Acknowledgement

I want to express my gratitude to all those who gave me this opportunity to


complete this report. I want to thank the Department of Civil Engineering and
Training Department of the University Department, Rajasthan Technical
University, Kota, for giving me such a golden opportunity to participate in
Survey Camp – 2023.

I want to extend my sincere thanks to the supervisors: Ms. Dipty Yadav and
Mrs. Pinki Meena who have always been a constant source of motivation and
guidance factor throughout this report and enhanced my report and knowledge
in the field of Surveying.

Date: Bhavya Yadav


21/010
3rd Year B Tech. (Civil)
List of Members

S.No. Name URN


1. Ayush Singh Rathore 21EUCCE019
2. Bhagat Singh Choudhary 21EUCCE020
3. Bhavendra Choudhary 21EUCCE021
4. Bhavya Yadav 21EUCCE022
5. Bheem Singh Gurjar 21EUCCE023
6. Charvi Sankhla 21EUCCE024
7. Dakshay Verma 22EUCCE0204
8. Deepak Sharma 22EUCCE0205
9. Himanshi Sharma 22EUCCE0206
10. Daksh Saronja 21EUCCE025
11. Deepak Choudhary 21EUCCE026
12. Deepak Gurjar 21EUCCE027
13. Deepak Meena 21EUCCE028
14. Deepak Sharma 21EUCCE029
15. Deepak Meena 21EUCCE030
16. Devendra Kumawat 21EUCCE031
17. Devendra Prajapati 21EUCCE032
18. Gungun Vijay 21EUCCE033
19. Harshit Tyagi 21EUCCE034
20. Hemant 21EUCCE035
21. Himanshu Sharma 21EUCCE036
Abstract

The camp was held at Rajasthan Technical University campus, Kota, Rajasthan. The
camp took place for a period of 7 days from 3rd Oct. 2023 to 10th Oct. 2023.

We learnt the Longitudinal Section and Cross Section of a proposed roadway, level of a
50m x 50m area by Grid Contouring and shifting of RL using Fly Levelling. All the
experiments were performed at the RTU campus. NO difficulty was faced by us while
performing the experiments.
Index

S.No. Topic Page


No.

1 Chapter Introduction and Reconnaissance Survey

2 Chapter:2 From the First crossing after the Main gate, complete the loop around the footwall ground and
Non-teaching staff colony up to the corner behind Hostel
III

3 Chapter:3 From the Main gate of the institute to Workshop III and around D Block up to T- Junction. Work
has to be carried out on both sides of the divider

4 Chapter:4 Contouring the given area of 50m X 50m in front of the New Hostel

5 Chapter:5 Shifting of R.L. from Hanging Bridge (PL-7/1-5) to temporary B.M. (near survey lab).

6 Chapter:6 From T-Junction at Dispensary Road to C and D-type, and B-Type quarters up to the first crossing
after the Main gate.

7 Chapter:7 From the corner behind Hostel III, loop around Hostel V (New Hostel) up to T-Junction at
Dispensary Road.