site / facility
Exceeds
1. Absolute target set that requires for a year-by-year reduction in (a) total freshwater
abstracted and (b) fresh water consumed.
Waste Management
Industry Norm :
To implement a risk-based waste management system that includes a commitment to
the ‘waste hierarchy’ and is applicable to all waste types (hazardous, non-hazardous and
inert).
Partially Meets
We have begun to develop a waste management system that includes a commitment to
the ‘waste hierarchy’ and is applicable to all waste types (hazardous, non-hazardous and
inert), but implementation has not yet started or is incomplete.
Fully Meets
We have implemented a waste management system that includes a commitment to the
‘waste hierarchy’ and is applicable to all waste types (hazardous, non-hazardous and
inert).
Exceeds
1. Absolute target set that requires for a year-by-year reduction in total hazardous waste
generated.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 11/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Pollution
Industry Norm :
To implement the mitigation hierarchy to avoid, minimize, reduce and compensate for
the adverse impacts of pollution on human health and the environment.
Partially Meets
We have a policy that follows the mitigation hierarchy to avoid, minimize, reduce and
compensate for the impact of pollution on human health and the environment, but
implementation has not yet started or is incomplete.
Fully Meets
We have implemented a policy that follows the mitigation hierarchy to avoid, minimize,
reduce and compensate for the impact of pollution on human health and the
environment.
Exceeds
1. Target set and met for year-by-year reduction in total pollutant releases to the
environment (air, water and land).
2. Material releases of pollutants to the environment (air, water and land) have been
eliminated.
Industry Norm :
To implement the mitigation hierarchy to avoid, minimize, reduce and compensate for
adverse impacts on biodiversity; to avoid adverse impacts to Critical Habitats or
Endangered Species; and to prevent operational activities in World Heritage sites or in
designated protected areas unless specifically and legally permitted.
Partially Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 12/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Fully Meets
We actively use the mitigation hierarchy for the management of our impact on
biodiversity; and, we have published a statement, to confirm that a) our activities are not
causally related to adverse impacts to Critical Habitat or Endangered Species, and b) our
operation is not illegally operating in a protected area or its buffer zone.
Exceeds
1. A measurable outcome of no net loss of biodiversity at the operation.
2. A measurable outcome of a net gain of biodiversity at the operation.
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Community
Community Health and Safety
Industry Norm :
To implement a management system to monitor, avoid, minimize, reduce and
compensate for adverse impacts on community health and safety.
Partially Meets
We have begun to develop a policy, procedures and practices (a management system) to
avoid, minimize, reduce and compensate for adverse project-related impacts on
community health and safety, but implementation has not yet started or is incomplete.
Fully Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 13/19
8/5/2020 RBA - Risk Readiness Assessment Tool
We have implemented a policy to avoid, minimize, reduce and compensate for adverse
project-related impacts on community health and safety.
Community Development
Industry Norm :
To identify community needs in consultation with affected communities, develop a plan,
and commit resources to support community development.
Partially Meets
We have assessed the needs of the community around our operation and have
developed a plan to make contributions to or support development in affected
communities, but its implementation has not started or is incomplete.
Fully Meets
We have completed a community needs assessment (including provision of training to
give local people access to project-related jobs), and we have developed and are
implementing a plan to make contributions to or support community development,
including strengthening local economic linkages.
Exceeds
1. A formal mechanism for sharing project-related financial benefits to community
development programmes.
2. Community has formal ownership/share of control of the project.
Industry Norm :
To engage artisanal and small-scale miners (ASM) and facilitate their formalization and
improvement of their environmental and social practices, where there are known to be
legitimate ASM in the sphere of influence of the site / facility.
Partially Meets
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 14/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Where there are known to be legitimate ASM in the sphere of influence of the site /
facility, we are committed to engage ASM on formalization and improvement of their
environmental and social practices, but the implementation of our program has not
started.
Fully Meets
Where there are known to be legitimate ASM in the sphere of influence of the site /
facility, we engage with ASM on formalization and to improve their environmental and
social practices at their operations.
Exceeds
1. Target set and met for annual increase in ratio of licensed to unlicensed (or equivalent
measure of 'formalization') ASM in site's / facility's area of influence.
2. Agreement with formalized ASM to operate within site's concession in areas that
cannot economically be mined using industrial mining technologies and in accordance
with appropriate standards, or a sourcing agreement from immediate areas outside the
mine concession, and which promote continual improvement of operating practices.
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Industry Norm :
To implement the UN Guiding Principles on Business and Human Rights including
human rights due diligence.
Partially Meets
We have begun to implement the UN Guiding Principles on Business and Human Rights,
but implementation is incomplete.
Fully Meets
We have made a public and documented commitment to implement the UN Guiding
Principles on Business and Human Rights, and we publish, at least annually, our
f i t th it t
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 15/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Industry Norm :
To implement a management system to respect the rights of Indigenous People,
including free, prior and informed consent (FPIC); avoid adverse impacts on Indigenous
Peoples' lands, livelihoods, resources, and cultural heritage; and develop and implement
an Indigenous Peoples' engagement plan.
Partially Meets
Where there are known to be Indigenous Peoples communities or groups in the sphere
of influence of our site / facility, we do commit to achieve FPIC with Indigenous Peoples
and to develop a specific Indigenous Peoples engagement/development plan or
strategy, but we have not started to implement the commitment or implementation is
incomplete.
Fully Meets
Where there are known to be Indigenous Peoples communities or groups in the sphere
of influence of our site / facility, we have continue to have FPIC of the Indigenous
Peoples communities or groups and we have and are implementing a specific
Indigenous People's engagement/development plan
Exceeds
1. Convening/facilitation of the creation of an Indigenous Peoples' consultation
committee comprised of organizations or individuals that legitimately represent
Indigenous Peoples; proceedings and recommendations from the committee, and the
operator's responses to them, are made publicly available.
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Industry Norm :
Where land acquisition or resettlement is necessary: to implement a policy to explore all
viable alternative project designs to avoid and/or minimize land acquisition and physical
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 16/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Partially Meets
We have a policy to avoid and/or minimize land acquisition and resettlement (including
the absence of a resettlement action plan), but we have not started to implement the
policy or it is incomplete.
Fully Meets
We have a fully implemented policy to avoid and/or minimize land acquisition and
resettlement, and our projects’ design has been optimized to minimize land acquisition
and avoid resettlement and a resettlement action plan has been developed to address
residual impacts.
Exceeds
1. Project design adapted so that there is no resettlement of Indigenous Peoples.
2. Project design adapted so that there is no resettlement of communities whether
Indigenous Peoples’ communities or not.
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Cultural Heritage
Industry Norm :
To identify cultural heritage sites and to establish a process based on consultation with
stakeholders to avoid, minimize, reduce and compensate for adverse impacts on cultural
heritage.
Partially Meets
We have committed to a process to manage risks to culture and heritage based on
consultation with stakeholders, but we have not started to implement the policy or it is
incomplete.
Fully Meets
We have a fully implemented a process to manage risks to culture and heritage
i t d ith ti iti th t i b d lt ti ith t k h ld
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 17/19
8/5/2020 RBA - Risk Readiness Assessment Tool
associated with our activities that is based on consultation with our stakeholders.
Exceeds
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Industry Norm :
To implement the OECD Due Diligence Guidance for Responsible Supply Chains of
Minerals from Conflict-Affected and High-Risk Areas.
Partially Meets
We have committed to implement a policy and to complete a due diligence that
conforms with the OECD DDG, but we have not started to implement the Principles or
implementation is incomplete.
Fully Meets
We have a fully implemented a policy and completed a due diligence that conforms with
the OECD DDG.
Exceeds
1. Published OECD conformance report/audit/plan on website.
2. Participation in an initiative to create or support conflict-free supply chains.
Not Applicable
Not Applicable. Please explain in the comment box why the norm is not applicable to
your site / facility.
Industry Norm :
Report annually on environmental, social and governance performance in line with
( )
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 18/19
8/5/2020 RBA - Risk Readiness Assessment Tool
Partially Meets
We have committed to reporting on our environmental, social and governance
performance, and to supporting the implementation of and reporting in accordance with
the EITI (where applicable), but we have not started to implement the commitments or
implementation is incomplete.
Fully Meets
We have a fully implemented a policy and completed a due diligence that conforms with
the OECD DDG.
Exceeds
1. Annual report on environmental, social and governance performance is assured.
2. Participation in initiatives to promote EITI implementation in non-member countries.
3. Voluntary reporting in accordance with EITI in non-member countries.
https://app.riskreadiness.org/Document/DownloadRraQuestions?type=SME 19/19