PLUMBNESS &

ROUNDNESS
Subject : Survey Report For Dimension Roundness and Plumbness
Project : RDMP Project - Balikpapan Report No. : RFI-R-CH-MS-
DWG No. : 26071-29A-D-320-07A Date : 10 Oct 2022
Location : Tank D-320-07A/Area 55 Subcontractor : PT Recon Sarana Utama
Page : 1 Of Job No. : 26071

+ (a) - - (a) +
0⁰
Top

45
31
5⁰

21.000
(h)
270˚ 90⁰

Bott.
13
5⁰

5⁰
22

180⁰

PLUMBNES
S
Item/ ROUNDNESS Acc PLUMBNESS Acc.
No. REMARKS
Point Design Actual Dev. Y/ N Bottom Middle Top Dev. Y/N
1 0˚ 0 -1 -4
2 45˚ 0 -22 -39
3 90˚ 0 7 -17
4 135˚ 0 7 3
5 180˚ 0 3 14
6 225˚ 0 -29 -14
7 270˚ 0 -24 -5
8 315˚ 0 -5 -23

Note:
- Dimension In mm - Hight Tank 21,00 M
- Tolerance Plumbness h/200 (API 650) - Diameter Tank 39,00 M
- Before Welding Shell to Annular Plate Field Data - Maximum Correction Plumbness 105 mm and Roundness 19 mm

Inspection Result : Accept As Noted Reject

Inspected by: Subcontractor Contractor IPMT


Print Name

Signature

Date 4-Oct-22 4-Oct-22 4-Oct-22


DOC. No. : 26071-100-GQI-GCQ-00009 (Rev. 004) FORM -ITR-003
PLUMBNESS &
ROUNDNESS
Subject : Survey Report For Dimension Roundness and Plumbness
Project : RDMP Project - Balikpapan Report No. : RFI-R-CH-MS-
DWG No. : 26071-29A-D-320-07C Date : 10 Oct 2022
Location : Tank D-320-07A/Area 55 Subcontractor : PT Recon Sarana Utama
Page : 1 Of Job No. : 26071

+ (a) - - (a) +
0⁰
Top

45
31
5⁰

21.000
(h)
270˚ 90⁰

Bott.
13
5⁰

5⁰
22

180⁰

PLUMBNES
S
Item/ ROUNDNESS Acc PLUMBNESS Acc.
No. REMARKS
Point Design Actual Dev. Y/ N Bottom Middle Top Dev. Y/N
1 0˚ 31.233 31.243 31.278 -0.045
2 45˚ 33.454 33.433 33.442 0.012
3 90˚ 20.035 20.031 20.033 0.002
4 135˚ 23.282 23.273 23.271 0.011
5 180˚ 22.926 22.901 22.859 0.067
6 225˚ 21.520 21.506 21.505 0.015
7 270˚ 23.000 23.018 23.017 -0.017
8 315˚ 25.339 25.358 25.359 -0.020

Note:
- Dimension In mm - Hight Tank 21,00 M
- Tolerance Plumbness h/200 (API 650) - Diameter Tank 39,00 M
- Before Welding Shell to Annular Plate Field Data - Maximum Correction Plumbness 105 mm and Roundness 19 mm

Inspection Result : Accept As Noted Reject

Inspected by: Subcontractor Contractor IPMT


Print Name

Signature

Date 4-Oct-22 4-Oct-22 4-Oct-22


DOC. No. : 26071-100-GQI-GCQ-00009 (Rev. 004) FORM -ITR-003