A.

Analisis Lengkung Vertikal 1 (Cekung)

STA PPV1 = 0+186,71


Elevasi = 51,80 m
G1 = 3,11%
G2 = 4,79%
A = |G2-G1| = (4,79-3,11) = 1,68%
Vr = 80 km/jam
S = 130 m

Menghitung Lv

1. Berdasarkan jarak pandang henti


Kondisi S < Lv
A∗S ²
Lv =
658

1, 68∗130²
=
658

= 43,15 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
1, 68

= -82,26 ≈ 0 (Memenuhi)
2. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658

1, 68∗80²
Lv =
658

Lv = 16,34 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 1,68
Lv = 84 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

1, 68∗84
Ev =
800

Ev = 0,034

Lv
A∗( )²
Y= 4
200 x Lv

84
1, 68∗( )²
Y= 4
200 x 84

Y = 0,0085

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 51,54 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 51,67 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 51,83 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 52,00 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 52,19 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 0+178,54
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 0+182,625
3. STA PTV = STA PPV1
STA PTV = 0+186,71
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 0+190,795
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 0+194,88

B. Analisis Lengkung Vertikal 2 (Cekung)

STA PPV1 = 0+482,87


Elevasi = 54,31 m
G1 = -0,67%
G2 = 0,32%
A = |G2-G1| = (0,32-(-0,67)) = 0,99 %
Vr = 80 km/jam
S = 130 m

Menghitung Lv

1. Berdasarkan jarak pandang henti


Kondisi S < Lv
A∗S ²
Lv =
658

0 , 99∗130²
=
658

= 25,42 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
0 ,99

= -320,80 ≈ 0 (Memenuhi)
2. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658
0 , 99∗80²
Lv =
658

Lv = 9,62 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 0,99
Lv = 49,5 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

0 , 99∗49 ,5
Ev =
800

Ev = 0,011

Lv
A∗()²
Y= 4
200 x Lv

49 , 5
0 , 99∗( )²
Y= 4
200 x 49 , 5

Y = 0,003

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 54,34 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 54,33 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 54,32 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 54,32 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 54,33 m
Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 0+478,055
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 0+480,463
3. STA PTV = STA PPV1
STA PTV = 0+482,87
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 0+485,277
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 0+487,685
C. Analisis Lengkung Vertikal 3 (Cembung)

STA PPV1 = 1+128,61


Elevasi = 56,39 m
G1 = 0,32%
G2 = -2,91%
A = |G2-G1| = (-2,91 – 0,32) = 3,23 %
Vr = 80 km/jam
S = 130 m

1. Berdasarkan jarak pandang henti


Kondisi S < Lv
A∗S ²
Lv =
658

3 ,23∗130²
=
658

= 82,96 (Tidak Memenuhi)

Kondisi S > Lv

658
Lv = 2S -
A

658
= 2*130 -
3 ,23

= 56,28 (Memenuhi)
2. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 3,23
Lv = 161,5

3. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

3 ,23∗161 ,5
Ev =
800

Ev = 0,65

Lv
A∗( )²
Y= 4
200 x Lv

161 , 5
3 ,23∗( )²
Y= 4
200 x 161, 5

Y = 0,163

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 56,13 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 56,26 m
3. Elevasi PPV₂ = Elevasi PPV1 - Ev
Elevasi PPV₂ = 55,74 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) - y
Elevasi X₂ = 55,05 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 54,04 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 1+47,86
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 1+88,235
3. STA PTV = STA PPV1
STA PTV = 1+128,61
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 1+168,985
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 1+209,36

D. Analisis Lengkung Vertikal 4 (Cekung)

STA PPV1 = 1+537,54


Elevasi = 44,50 m
G1 = -2,91%
G2 = 0,66%
A = |G2-G1| = (0,66-(-2,91)) = 3,57%
Vr = 80 km/jam
S = 130 m

Menghitung Lv
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

3 ,57∗130²
=
658

= 91,69 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
3 ,57

= 98,93 (Memenuhi)
2. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658
3 ,57∗80²
Lv =
658

Lv = 34,72 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 3,57
Lv = 178,5 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

3 ,57∗178 , 5
Ev =
800

Ev = 0,15

Lv
A∗()²
Y= 4
200 x Lv

178 , 5
3 ,57∗( )²
Y= 4
200 x 178 ,5

Y = 0,0387

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 45,00 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 44,75 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 44,65 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 44,59 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 44,61 m
Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 1+520,178
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 1+528,859
3. STA PTV = STA PPV1
STA PTV = 1+537,54
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 1+546,221
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 1+554,902

E. Analisis Lengkung Vertikal 5 (Cembung)

STA PPV1 = 1+901,36


Elevasi = 45,42 m
G1 = 1,04%
G2 = -0,75%
A = |G2-G1| = (-0,75 – 1,04) = 1,79 %
Vr = 80 km/jam
S = 130 m

1. Berdasarkan jarak pandang henti


Kondisi S < Lv
A∗S ²
Lv =
658

1, 79∗130²
=
658

= 45,97 (Tidak Memenuhi)

Kondisi S > Lv

658
Lv = 2S -
A

658
= 2*130 -
1, 79
= -107,59 ≈ 0 (Memenuhi)
2. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 1,79
Lv = 89,5

3. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

1, 79∗89 , 5
Ev =
800

Ev = 0,2

Lv
A∗( )²
Y= 4
200 x Lv

89 , 5
1, 79∗( )²
Y= 4
200 x 89 ,5

Y = 0,05

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 44,95 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 45,18 m
3. Elevasi PPV₂ = Elevasi PPV1 - Ev
Elevasi PPV₂ = 45,21 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) - y
Elevasi X₂ = 45,20 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 45,08 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 1+856,61
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 1+878,985
3. STA PTV = STA PPV1
STA PTV = 1+901,36
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 1+923,735
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 1+946,11

F. Analisis Lengkung Vertikal 5 (Cekung)

STA PPV1 = 2+000


Elevasi = 44,67 m
G1 = -0,75%
G2 = -0,71%
A = |G2-G1| = (-0,71 – (-0,75)) = 0,04%
Vr = 80 km/jam
S = 130 m

Menghitung Lv
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

0 , 04∗130²
=
658

= 0,38 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
0 , 04

= -14115 ≈ 0 (Memenuhi)
2. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658

0 , 04∗80²
Lv =
658

Lv = 0,38 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 0,04
Lv = 2 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

0 , 04∗2
Ev =
800

Ev = 1,95
Lv
A∗( )²
Y= 4
200 x Lv

2
0 , 04∗( )²
Y= 4
200 x 2

Y = 4,8

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 44,68 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 44,67 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 44,67 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 44,67 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 44,671 m
Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 1+999,80
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 1+999,903
3. STA PTV = STA PPV1
STA PTV = 2+000
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 2+0,097
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 2+0,1945

G. Analisis Lengkung Vertikal 6 (Cembung)

STA PPV1 = 2+352,93


Elevasi = 42,16 m
G1 = -0,71%
G2 = -3,43%
A = |G2-G1| = (-3,43 – (-0,71)) = 2,72 %
Vr = 80 km/jam
S = 130 m

1. Berdasarkan jarak pandang henti


Kondisi S < Lv
A∗S ²
Lv =
658

2 ,72∗130²
=
658

= 69,86 (Tidak Memenuhi)

Kondisi S > Lv

658
Lv = 2S -
A
658
= 2*130 -
2 ,72

= 18,08 (Memenuhi)
1. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 2,72
Lv = 136

2. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

2 ,72∗136
Ev =
800

Ev = 0,462

Lv
A∗( )²
Y= 4
200 x Lv

136
2 ,72∗( )²
Y= 4
200 x 136

Y = 0,1156

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 42,64 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 42,40 m
3. Elevasi PPV₂ = Elevasi PPV1 - Ev
Elevasi PPV₂ = 41,69 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) - y
Elevasi X₂ = 40,87 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 39,82 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 2+284,93
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 2+318,93
3. STA PTV = STA PPV1
STA PTV = 2+352,93
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 2+386,93
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 2+420,93

H. Analisis Lengkung Vertikal 7 (Cekung)

STA PPV1 = 2+638,90


Elevasi = 32,33 m
G1 = -3,43%
G2 = -1,41%
A = |G2-G1| = (-1,41 - (-3,43)) = 2,02%
Vr = 80 km/jam
S = 130 m

Menghitung Lv
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

2 ,02∗130²
=
658

= 51,88 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
2 ,02

= -24,65 ≈ 0 (Memenuhi)
1. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658

2 ,02∗80²
Lv =
658

Lv = 19,64 m
2. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 2,02
Lv = 101 m

3. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

2 ,02∗101
Ev =
800

Ev = 0,05

Lv
A∗()²
Y= 4
200 x Lv

101
2 ,02∗( )²
Y= 4
200 x 101

Y = 0,012

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 32,66 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 32,49 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 32,37 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 32,27 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 32,19 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 2+629,076
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 2+633,988
3. STA PTV = STA PPV1
STA PTV = 2+638,9
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 2+643,812
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 2+648,724

I. Analisis Lengkung Vertikal 8 (Cekung)

STA PPV1 = 2+885


Elevasi = 28,86 m
G1 = -1,41%
G2 = -1,00%
A = |G2-G1| = (-1,00 - (-1,41)) = 0,41%
Vr = 80 km/jam
S = 130 m

Menghitung Lv
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

0 , 41∗130²
=
658

= 10,53 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A
120+3 ,5∗130
= 2*130 -
0 , 41

= -1142,44 ≈ 0 (Memenuhi)
2. Berdasarkan kenyamanan lengkung vertikal cekung
A∗V ²
Lv =
658

0 , 41∗80²
Lv =
658

Lv = 3,98 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 0,41
Lv = 20,5 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

0 , 41∗20 ,5
Ev =
800

Ev = 0,002

Lv
A∗()²
Y= 4
200 x Lv

20 ,5
0 , 41∗( )²
Y= 4
200 x 20 , 5

Y = 0,0005

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 28,88 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 28,87 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 28,86 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 28,85 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 28,84 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 2+883,006
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 2+884,003
3. STA PTV = STA PPV1
STA PTV = 2+885
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 2+885,997
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 2+886,994

J. Analisis Lengkung Vertikal 9 (Cekung)

STA PPV1 = 3+160


Elevasi = 26,10 m
G1 = 1,00%
G2 = 0,54%
A = |G2-G1| = (0,54 - (1,00)) = 0,46%
Vr = 80 km/jam
S = 130 m

Menghitung Lv
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

0 , 46∗130²
=
658
= 11,81 (Tidak Memenuhi)

Kondisi S > Lv

120+3 ,5∗S
Lv = 2S -
A

120+3 ,5∗130
= 2*130 -
0 , 46

= -990 ≈ 0 (Memenuhi)

2. Berdasarkan kenyamanan lengkung vertikal cekung


A∗V ²
Lv =
658

0 , 46∗80²
Lv =
658

Lv = 4,47 m
3. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 0,46
Lv = 23 m

4. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

0 , 46∗23
Ev =
800

Ev = 0,003

Lv
A∗( )²
Y= 4
200 x Lv

23
0 , 46∗( )²
Y= 4
200 x 2 3
Y = 0,0006

Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 26,07 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 26,08 m
3. Elevasi PPV₂ = Elevasi PPV1 + Ev
Elevasi PPV₂ = 26,10 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) + y
Elevasi X₂ = 26,11 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 26,112 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 3+157,763
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 3+158,881
3. STA PTV = STA PPV1
STA PTV = 3+160
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 3+161,119
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 3+162,237

K. Analisis Lengkung Vertikal 10 (Cembung)

STA PPV1 = 3+571,55


Elevasi = 28,32 m
G1 = 0,54%
G2 = -1,31%
A = |G2-G1| = (-1,31 – (0,54)) = 1,85 %
Vr = 80 km/jam
S = 130 m
1. Berdasarkan jarak pandang henti
Kondisi S < Lv
A∗S ²
Lv =
658

1, 8 5∗130²
=
658

= 47,51 (Tidak Memenuhi)

Kondisi S > Lv

658
Lv = 2S -
A

658
= 2*130 -
1, 85

= -95,67 ≈ 0 (Memenuhi)
2. Berdasarkan syarat drainase
Lv = 50 x A
Lv = 50 x 1,85
Lv = 92,5

3. Kesimpulan
Nilai minimum Lv berdasarkan Tabel adalah
A∗Lv
Ev =
800

1, 8 5∗92 ,5
Ev =
800

Ev = 0,21

Lv
A∗( )²
Y= 4
200 x Lv

92 , 5
1, 8 5∗( )²
Y= 4
200 x 9 2 ,5

Y = 0,05
Menghitung Elevasi

1. Elevasi PLV = Elevasi PPV1 – (0,5 x Lv x G1)


Elevasi PLV = 38,07 m
2. Elevasi X₁ = Elevasi PPV1 – (1/4 x Lv x G1)
Elevasi X₁ = 38,19 m
3. Elevasi PPV₂ = Elevasi PPV1 - Ev
Elevasi PPV₂ = 38,10 m
4. Elevasi X₂ = Elevasi PPV1 + (1/4 x Lv x G2) - y
Elevasi X₂ = 37,96 m
5. Elevasi PTV = Elevasi PPV1 + (1/2 x Lv x G2)
Elevasi PTV = 37,71 m

Menghitung Stationing

1. STA PLV = STA PPV1 – 0,5 x LV


STA PLV = 3+525,3
2. STA X₁ = STA PPV1 – (1/4 x LV)
STA X₁ = 3+548,425
3. STA PTV = STA PPV1
STA PTV = 3+571,55
4. STA X₂ = STA PPV₁ + (1/4 X Lv)
STA X₂ = 3+594,675
5. STA PTV = STA PPV₁ + (1/2 x Lv)
STA PTV = 3+617,8