Professional Documents
Culture Documents
CE35A-FRANCISCO REVISED fs1
CE35A-FRANCISCO REVISED fs1
A A
FIRE EXIT
3.40
SD SD 3.40
EL
B B
1.60 1.60
C SD EL C
1.90 1.90
SD
EL
D D
1.50 1.50
E E
FIRE EXIT
EL EMERGENCY LIGHT
SEAL Drawings and Specifications duly signed, PROJECT TITLE: APPROVED BY: SHEET CONTENT SHEET NO.
KENAN ACE E. FRANCISCO 3A stamped or sealed, as instruments of service,
FS
are the intellectual properties and documents of
the architect, whether the object for which they
STUDENT are made is executed or not. It shall be unlawful