You are on page 1of 16

IBM Power Systems Virtual Server

Level 2 Quiz Back Next

You must receive a score of 75% or higher on the quiz to complete


the course.

Started on Wednesday, March 13, 2024, 9:53 AM


State Finished
Completed on Wednesday, March 13, 2024, 10:13 AM
Time taken 19 mins 27 secs
Feedback Congratulations, you passed the quiz!

Question 1

Correct

Points out of 1.00

You are working with an industrial client to optimize their


Oracle workloads and recommend Power Virtual Server
(PowerVS) due to the total cost of ownership (TCO) advantage.
Which technology from PowerVS helps reduce Oracle software
licensing costs?

Open-source Monitoring
Shared Processor Pools 
Virtual Machine Optimization

Cloud Object Storage


Question 2

Correct

Points out of 1.00

Back Next

How can Cloud Service Providers (CSPs) and Managed Service


Providers (MSPs) benefit from reselling IBM Power Virtual
Server (PowerVS)?

They can move away from costly management of their 


own data centers.
They can reduce development cost.

They can enable Disaster recovery as a Service (DRaaS)


for their workloads.
They can get a development and test environment for
deployments.
Question 3

Correct

Points out of 1.00

Back Next

The Information Technology (IT) manager for one of your


clients informs you they are looking to move one of their
production workloads that runs on AIX to Skytap on Microsoft
Azure. You know the workload is mission critical and requires
a large core count to run. How should you introduce IBM
Power Virtual Server (PowerVS)?

Explain how PowerVS provides higher availability and 


throughput, and has the high-end servers they need to
run their workload.

Explain how PowerVS doesn't require them to migrate


their AIX 5.2 images to the most current level of AIX,
which Skytap on Microsoft on Azure does.

Explain how Skytap on Microsoft Azure only focuses on


production workloads and would not meet their
development and test requirements.

Explain how PowerVS provides a much friendlier user


experience and can run the same workload for 75% less
cost than Skytap on Microsoft Azure.
Question 4

Incorrect

Points out of 1.00

Back Next

After a presentation to a client about IBM Power Virtual Server


(PowerVS), one of the line-of-business managers approaches
you regarding an application they currently run on their IBM
Power Systems running IBM i in-house. They are looking to
develop new mobile front ends using web services. Which
PowerVS use case could you discuss with the client?

Improve operational cost

Business continuity planning


Modernize

Data center strategy optimization 

Question 5

Correct

Points out of 1.00

IBM Power Virtual Server (PowerVS) was recognized as a


leader in Infrastructure-as-a-Service (IaaS). Which review site
utilizes real client feedback and has rated IBM PowerVS “Best
Feature Set”, “Best Value for Price”, and “Best Relationship” in
2023?

MIT Review

Gartner Peer Insights

TrustRadius 
TechRadar
Question 6

Incorrect

Points out of 1.00

Back Next

The Information Technology (IT) director of a small retail


client is impressed with your proposal to use IBM Power
Virtual Server (PowerVS) for their small production workload.
Compared to the same solution running on Azure Skytap, what
is a reasonable expectation of savings if the client commits to
a 3-year deal using IBM PowerVS?

About 30% 
More than 50%

More than 80%

About the same

Question 7

Correct

Points out of 1.00

Which of the following comparisons between IBM Power


Virtual Server (PowerVS) and Power on Azure Skytap is true?

PowerVS supports IBM i, but Skytap on Azure does not.


PowerVS supports scale out capabilities, but Skytap on
Azure does not.

PowerVS supports AIX, but Skytap on Azure does not.

PowerVS is certified by SAP. Skytap on Azure is not 


certified for SAP HANA and clients are also required to
buy a managed service.
Question 8

Correct

Points out of 1.00

Back Next

During a client meeting with a utility company, the Chief


Technology Officer (CTO) asked you to respond in one
sentence, “why do clients choose IBM Power Virtual Server
(PowerVS)?” How would you respond?

Clients choose PowerVS as it delivers the best overall


value virtual machine for Oracle, SAP, and Salesforce
workloads on cloud.

Clients choose PowerVS as it delivers the best overall


value virtual machine for Microsoft 365, SAP, and IBM i
workloads on cloud.

Clients choose PowerVS as it delivers the best overall


value virtual machine for Microsoft 365, Oracle, and IBM i
workloads on cloud.

Clients choose PowerVS as it delivers the best overall 


value virtual machine for Oracle, SAP, and IBM i
workloads on cloud.

Question 9

Correct

Points out of 1.00

The Director of Information Technology (IT) at one of your


clients is concerned about operational budget challenges and
a recent loss of two key AIX administrators. Which IBM Power
Virtual Server (PowerVS) use case could you discuss with the
client?

Data center strategy optimization

Improve operational cost 

Modernize

Business continuity planning


Question 10

Correct

Points out of 1.00

Back Next

A new seller has joined your IBM Cloud platform team and
asks, "What type of clients should be targeted for IBM Power
Virtual Servers (PowerVS)?" How would you respond?

You should target clients that are looking to migrate away


from their x86 architecture.
You should target clients moving their x86 workloads to
the cloud as those workloads migrate easily to IBM i
running on PowerVS.
You should first target current AIX, IBM i, and Linux 

Power Systems clients that are considering moving


some workloads to the cloud to save money.

You should target existing System z clients since they are


looking to move off the mainframe.
Question 11

Correct

Points out of 1.00

Back Next

A prospective client's Chief Information Security Officer


(CISO) is concerned about the security of running workloads in
any public cloud. Which of the following statements could you
make regarding the security of IBM Power Systems and IBM
Power Virtual Server (PowerVS)?

IBM Power platform provides prevention and early 


detection capabilities, which is the best defense
against cyber attacks, such as Ransomware.
Although IBM Power platform does not provide real-time
monitoring, it is trusted by 80 of Fortune 100 companies.

IBM Power platform has higher number of Common


Vulnerabilities and Exposures (CVEs) versus x86
hypervisors.

IBM Power platform is the most reliable unconventional


server.

Question 12

Correct

Points out of 1.00

Which three operating systems are available on IBM Power


Virtual Server (PowerVS)?

AIX, Linux, and Microsoft Windows

AIX, IBM i, and Linux 

AIX, IBM i, and z/OS

AIX, IBM i, and Microsoft Windows


Question 13

Correct

Points out of 1.00

Back Next

Which cloud computing category classification does IBM


Power Virtual Server (PowerVS) belong to?

Database as a Service (DBaaS)

Platform as a Service (PaaS)

Software as a Service (SaaS)

Infrastructure as a Service (IaaS) 

Question 14

Correct

Points out of 1.00

During a client briefing, a developer suggests using Google


Cloud Platform (GCP) for all their production IBM Power
Systems workloads. Knowing this client has workloads
running on SAP, how should you respond?

While GCP does have SAP HANA certification, GCP are


limited in the number of data centers where that offering
is available.

While GCP does support IBM Power Systems, GCP 


does not have SAP HANA certification. Also, they are
limited in the number of data centers where the
offering is available.

While GCP does have SAP HANA certification, GCP only


has IBM Power available on one data center.

While GCP does support IBM Power Systems, GCP does


not have SAP HANA certification. Also, GCP only has IBM
Power available on one data center.
Question 15

Correct

Points out of 1.00

Back Next

When using IBM Power Virtual Server (PowerVS) for SAP,


which of the following components are managed by IBM?

Middleware

Data

Storage 
Runtime

Question 16

Correct

Points out of 1.00

The Chief Financial Officer (CFO) from a pharmaceutical


company, who oversees their mission critical workloads on
Power Systems, states that replatforming costs are growing
and they are facing challenges. Which program provided by
IBM with prescriptive guidance and incentives for client’s
Hybrid Cloud Journey can you discuss to mitigate the CFO's
concerns?

IBM Cloud Power Virtual Server Migration Acceleration 


Program

IBM Cloud Power Virtual Server Special Bid Program


IBM Cloud Power Virtual Server Configuration
Enhancement Program

IBM Cloud Power Virtual Server Replatforming Facilitation


Program
Question 17

Incorrect

Points out of 1.00

Back Next

A prospective client is looking to migrate their current SAP


workloads running on-premises to a cloud-based solution.
Which of the following are capabilities and benefits of IBM
Power Virtual Servers (PowerVS) for SAP that the client could
leverage?

IBM Power Systems Virtual Servers for SAP is certified 


by SAP for SAP HANA and NetWeaver instances,
supports a bring-your-own-license model for SAP
licenses, and guarantees 1 million SAPs (SAP
Standard Application Benchmark) per virtual server.

IBM Power Systems Virtual Servers for SAP is


aggressively priced, but not certified by SAP for SAP
HANA and NetWeaver production workloads.

IBM Power Systems Virtual Servers for SAP is


aggressively priced, certified by SAP for SAP HANA and
NetWeaver instances, and supports cloud-based SAP
licenses.

IBM Power Systems Virtual Servers for SAP is


aggressively priced, certified by SAP for SAP HANA and
NetWeaver instances, and supports a bring-your-own-
license model for SAP licenses.
Question 18

Correct

Points out of 1.00

Back Next

Which of the following is a valid reason for a client to consider


SAP running on IBM Power Virtual Server (PowerVS)?

PowerVS is the only cloud-based solution.


Migrating to PowerVS can save clients upwards of 80% in
cost savings compared to Amazon Web Services (AWS) or
Microsoft Azure.
IBM Power Systems Virtual Server can reliably scale past
16 petabytes (PB).
PowerVS provides very high performance of SAP 
workloads, which can drive down the number of
required servers, reduce infrastructure and
management costs, and reduce license costs.

Question 19

Correct

Points out of 1.00

How is IBM Power Virtual Server (PowerVS) infrastructure


separated from IBM Cloud infrastructure?

PowerVS and IBM Cloud use the same data centers and
infrastructure but different Site Reliability Engineers
(SRE).
PowerVS and IBM Cloud utilize different data centers in
different cities to enhance availability.
PowerVS utilizes different networks with direct- 
attached storage than IBM Cloud infrastructure.

PowerVS and IBM Cloud infrastructures are not


separated.
Question 20

Correct

Points out of 1.00

Back Next

The Chief Information Officer at a potential client meeting,


mentioned their last Disaster Recovery (DR) test did not go
well, as the testing heavily impacted their production AIX
environment. Which IBM Power Virtual Server (PowerVS) use
case could you discuss with the client?

Modernize
Improve operational cost

Business continuity planning 


Data center strategy optimization

Question 21

Correct

Points out of 1.00

Your client is interested in migrating their Power Linux


workloads to Power Virtual Server (PowerVS). Which IBM
organization will you use to assist in the migration process?

IBM Financing
IBM Technology Expert Labs 

IBM PartnerWorld
IBM Training
Question 22

Correct

Points out of 1.00

Back Next

You are presenting the benefits of migrating to Power Virtual


Server (PowerVS) at a conference. A current Linux on IBM
Power Systems client asks you why they should stay with the
Power Platform. How would you respond?

Migration to PowerVS is too risky, so it’s better to stay


with on-premises Power Systems.
PowerVS is a Platform-as-a-Service (PaaS) offering that
IBM manages up to runtime, making it a good way for
clients to stay with the Power Platform.
PowerVS doesn’t have an identical enterprise stack as the
certified on-premises stack, so client should stay with
Power System on-premises.
Migration to PowerVS can protect client’s existing 
Power investment by moving it to PowerVS instead of
requiring a costly replatform.
Question 23

Correct

Points out of 1.00

Back Next

A client's Chief Information Officer (CIO) has been asked to


put a plan in place to vacate one of their current and aging
data centers. The CIO approaches you with concerns about
obtaining sufficient floor space and power at their other data
centers to support all the IBM Power Systems that are
currently running in the targeted data center. Which IBM
Power Virtual Server use case could you discuss with the
client?

Business continuity planning


Improve operational cost
Datacenter strategy optimization 

Modernize

Question 24

Correct

Points out of 1.00

As of May 2023, how many IBM Cloud data centers support


IBM Power Virtual Server (PowerVS)?

5
18 
30

More than 35
Question 25

Correct

Points out of 1.00

Back Next

Iptor is an international leader in enterprise resource planning


(ERP), supply chain management, and logistics software and
services. What was the primary challenge that IBM Power
Virtual Server (PowerVS) helped to address for Iptor?

Modernize and transition to a true cloud delivery 


model

Requires lab and test environments


Demands extremely high availability from customers

Free up resources from low value tasks to refocus on new


projects

You might also like