Detail Risk & Causes Current Risk Level Risk Mitigation Actions Post Action (Residual) Risk Level
By When
By Whom
Step in Process / Component / Risk Description Current Controls (target
Item Department Functional Area Potential Cause(s) Consequence Likelihood Risk Level Risk Treatment Actions (person responsible Consequence Likelihood Risk Level
Section (Include Activity, Product, Service) (Engineering, Separation, Procedures, PPE) completion
for action)
date)
Index Pick from List Pick from List Type Text Type Text Type Text Type Text Pick from List Pick from List Formula Type Text Type Text Type Date Pick from List Pick from List Formula
Hazard identification and control processes i.e. JHA, SWP's & STAR.
Manage controls in place, educate
Confirm that adequate barriers are provided around areas where hazards may exist, and
workforce and enforce breaks especially
Task duration that such hazards are clearly lit.
4C MED with hot work, ensure there is adequate All team members 18/Dec/2023 Minor Unlikely 4D LOW
Fatigue Injury to personnel. Confirm the implementation of work requirements for tasks as identified in the work plan, Minor Possible
shade for breaks, reinforce the
applicable permits, JHA, etc.
requirement for breaks at prestart,
Stop Work Authority and intervening when they perceive a risk to people and/or the
monitor during hot days.
environment.
Comply with Higginsville Mobile Plant requirements/ documentation and VOC Maintenance completed as per
manufactures' requirements, Daily Pre-
start equipment inspection, Current
inspection certificates, visual inspections
Unscheduled/unsafe plant on site
Lack of maintenance - prior to entry and documentation checks
resulting in personnel injury, and/or site Moderate Possible 3C MED All team members 18/Dec/2023 Minor Unlikely 4D LOW
resulting in personnel injury for all service records and compliance to
breach
Higginsville site requirements, VOC all
operators prior to them operating on their
own.
Operators qualified, barricading and established exclusion zone work area, spotter in Procedure for working with qualified Ultra
place. Leave existing mesh in place whilst working near & ensure wash out is carried out High personal, Competent spotter for
Injury to personnel by fallen to minimise build up. PPE. If mesh is removed for work access place mesh barrier from emergency machine shutdown, Regular
Dropped objects - debris from operation
objects, eye injuries, slips & walkway/s above to capture debris. Moderate Possible 3C MED inspection of equipment consumables. All team members 18/Dec/2023 Moderate Unlikely 3D LOW
conveyor/s Facesheild for operator Barricading and
falls
exclusion zones, Use of TMP's to restrict
access. Cover all electrical components
Manual handling.
Adopting awkward, sustained postures.
Survey / Indentification of Back injury prevention shall be continually emphasized through safety meetings, tool box
2 Projects Operational Forces exerted by the worker or on the
repair area meetings, pre-start briefings, and the STAR process. All project personnel shall
worker. Ensure JHA's are reviewed daily and reflect
Musculoskeletal stress. participate as appropriate in the Safe Spine stretching program. Information and training
Handling heavy, unstable/unbalanced the tasks to be undertaken, utilise mechanical
Strains / sprains. in correct manual handling technique and back injury prevention. Modify object to be Moderate Possible 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
loads. lifting apparatus where possible, ensure take
Slips, trips and falls. moved / lifted (break down into smaller, lighter packages etc). Good housekeeping. Job 5's are done for critical lifting tasks.
Loads difficult to grasp or hold.
design (duration / frequency) and rotation. Tools / equipment in good working order.
Repetitive actions / movements.
Supervision.
Vibration.
Inadequate housekeeping.
Civil Works
1 of 6
Detail Risk & Causes Current Risk Level Risk Mitigation Actions Post Action (Residual) Risk Level
By When
By Whom
Step in Process / Component / Risk Description Current Controls (target
Item Department Functional Area Potential Cause(s) Consequence Likelihood Risk Level Risk Treatment Actions (person responsible Consequence Likelihood Risk Level
Section (Include Activity, Product, Service) (Engineering, Separation, Procedures, PPE) completion
for action)
date)
Manual handling.
Adopting awkward, sustained postures.
Back injury prevention shall be continually emphasized through safety meetings, tool box
Forces exerted by the worker or on the
meetings, pre-start briefings, and the STAR process. All project personnel shall
worker. Ensure JHA's are reviewed daily and reflect
Musculoskeletal stress. participate as appropriate in the Safe Spine stretching program. Information and training
Handling heavy, unstable/unbalanced the tasks to be undertaken, utilise mechanical
Strains / sprains. in correct manual handling technique and back injury prevention. Modify object to be Moderate Possible 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
loads. lifting apparatus where possible, ensure take
Slips, trips and falls. moved / lifted (break down into smaller, lighter packages etc). Good housekeeping. Job 5's are done for critical lifting tasks.
Loads difficult to grasp or hold.
design (duration / frequency) and rotation. Tools / equipment in good working order.
Repetitive actions / movements.
Supervision.
Vibration.
Inadequate housekeeping.
Manual handling.
Adopting awkward, sustained postures.
Back injury prevention shall be continually emphasized through safety meetings, tool box
Forces exerted by the worker or on the
meetings, pre-start briefings, and the STAR process. All project personnel shall
worker. Ensure JHA's are reviewed daily and reflect
Musculoskeletal stress. participate as appropriate in the Safe Spine stretching program. Information and training
Handling heavy, unstable/unbalanced the tasks to be undertaken, utilise mechanical
5 Strains / sprains. in correct manual handling technique and back injury prevention. Modify object to be Moderate Possible 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
loads. lifting apparatus where possible, ensure take
Slips, trips and falls. moved / lifted (break down into smaller, lighter packages etc). Good housekeeping. Job 5's are done for critical lifting tasks.
Loads difficult to grasp or hold.
design (duration / frequency) and rotation. Tools / equipment in good working order.
Repetitive actions / movements.
Supervision.
Vibration.
Inadequate housekeeping.
2 of 6
Detail Risk & Causes Current Risk Level Risk Mitigation Actions Post Action (Residual) Risk Level
By When
Projects Operational Installation of Reinforcing Bars/ Risk Description By Whom
Step in Process / Component Current Controls (target
Item Department Functional Area Potential Cause(s) Consequence Likelihood Risk Level Risk Treatment Actions (person responsible Consequence Likelihood Risk Level
Section (Include Activity, Product, Service) (Engineering, Separation, Procedures, PPE) completion
for action)
date)
Ensure proper housekeeping is
Trip Hazards Debris from blasting Housekeeping, awareness of surroundings Minor Possible 4C MED maintained before during and after works , All team members 18/Dec/2023 Minor Unlikely 4D LOW
awareness of surroundings
Noisy equipment, mills Hazard Identification, Ensure hearing
Noise operating, vehicles passing Hazard identification, Mandatory P.P.E Moderate Unlikely 3D LOW P.P.E is of adequate grade and correctly All team members 18/Dec/2023 Minor Unlikely 4D LOW
by fitted
Hazard identification and control processes i.e. JHA, SWP's & STAR.
Manage controls in place, educate
Confirm that adequate barriers are provided around areas where hazards may exist, and
workforce and enforce breaks especially
Task duration that such hazards are clearly lit.
4C MED with hot work, ensure there is adequate All team members 18/Dec/2023 Minor Unlikely 4D LOW
Fatigue Injury to personnel. Confirm the implementation of work requirements for tasks as identified in the work plan, Minor Possible
shade for breaks, reinforce the
applicable permits, JHA, etc.
8 requirement for breaks at prestart,
Stop Work Authority and intervening when they perceive a risk to people and/or the
monitor during hot days.
environment.
Manual handling.
Adopting awkward, sustained postures.
Back injury prevention shall be continually emphasized through safety meetings, tool box
Forces exerted by the worker or on the
meetings, pre-start briefings, and the STAR process. All project personnel shall
worker. Ensure JHA's are reviewed daily and reflect
Musculoskeletal stress. participate as appropriate in the Safe Spine stretching program. Information and training
Handling heavy, unstable/unbalanced the tasks to be undertaken, utilise mechanical
9 Strains / sprains. in correct manual handling technique and back injury prevention. Modify object to be Moderate Possible 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
loads. lifting apparatus where possible, ensure take
Slips, trips and falls. moved / lifted (break down into smaller, lighter packages etc). Good housekeeping. Job 5's are done for critical lifting tasks.
Loads difficult to grasp or hold.
design (duration / frequency) and rotation. Tools / equipment in good working order.
Repetitive actions / movements.
Supervision.
Vibration.
Inadequate housekeeping.
Hazard identification and control processes i.e. JHA, SWP's & STAR.
Manage controls in place, educate
Confirm that adequate barriers are provided around areas where hazards may exist, and
workforce and enforce breaks especially
Task duration that such hazards are clearly lit.
11 4C MED with hot work, ensure there is adequate All team members 18/Dec/2023 Minor Unlikely 4D LOW
Fatigue Injury to personnel. Confirm the implementation of work requirements for tasks as identified in the work plan, Minor Possible
Projects Operational Concrete Pouring shade for breaks, reinforce the
applicable permits, JHA, etc.
requirement for breaks at prestart,
Stop Work Authority and intervening when they perceive a risk to people and/or the
monitor during hot days.
environment.
Comply with Higginsville Mobile Plant requirements/ documentation and VOC Maintenance completed as per
manufactures' requirements, Daily Pre-
start equipment inspection, Current
inspection certificates, visual inspections
Unscheduled/unsafe plant on site
Lack of maintenance - prior to entry and documentation checks
12 resulting in personnel injury, and/or site Moderate Possible 3C MED All team members 18/Dec/2023 Minor Unlikely 4D LOW
resulting in personnel injury for all service records and compliance to
breach
Higginsville site requirements, VOC all
operators prior to them operating on their
own.
Manual handling.
Adopting awkward, sustained postures.
Back injury prevention shall be continually emphasized through safety meetings, tool box
Forces exerted by the worker or on the
meetings, pre-start briefings, and the STAR process. All project personnel shall Ensure JHA's are reviewed daily and
worker.
Musculoskeletal stress. participate as appropriate in the Safe Spine stretching program. Information and training reflect the tasks to be undertaken, utilise
Handling heavy, unstable/unbalanced 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
Strains / sprains. in correct manual handling technique and back injury prevention. Modify object to be Moderate Possible mechanical lifting apparatus where
loads.
Slips, trips and falls. moved / lifted (break down into smaller, lighter packages etc). Good housekeeping. Job possible, ensure take 5's are done for
Loads difficult to grasp or hold.
design (duration / frequency) and rotation. Tools / equipment in good working order. critical lifting tasks.
Repetitive actions / movements.
Supervision.
Vibration.
Inadequate housekeeping.
3 of 6
15 Projects Operational Housekeeping
Detail Risk & Causes Current Risk Level Risk Mitigation Actions Post Action (Residual) Risk Level
By When
By Whom
Step in Process / Component / Risk Description Current Controls (target
Item Department Functional Area Potential Cause(s) Consequence Likelihood Risk Level Risk Treatment Actions (person responsible Consequence Likelihood Risk Level
Section (Include Activity, Product, Service) (Engineering, Separation, Procedures, PPE) completion
for action)
date)
Proactive awareness of weather events
Inclement weather site procedures and tracking, access to Higginsville site
Lightening / wind / rain - Monitor weather forecasts 3C MED monitoring system, BOM or alternative All team members 18/Dec/2023 Moderate Unlikely 3D LOW
Inclement weather Moderate Possible
injuries/equipment damage Appropriate communications online monitoring systems, if in doubt take
Lightning alert message system it down and all personnel inside at
appropriate timing, advance warning
Working in Adverse temperature training,
Heat exhaustion, nausea, 3C MED All team members 18/Dec/2023 Moderate Unlikely 3D LOW
Dehydration Regular Breaks, Fluid intake Moderate Possible Regular breaks, regular fluid intake,
headaches
hydrolytes as required
4 of 6
CONSEQUENCE Control Effectiveness
Insignificant Minor Moderate Major Catastrophic
5 4 3 2 1 Risk management strategies or the control environment is considered
insufficient or inadequate in mitigating the risk or no system or
Almost Certain
5A 4A 3A 2A 1A Inadequate
Expected occurrences - once per A
Medium Medium High High High process exists to manage the risk. Immediate action should be
week
undertaken to improve the risk mitigation.
Likely
5B 4B 3B 2B 1B
Probable occurrences - once per B
Medium Medium High High High
month Some strategies and controls are in place, but they are not operating
LIKELIHOOD
Requires Improvement sufficiently to mitigate the risk within business tolerance. Further risk
Possible 5C 4C 3C 2C 1C
Possible occurrences - once per year C
Low Medium Medium Medium High mitigation strategies should be considered.
Unlikely
5D 4D 3D 2D 1D
Unlikely to occur - once every 5-10 D
Low Low Low Medium Medium
years Risk management strategies or controls in place are considered
Adequate
Rare
sufficient to mitigate the risk within business tolerance.
5E 4E 3E 2E 1E
May occur in exceptional E
circumstances >10 years Low Low Low Medium Medium
RATING 5 4 3 2 1
Loss or
The event could possible occur at some time but is unlikely Business Site <$50,000 >$50,000 >$500,000 >$2,500,000 >$10,000,000
Unlikely D Disruption
Once every 5 - 10 years Process Loss Loss Equivalent up to 6 Loss Equivalent up to 24 Loss Equivalent to 7days Loss Equivalent up to 1 Loss Equivalent to greater
Loss or
The event could possible occur at some time but is unlikely Business Site <$50,000 >$50,000 >$500,000 >$2,500,000 >$10,000,000
Unlikely D Disruption
Once every 5 - 10 years Process Loss Loss Equivalent up to 6 Loss Equivalent up to 24 Loss Equivalent to 7days Loss Equivalent up to 1 Loss Equivalent to greater
(Time) hours production hours production production month's production than 1 month's production