Professional Documents
Culture Documents
1603
1603
15cm
30cm
15cm REFERENCE DRAWINGS
DRAWING NUMBER DRAWING TITLE
Client :
Engineering :
Constructor :
PT. TRITEK ENERGI INDONESIA
PROJECT TITLE :
150
150
20 21
BETON EKSISTING 40 40
20
20 20
20 20
30 30
30 30
30 30
250 300
20
BETON EKSISTING
1160
1160
B 72,5
25 47,5
250 I I
REFERENCE DRAWINGS
150
DRAWING NUMBER DRAWING TITLE
A A 20 20
JOINT KOLOM KE SIKU 2020
100
200
20 20
20 20
20 20
30 30
30 30
30 30
UNP 100x50x7.5mm
250
500
500
PLAT t=6mm 1100
25
ANGKUR BAUT 850 8020
2X M8
4 M16L = 450 mm
30
60
30
20
40
20
DENAH PONDASI 2X M8
1:25
DETAIL A HOLLOW 40X40X1.2mm REV DATE ISSUE DESCRIPTION PREPD CHECK APPRD
BY DATE
Constructor :
20 20
20 20
30 30
30 30
20 20
III UNP 100x50x7.5mm 2020
PLAT 40x80x9mm HOLLOW 40X40X1.2mm
II
600
5
PLAT 60x80x6mm
20 20
20 20
30 30
30 30
UNP 100x50x7.5mm
20 20
40
30 40
PLAT t=6mm
2X M8
PLAT 60x80x6mm
HOLLOW 40X40X1.2mm
9 9
40
40
SECTION II (ATAS)
1:25
BY DATE
REV DATE ISSUE DESCRIPTION PREPD CHECK APPRD
CLIENT APPROVAL
Client :
Engineering :
Constructor :
PT. TRITEK ENERGI INDONESIA
PROJECT TITLE :
REFERENCE DRAWINGS
DRAWING NUMBER DRAWING TITLE
BY DATE
REV DATE ISSUE DESCRIPTION PREPD CHECK APPRD
CLIENT APPROVAL
Client :
Engineering :
Constructor :
PT. TRITEK ENERGI INDONESIA
PROJECT TITLE :
DETAIL SAMBUNGAN I
DETAIL SAMBUNGAN IV
REFERENCE DRAWINGS
DRAWING NUMBER DRAWING TITLE
DETAIL SAMBUNGAN II
BY DATE
REV DATE ISSUE DESCRIPTION PREPD CHECK APPRD
CLIENT APPROVAL
Client :
Engineering :
Constructor :
PT. TRITEK ENERGI INDONESIA
PROJECT TITLE :