Anggaran Pekerjaan Instalasi Di SMK 8 Muara Bungo

No Material Banyaknya Harga


1 Lampu 12 set Rp 60.000,00
2 Stop Kontak Tiga Phase 2 set Rp 600.000,00
3 Stop Kontak Satu phase 3 set Rp 90.000,00
4 Panel Komplit 3 Phase 1 set Rp 600.000,00
5 ohm Saklar 1 set Rp 700.000,00
6 Kabel LVTC 4x16 20 m Rp 380.000,00
7 Kabel 4x4 mm 25 m Rp 575.000,00
8 Kabel NYM 1,5 x 2 1 rol Rp 480.000,00
9 Kabel NYM 2,5 x 2 1/2 rol Rp 300.000,00
10 Ties Kabel 1 pack Rp 20.000,00
11 Isolasi 1 pack Rp 20.000,00
12 Mangkok Saklar 18 set Rp 72.000,00
13 Tidus 10 set Rp 40.000,00
14 Slang Spriral 10 m Rp 60.000,00
15 Pipa Paralon 10 batang Rp 80.000,00
16 MCB 3 Phase 1 set Rp 315.000,00
17 MCB 1 Phase 2 set Rp 140.000,00
18 Jasa 1 lot Rp 750.000,00
Total Rp 5.282.000,00

Muara Bungo, 20 Oktober 2023