1) The document outlines the internal control system guidelines for the motor pool section of the provincial engineering office.
2) It details 14 procedures for preventative vehicle maintenance, repair, and inventory/control of supplies. Key steps include inspection and reporting, procuring necessary parts, conducting repairs, and reporting/record keeping.
3) Procedures are assigned to various roles like drivers, mechanics, administrative staff, and the motor pool section head to ensure accountability and proper documentation and approval at each stage. Timelines are provided for each step.
Original Description:
Internal Control System Guidelines - PEO (Motorpool)
1) The document outlines the internal control system guidelines for the motor pool section of the provincial engineering office.
2) It details 14 procedures for preventative vehicle maintenance, repair, and inventory/control of supplies. Key steps include inspection and reporting, procuring necessary parts, conducting repairs, and reporting/record keeping.
3) Procedures are assigned to various roles like drivers, mechanics, administrative staff, and the motor pool section head to ensure accountability and proper documentation and approval at each stage. Timelines are provided for each step.
1) The document outlines the internal control system guidelines for the motor pool section of the provincial engineering office.
2) It details 14 procedures for preventative vehicle maintenance, repair, and inventory/control of supplies. Key steps include inspection and reporting, procuring necessary parts, conducting repairs, and reporting/record keeping.
3) Procedures are assigned to various roles like drivers, mechanics, administrative staff, and the motor pool section head to ensure accountability and proper documentation and approval at each stage. Timelines are provided for each step.
Name of Office: Siqr.r'rjor Provincial Engineering Office
Section: Motor Pool Section
Activity Procedure Person/Unit Timeline
No. Responsible Preventive Maintenance (Vehicles/Heavy Equipment under PEO) 7 Prepares the Preventive Maintena- Driver/Operator nce Schedule of the Vehicle/Heavy Equipment and notifies the Motor as scheduled based on Pool Section Head about it. Preventive Maintenance 2 Assigns a mechanic to conduct ins- Motor Pool Section Head Schedule pection to determine scope of work or repair. 3 Conducts inspection to determine Mechanic the scope of work or repair and pre- within 3 days pares the Pre-inspection Report Form, 4 Reviews and approves the Pre-inspec- Motor Pool Section Head after inspection tion Report Form. 5 Prepares the Supplies Availability Adrnin. Staff after determining the lnquiry (5Al), forwards it to the needed spare parts/ Accounting Office and records in maintenance supplies the outgoing logbook. 6a. Prepares Requisition and lssue Slip Admin. Staff (RlS) if supply is available based on after receiving SAI and forwards to the General confirmation from Services Office together with the Accounting Office SAI and records in the outgoing log- book. 6b. Prepares the Purchase Request (pR) Admin. Staff if supply is not available based on sAt. 7 Conducts repair work on the conce- Mechanic depending on severity of rned equipment/vehicle if supply is defects/necessa ry available (on hand). maintenance work 8 Prepares Accomplishment Report Mechanic within 3 days (Post Repair Report). after repair 9 Reviews the Post Repair Report. Motor Pool Section Head within l day 10a. Forwards the approved Post Repair Admin. Staff for PPElsupply booked Report to the Accounting Office as asset, after review (if supply is available in stock). 10b. Attaches the approved PRR to the Admin. Staff Disbursement Voucher and other after review supporting documents for payment to supplier (if supply is procured). LT Records all repair on the Equipment DriverlOperator after submitting the Post listory Record Logbook. Report INVENTORY AND CONTROL OF SEMI-EXPENDABLE SUPPTIES AND MATERIALS
{!991t, Personnel Prot"rt,ne Eqrip^"nt {pp|.r,) equipment below ls thousand pesos}
12 Receives the procurred semi-expen- Motor Pool Property dable supplies and materials. Custodian 13 Updates the existing inventory of Motor Pool Property upon receipt semi-expendable supplies and ma- Custodian terials in inventory card. 14 Maintains a borrower's logbook Motor Pool Property which contains the following: Custodian everytime a. Name of borrower semi-expendable b. Specification of semi,expendable supplies and materials supplies and materials are borrowed c. Date and time borrowed