You are on page 1of 3

United Business Systems (Pvt) Ltd.

Plot No. 1 & 2, Near Zoom CNG Pump, Main Peshawar-Rawalpindi G.T Road, Islamabad.
Cell: 0300 4548461 | 0334 5556009
E-mail: ubsgrouppk@gmail.com | info@ubspakistan.pk

Our Ref: UBS-563-032024/001


Date: 18-03-2024

To
Mr. Ahsen Ali,
MIB Group,
Opp. NUST University, Near Gate 4,
Sector H-13, Islamabad.

Subject: Quotation for the Supply & Installation of Pre-fabricated Roofing in H-


13, Islamabad.

Dear Sir,

With reference to your requirement regarding above mentioned subject. We have the
pleasure to quote our best prices, material, terms & conditions.

MATERIAL SPECIFICATIONS:
1. Roof Sandwich Panel: 50mm thick with top 0.45±0.05mm Pre-Painted Corrugated
steel sheet and bottom 0.45±0.05mm Pre-Painted Formed steel sheet (Prime Quality)
with thermal insulating core of polystyrene 14-16kg/m3 (Flame Retardant).
2. Steel Structure: Comprising of MS Pipe for Rafter/Purlins/Trusses. Entire Steel
Structure will be given one Shop Coat of Red/Lead Oxide Primer & will be painted with
Enamel Paint of good Quality.

COMMERCIAL ACCEPTANCE TERMS:


1. The Price is based on the works mentioned above, and drawings provided by the client
are attached.
2. The Quote/Price is based on the works mentioned above, and the drawings attached
will be consider as full and final. If Any change from the Contractual Parameters is
marked by the Client at the stage of Approval Drawing phase, It shall be charged
according to the latest rate at that time along with the revised timelines. Technical and
Commercial approval from the Client shall be required to incorporate that change in the
project.
3. Validity: This offer is valid for 5 days.
4. Exclusions: Civil Works, Walls, Windows, Doors OR Any other Works in addition to
above are not included in these prices and the scope of work is limited to termination
within the prefabricated building.
5. Lodging/Boarding at Site for Erection/Installation staff will be provided by the client.
6. All services like supply of electricity/generator required for Erection/Installation will be
provided by Client.

Page 1 of 2
United Business Systems (Pvt) Ltd.
Plot No. 1 & 2, Near Zoom CNG Pump, Main Peshawar-Rawalpindi G.T Road, Islamabad.
Cell: 0300 4548461 | 0334 5556009
E-mail: ubsgrouppk@gmail.com | info@ubspakistan.pk

7. All outside services (main connections) like water, electricity, gas, sewerage etc. has to
be provided by Client.
8. Payment Terms:
i. 60% advance at the time of confirm order,
ii. 30% at the time of delivery of material to the site, and
iii. 10% upon completion of work.
9. Completion of Work: Within 40-45 working days after confirm order/down payment.
10. QC/QA will be conducted in our Manufacturing facility prior to dispatch of material
otherwise company QC/QA will be applied and considered to be confirmed.
11. Force Majeure In case of delayed work due to extenuating circumstances such as
natural disaster, bad political situation such as city lock down, war, martial law OR
emergency or law and order situation or country wide strike then extension will be
allowed.

PRICING:
Covered Area Rate Amount
Sr. Description
(Sft) per Sft (PKR)
Prefab Roofing: Size: 60’ x 87’
Consisting of Roof of EPS Sandwich Panels with 5,220
1 1,150/- 6,003,000/-
Steel Structure including Accessories/Hardware (Roof to Roof)
along-with Installation & Transportation charges.

Note: Above mentioned prices are exclusive of all taxes.

Thanking and assuring you of our best professional services.


Yours truly,
For United Business Systems (Pvt) Ltd.

BILAL TAHIR
Sr. Manager Business Development

Page 2 of 2
SPECIFICATIONS:
1. 2" EPS Sandwich Panels for Roofing Only
2. Walls are of Blocks
3. Roofing with Steel Structure
4. Location H-13, Islamabad

60'

STORAGE-1
59'-0"X13'-0"

10'
6'

STORAGE-2
44'-6"X13'-0"

14'

MEETING HALL SECURITY


20'-0"X16'-0" GUARD ROOM
8'-5"X9-6"

WORK STATION
D2
13'-0"X16'-0"
6'

W1

KITCHEN
82'

8'-5"X6'-0"
87'

D1 D2 D2

21'
RECEPTION

MANAGER OFFICE
10'-0"X11'-0" LOBBY AREA
25'-4"X23'-4"
5'

W2

D2
3'

D2
MANAGER OFFICE
10'-0"X11'-0"

W2
5'

6'

D1 D2 D3
4'
4'
D2

PRAYER AREA
12'-0"X10'-0"
EXECUTIVE OFFICE
5'

18'-0"X14'-6"
W2
6'

W1
D3

TOILET
4'-0"X6'-0"
TOILET
ABLUTION AREA
5'-0"X4'-0"
D3 6'-6"X4'-0"

V1 1'-6" V1 4'
W3

12'-0"

You might also like