Overlapping
Overlapping
10
16 19 23
CURE
LT = 3
FORM STRIP
CAST CURE WALL
WALL
6 3 4
10-16 19-23
OVERLAPPING MODEL
ESDJ = EFDI + LT
LFDI = LSDJ - LT
9
THE CRITICAL PATH METHOD
HAND-OUT MAGISTER TEKNIK SIPIL
START TO START ( STS )
10 12 18 26
DEMOLISH
FOUNDATIONS
LT=2
10 12 12 18
START CONTINUE
DEMOLISH DEMOLISH
2 6
12 26
FOUNDATIONS
14
10 18 12 26
LTI=2
DEMOLISH FOUNDATIONS
8 14
OVERLAPPING MODEL
10
THE CRITICAL PATH METHOD
HAND-OUT MAGISTER TEKNIK SIPIL
FINISH TO FINISH (FTF)
10 12 14 17
REPAIR WALLS
LT=3
10 14 14 17
REPAIR FINISH
WALLS WALL
CABINETS
4
3
12 14
START
WALL
CABINETS
10 14 12 17
LT=3 INSTALL
REPAIR
WALLS WALL
CABINETS
4
5
OVERLAPPING MODEL
11
THE CRITICAL PATH METHOD
HAND-OUT MAGISTER TEKNIK SIPIL
START TO FINISH ( STF )
21 22 27 29 33
CONTROL WIRING
LT=5
22 27 27 33
START FINISH
CONTROL CONTROL
WIRING WIRING
21 27 27 29
START FINISH
ASSEMB & ASSEMB &
HOOK UP HOOK UP
TRANSFOR TRANSFOR
21 29
22 33
CONTROL LTI=5 LTJ=2 ASSEMBLE
WIRING & HOOK UP
TRANSFOR
11 8
OVERLAPPING MODEL
10 14 20 26 28
START
PAVING
FINISH
PAVING
START
STRIPING
LT=4
FINISH
STRIPING
LT
DISC.
6 2
14 26
FINISH
PAVING
12
10 14 26 28
START FINISH
PAVING STRIPING
4 2
14 20
START
STRIPING
SINGLE RELATIONSHIP
MODEL
20 FTF 28
10 26 14 STS 22
LT=4
PAVE STRIPE
PARKING PARKING
16 LT=2 8
OVERLAPPING MODEL
13
THE CRITICAL PATH METHOD
HAND-OUT MAGISTER TEKNIK SIPIL
14
THE CRITICAL PATH METHOD
HAND-OUT MAGISTER TEKNIK SIPIL