G.L 33.

00
I.L IN 1 (31.82)
I.L IN 2 ()
I.L IN 3 ()
I.L OUT 1 (31.80)
LEGENDS:
SOIl PIPE (SP)
WASTE PIPE (WP)
IC 1.00*1.00 ‫اﻟﻣﻧﺎﺳﯾب ﻟﯾﺳت ﻛﻣﺎ‬
15000

VENT PIPE (VP)


‫ﻓﻰ اﻟواﻗﻊ‬ RAIN PIPE (RP)
FORCE MAIN PIPE (FP)
CONDENSATE PIPE (CDP)
‫ﺗوﺿﯾﺢ اﻟﻣﻧﺎﺳﯾب ﻟﻠواﻗﻊ‬ FLOOR DRAIN (FD)
‫ﺗﻣدﯾدات اﻟﺳﺑﺎﻛﺔ ﻏﯾر ﻣوﺿﺣﺔ‬ AHUD FUNNEL DRAIN (FFD)
G.L 32.91
ROOF DRAIN (RD)

20000
I.L IN 1 (32.10)
I.L IN 2 (32.43) FLOOR CLEAN OUT
1 2 3 4 5 5A 6 7 8 9 G.L 32.84 10 11 12 I.L IN 3 (32.53) 13 14 15 16 17 18 19 20 21 22 23
12201 12201 12201 12201 12201 12201 12201 12201 12201 12201
I.L IN 1 (32.20)
12201 12201 12201 I.L OUT 1 (32.08) 12201 12201 12201 12201 12201 12201 12201 12201 12201 12201 12201 CEILING CLEAN OUT (CO)
I.L IN 2 () FREE DISCHARGE
I.L IN 1 ()
ROOF VENT CAP
‫ﺗوﺿﯾﺢ اﻟﻣﻧﺎﺳﯾب و ﺗﻣدﯾدات اﻟﻣواﺳﯾر‬
I.L OUT 1 (32.18)

‫اﻟﺧﺎﺻﺔ ﺑﺎﻟﺑدروم‬ EL. +36.67 EL. +36.35 EL. 33.04 ABBREVIATIONS:

1509
F.F.L F.F.L PAV. LVL
A 01
UP
A SS SOIL STACK
12201 02
12201
EL. -0.75 03
WS WASTE STACK
EL. -0.45 EL. -0.75 F.F.L STAIR EL. +2.75

STORE 12201 G 59
F.F.L

PAV. LVL PAV. LVL 18 17 717


1
12201G 61A 16

EL. +33.75
18
81 616
1
EL. -0.45 VS VENT STACK

UP
19 15 19
91 515
1
20 14
GROUND F.F.L 20
02 414
1 PAV. LVL RS RAIN STACK
B B

01

02

03

04

05
21 13 21
12

G.L 33.355
313
1
TOILET
1900.0000

22 12 22
22 212
1
12201 23 11 12201 G 57 23
32 111
1 12201 SP SOIL PIPE
UP
I.L IN 1 (32.72)

UP
24
42

EL. +1.96 UP
24 10
FIELD GROUPS MANAGER MEDICAL TEAM REPORTS & MEETING COMMUNICATIONS EQUIPMENT
010
1

01 02 01 02 03 04 05 25 09
12201G 51C 12201G 51D
CENSORSHIP STAFF 25
52 909
0
01

F.F.L 12 11 10 09 08 07 06 05 04 03 02 01 -08 08
12201G 51E 12201G 51F 12201G 51G -07
70-

-06
60-
808
0
02

03 I.L IN 2 (32.56) WP WASTE PIPE


-07 07 707
0
13

14 FOYER -06

-05
06

05
ENTRANCE WASH
-05
50-

-04
40-
606
0

505
0
I.L IN 1 () VP VENT PIPE
15
12201 G 62
STAIR EL. +0.00 12201 G 58 12201 G 56 -03
30-
I.L OUT 1 (32.54)

UP
404
0
16
12201 G 65 GROUND F.F.L EL. +0.30
-04 04
-02
20- 303
0 RP RAIN PIPE
C C
17 -03 03
-01
10- 202
0
18 F.F.L DN

12201 19
DN
-02
-01
02

01
STAIRUP
101
0

12201
FP FORCE MAIN PIPE
20
UP 12201 G 50
21
22 23 24 25 26 27 28 29 30 31 32 33
EL. +33.75 CORRIDOR EL. +0.00 I/W IN WALL
12201 G 51
GROUND F.F.L
D GROUND F.F.L LOBBY
12201 G 53
EL. +0.00 ADMINISTRATIVE COMMUNICATIONS
12201G 51H
D U/G UNDER GROUND
12201 COMMANDER'S ASSISTANT GROUND F.F.L 12201
AUDITORIUM HALL U/T UNDER TILE
12201G 51B
PROJECTION ROOM 12201 G 61 2263

12201 G 63
EL. -0.75 U/S UNDER SLAB
E EL. +0.30 EL. +0.30 F.F.L LOBBY PANTRY JANITOR
1198
E
ARCHIVE HIGH LEVEL
12201 F.F.L F.F.L 12201 H/L

22474
12201 G 52 12201 G 54 12201 G 55 12201 G 51

AFC ABOVE FALSE CEILING


F F
12201
EL. -0.45
12201 T/B TO BELOW
PAV. LVL
UP
V.I.P. ENTRANCE F/B FROM BELOW
12201 G 66
EL. +0.00 01 02 EL. +0.00 EL. +0.00 T/A TO ABOVE
RAMP DOWN GROUND F.F.L GROUND F.F.L GROUND F.F.L
G FOYER
12201 G 64 LOBBY HEURISTIC SIGNS PRESENTATION INTERNAL HADJ GROUP MANAGER EXTERNAL HADJ GROUP MANAGER
G F/A FROM ABOVE
12201 EL. +0.30 12201 G 60 12201G 51A 12201G 51M 12201G 51L 12201G 51K 12201G 51J 12201

UP
01 02 03

F.F.L EL. +0.00


GROUND F.F.L

H H
01 02 03 04 05

UP
G.L 33.75
12201 I.L IN 1 (32.52)
12201
I.L OUT 1 (32.35)
RAMP

01 02
J J

2387
12201 12201

6
EL. +0.00 CORRIDOR EL. +0.30
UP
GROUND F.F.L 12201 G 88 F.F.L

SWITCH EQUIPMENTS
N
K 12201 G 48 K SITE KEYPLAN W
12201 RAMP UP
12201 F
C100
F
C99
F
C98
F
C97
F
C96
F
C95
F
C94
F
C93
F
C92
F
C91
F
C90
F
C89
F
C88
F
C87
F
C86
F
C85
F
C84
F
C83
F
C82
F
C81
F
C80
F
C79
F
C78
F
C77
F
C76
F
C75
F
C74
F
C73
F
C72
F
C71
F
C70 C69
F F
C68
F
C67
F
C66 C65
F F
C64
F
C63
F
C62 C61
F F
C60
F
C59
F
C58
F
C57
F
C56
F
C55
F
C54
F
C53
F
C52
F
C51
F
C50
F
C49
F
C48
F
C47
F
C46
F
C45
F
C44
F
C43
F
C42
F
C41
F
C40
F
C39
F
C38 C37
F F
C36 C35
F
C34
F F
C33 C32
F
C31
F
C30
F
C29
F
C28
F
C27
F
C26
F
C25
F
C24
F
C23
F
C22
F F
C21 C20
F
C19
F F
C18 C17
F F
C16
F
C15
F
C14
F
C13 C12
F F
C11
F
C10
F
C9
F
C8 C7
F F
C6
F
C5
F
C4
F
C3
F
C2
F
C1

F
D1
F
D2
E

B94
F
D3

F
ELECTRICAL ROOM 1885
8 SEPTIC TANK

STORE

B93
F
E1
F
STORE

E2
F

B92
F
E3
F

B91
F
EL. -0.45 12201 G 96

E4
F
12201 G 08

B90
F
12201 G 00
B. (12212)

Mac

E5
F

B89
S

F
E6
F

B88
F
E7
F
‫ﻣراﺟﻌﺔ اﻟﻣﻧﺎﺳﯾب‬

B87
PAV. LVL ca

F
WAITING

E8
F
LABORATORY

B86
F
E9
F

B85
F
E10
12201 G 86

B84
F
E11
F

B83
F
12201 G 95
L

E12
F

B82
F
4865

E13
‫اﻟﻣﺣددة ﻋﻠﻰ اﻟﻣﺧطط‬

B81
F
E14
A. (12201)

B80
COMPUTER ROOM

F
E15
A01'

B79
F
059

G
D28 D28
D28

G 61A
D29
D10
D06 G 057

E16
G 051G

12201
G 051D

F
051C

G
G 065 G 062

B78
051F

G
G 058

F
051E

B.(12209)

G
G 056 D31 D31
D10 D31 D31 D31

D27
D31
G 050
G 103 D29
D24 D24

G 051
D35

G 053
G 051B

E17
F
UP
D27 D31 D31

B77
12201 G 87
D26
051H
ELEVATOR

G
G 052

F
G 066
NO.01 051I

G
054

G
G 061 055

G
D06* G 063

D21
D29

D31

E18
D31
D31

F
D10

B76
D31
G 051M

F
E19
F
D10

G 051L
064 G 060 G 051J

B75
B.12201

F
D10

G 051A G 051K

12201 EL. +0.30

E20
F
EL. +0.00

B74
5349

F
G 088

D29
G 048

D29

D05
1.5836 D35
D31
G 096
G 067

E21
ELEVATOR

1785
G 095
NO.03

F
2.6149
4.8710

B73
G 086
220

F
D31

087 102

G
G 046

D23
G 047

E22
F
G 093
G 068 D27 G 098
D31 D31

B72
092

G
G 090

F
539
D25

1.0596 D31 094

G
E23
D31 D31

F
D26
D28
G 043

B71
D28
ELEVATO

F.F.L
D31

F
D28 G 045
G 089 D28 NO.04
G 083
G 091 R
D31

GROUND F.F.L
G 044

084

G
OFFICE OFFICE
D05

ELEVATO
3314

NO.04
WAITING AREA

R
G 069

E24
D31 D31

B70
F
885
G 097

041

G
D31
042

G
G 082 081

G
D31
G 101
EL. +34.022
F.F.L

E25
D28 D05

F
036

G
D31 G 080

B69
D28 037

F
D28

D26
D31
D28 016 D28
ELEVATOR

G
NO.02

E26
EL. +34.198 D28

CORRIDOR
G 071

D29
D28 D27
D26

F.F.L

B68
866
G 003

F
G 078 D28
018

G
E27
12201 G 46 12201 G 47

F
12201G 102

B67
F
072 D25

G
G 021
017 D05 G 035 D06

G
077

G
1 823
D27 D35

015

G
D26

000
076

G
G 020 D05
D26
022

G
E28
F
D31
G 014

B66
D29
D31

F
G 075 G 019

A01''
G 034

1101
D31 11.5187

2736
D31
D11
G 074 D31

013

G
023

G
G 011
D31

E29
12201 G 98

B65
G 033

F
G 002
D01

5700
D22

EL. +0.30
G 010
G 024

E30
D01

F
D04
G 026
D31

B64
F
D31
009 D31

G
G 001

E31
G 032

F
D31

G 004

EL. +34.178

B63
D31

F
D01
F.F.L
G 025

D31

D01 012

G
005

G
G 031

E32
F
D31
D31
G 008
D31

B62
F
D29
G 027

D31

B.(12203)
006

G
D24
D31

D35
D31

12201 WASH
G 029

E33
F.F.L
EL. 100.000 EL. 100.000
G 030

F
GRD F.F.L. GRD F.F.L.

B61
G 007

F
G 028

000
D06

E34
F

B60
F
EL. 100.000

E35
3537

B59
F
HOLD

E36
FAX OPERATOR

F
12201 G 93

B58
F
+33.75

ENG. BLD.
E37
F

B57
F
E38
12201 G 92

B56
F
E39
‫ﺗﻌدﯾل ﻣﻛﺎن اﻟﺻﻔﺎﯾﺔ‬

F
12201 G 68

B55
F
UP

E40
F

B54
F
B.(12204)

E41
LOBBY

B53
4060

F
IC 1.00*1.00
B.(12206B)

4967

B52
F
B51
F
193
7
EL. +0.30

B50
12201 G 90

F
ENT. BLD.

B49
F
TOILET

B48
F.F.L

F
12208
1

B47
F
12208
DN

B46
F
12201 G 94
B.(12208B)

B45
F
B44
F
B43
F
CORRIDOR
B.(12205)

2961

B42
F
B.(12207B)

B41
F
E42
F
574
12201 G 89

B40
F
E43
F

B39
F
KITCHEN. BLD.
616

E44
F
CORRIDOR

B38
F
E45
F
1706

E46

B37
OFFICE CORRIDOR OFFICE

F
G.L (+33.11)

B36
F
E47
F

B35
F
I.L IN 1 (+32.53) 12201 G 83 DATA CENTER

E48
PANTRY

B34
1

F
304

E49
12201 G 45 12201 G 44 12201 G 43

F
113
I.L OUT1(+32.51)

300

B33
E50
F

F
B32
12201 G 84

F
E51
12201

B31
B. (12202)

F
12201 G 91

E52
F

B30
F
E53
F
452

B29
E54

F
F
EL. +0.30 1774
DN DN

EL. +0.00
UP UP

B28
F
282

E55
432

B27
F
369

E56
F

B26
0

F
E57
F
130
F.F.L GROUND F.F.L 204 586

E58

B25
F

F
B24
F
FHC FHC

RAMP

RAMP
E59
F
DN

EL.+34.35

B23
DN DN

453

F
‫ﺗرﺣﯾل اﻟﺧط ﻣن اﺳﻔل اﻟﻣﯾده‬
DN DN
TRENCH RAMP RAMP
ELECTRICAL

F.F.L

E60
F
DUCT ABOVE

B22
HD
ELECTICAL

F
E61
F
TRENCH
LOW CURRENT T O ABOVE OPEN
HD

B.(122013)

E62

B21
F

F
EL.+34.36
F.F.L

18
150
HD HD
UP

B20
F
19

E63
F

B19
F
OPEN TO

UP

20

E64
F
21

B18
F
DECORATIVE PARTITION
E65
F
LOW CURRENT

22
23

B17
E66
F

F
17
24
EL. +2.78

B16
F
16
25

E67
F

B15
F
15
26
STAIR
A02 12201 G 67

E68
F
14

B14
27

F
E69
F
13
28

12

B13
E70
29
F.F.L

F
F
RAMP UP

11
30

B12
F
I.T. ROOM 12201 G 97

10

E71
31

B11
F
09
32

E72
08

B10
33

F
1 2
12208 12208
B.(12207A)

12201

E73
F
07
06

E74
B.(12206A)

B9
F

F
12201 G 69 EL. +0.00

05

B8
F
04

E75
F

B7
DN

F
03

G9

I1
F
F
E76
02

B6
F
E77
F

G8
B.(12208A)

I2
F

F
01
OFFICE OFFICE

G7

I3
F
GROUND F.F.L

F
E78
H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 H12 H13 H14 H15 H16 H17 H18 H19 H20 H21 H22 H23 H24 H25 H26 H27 H28 H29 H30 H31 H32

B5
F

F
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

G6

I4
F

B4
F
E79
F

B3
F
I5
F
G5
F

I6
F
E80
12201 G 41 12201 G 42

F
UP

B2
F
E81

G4
F

I7
F
G3
UNDERGROUND

B1
F
E82
PUMP ROOM WATER TANK

G2

I8
F

F
CORRIDOR

G1
F1 F

I9
F

F
UP
F2

F3
F
A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A24 A25 A26 A27 A28 A29 A30 A31 A32 A33 A34 A35 A36 A37 A38 A39 A40 A41 A42 A43 A44 A45 A46 A47 A48 A49 A50
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

12201 G 82 B. (12210)
B. (12211)

TELEPHONE OPERATOR 02 N
12201 G 81 UP 12201
01 0
1464

‫اﻟﺻﻔﺎﯾﺎت ﻋﻠﻰ ﯾﻣﯾن اﻟﻛرﺳﻰ‬


150
744
CORRIDOR UP

RAMP
DRAWN BY :

505
‫ﻣ ﻧ ﺎ ﺳ ﯾ ب ﺧ ر و ج‬A03‫ﺗوﺿﯾﺢ‬

623
805
12201G 101
P

870
EL. +0.00 STAIR
GROUND F.F.L
1518
3226
EL. +1.95 12201 G 36 CHECKED BY :
EL. +2.78

1972
150 297 153
12201

884
‫ﻣ ط ر ط ﺑ ﻘ ﺎ‬12201
‫ﺻرف اﻟ‬

496
F.F.L
91

MANAGER ROOM 21
12 20
02 19
91 18
81 17
71 616
1 515
1 414
1 313
1
94

480
F.F.L PANTRY
12
21
APPROVED BY:

505
12201 G 80 222
2 11
11
1102 TOILET835 12201 G 39 LOBBY DRAWN BY :
site grading ‫ﻟ ﻠ ـ ـ‬
323
2 10
01

878
17
18
16
12201 G 40 12201 G 37 424
2 09
90
19 300
15
525
2 08
80
CHECKED BY :

530
20
14 626
2 07
70
21
13 500 727
2 06
60
APPROVED BY:
58

22
7

IMPORT & EXPORT TOILET 828


2 05
50
EL. -0.45

481
12

606

5295
5 23
29
12201 G 71 MAIN LOBBY
11
12201 G 16 LOBBY
929
2 04
40
DRAWN BY :

2705
3459
24 05 04 03 02 01
PAV. LVL

531
RAMP DN.

2925
10 030
3 03
30
533
12201 G 03 25
12201 G 38

5498
850
09 502 131
3 02
20
CHECKED BY :
27
09
27
26
08
07 514
232
3

333
3
01
10

UP
PU
Q APPROVED BY:
28
WASH 12201

850
TOILET 29
06

12201G 16*
12201
35
4
G 78 30
05
8 52
STORE LOBBY ENTRANCE DRAWN BY : AMIRA FAHMY
A04

1110
04
5 12201 G 18 12201 G 21 12201 G 35
EMPLOYEES OFFICES 58
8 31
03
129
4299
26-03-2023 ISSUED FOR APPROVAL CHECKED BY : OLA EL ARABI
‫رﺑط اﻟﺗﮭوﯾﺔ ﻣن ﺳﻘف‬
32
EL. +0.00 EL. +0.00
60

12201 12201 G 72 02
0

33 6419
01

STAIR GROUND F.F.L GROUND F.F.L UP APPROVED BY:

‫اﻟدور اﻻ رﺿﻰ‬
UP
BED ROOM

174
12201 G 17
HOLD

2822

08
12201 G 77

20
481

12201G 16**
5437 R DATE DESCRIPTION REVISION NAME

83
10
49
PANTRY

7
5039 8

42
R
1894
LOUNGE
19
30
2
1231 12201 G 15 619

985
12201 G 76 CORRIDOR 3966

228
12201

1495

680
700
12201 G 20

732
A04* TOILET
12201 12201 G 22

165
LOBBY 300

16
47
9
12201 G 14 ELECTRICAL ROOM OFFICE
12201 G 19 12201 G 34
LOBBY
12201 G 75

95
A05 48 MANAGER OFFICE
SECURITY OFFICES CORRIDOR 12201 G 23
12201 12201 G 74 12201 G 13
IC 1.00*1.00 MAIN ENTRANCE HALL
12201 G 02
MAIN ELECTRICAL ROOM
12201 G 11
EL. +0.00
GROUND F.F.L
EL. +0.00
A06 GROUND F.F.L
12201 868
5
G.L 33.75 OFFICE
12201 G 33
S
EL. -0.45 12465 I.L IN 1 (32.39) 12201
U.P.S ROOM
PAV. LVL 12201 G 10 I.L OUT 1 (32.35)
G.L (+33.20) OFFICE CORRIDOR
I.L IN 1 (+32.35) 12201 G 24 12201 G 26
I.L OUT1(+32.33)

AIR LOCK

19384
UP 12201 G 01
OFFICE
OFFICE 12201 G 32
12201 G 09
CORRIDOR
RA

12201 G 04
M
P

PRAYER HALL
12201 G 12
03
OFFICE
A07 EL. +0.00
02

01 12201 G 25
GROUND F.F.L WAITING
12201
EL
N

‫ﯾوﺟد ﻣﻛﯾف‬
TUN

12201 G 05
ICE
ERV

EL. -1.30
FS

‫ﺳﺑﻠﯾت ﯾﺣﺗﺎج‬
EL
EO

UNN

EL. -0.45 OFFICE PAV. LVL


LIN

T
ICE

A08 PAV. LVL 12201 G 31


V

‫ﺻرف‬
SER

12201
OF
UP

12201
E
LIN

LOBBY
12201 G 29
LOW CURRENT
12201 G 27 EL. +0.00 RAMP UP
OFFICE GROUND F.F.L
12201 G 06

OFFICE U
12201 G 30 12201
OFFICE EL. +3.92
A09

RAMP
12201 G 07 EL. +0.00
F.F.L
12201 RA
GROUND F.F.L
M UP
P 33

01

02
STAIR 32

31
Ge ner al Cont r a c t or
12201 G 28

UP
G.L (+33.16) G.L (+33.47)
03

04
30

29 V
I.L IN 1 (+32.19) I.L IN 1 (+32.21) 05

06
28

27
12201
I.L OUT1(+32.17) I.L OUT1(+32.19) 07 26 DN
RAMP

EL. -0.45 08 25

PAV. LVL
09 24
EL. +0.00
A10 10

11
23

22
GROUND F.F.L
12201 12
13 14 15 16 17 18 19 20 21

IC ‫ﺣ ﺟ م ا ﻟ ـ ـ‬ EL. -1.30
08

EL. +1.96 07

F.F.L 06 PAV. LVL


A11 1.00 * 1.00
05

04 W THREE PALM TREES TRADING GROUP CO.LTD.


12201 03

02
12201
01

UP
DISCIPLINE
A13 MECHANICAL
12201
A14 PACKAGE
12201 FACILITY

A12 A15
12201
12201 A16 220
DRAWING TITLE
ISSUED FOR CONSTRUCTION
1220
1 MAIN BUILDING - 12201
MASTER GROUND FLOOR PLAN (L/L) - DRAINAGE SYSTEM

DRAWN SCALE DRAWING NO.


1:100 @ A0
AMIRA FAHMY
122-D-C-12201-X-DR-103-00
CHECKED DATE 26-03-2023
OLA EL ARABI
A MASTER GROUND FLOOR PLAN (L/L) PART 3 0 5 10 CERTIFIED APPROVED BY: REF.NO. REV:
DR-103-00 1:100 APPROVED DWG: 01
SCALE 1:100 METERS