International Coal Sales

A Proposal for Coal Mine in Muara Bungo – Jambi


BACKGROUND
• PT Daya Bara Nusantara (Dabara) is a small concession in Muara Bungo, Jambi
province that has coal potential with same charateristics with Nusantara Thermal
Coal (NTC/Ex- Permata Group) coal
• PT Dabara can't mine in their concession area because the land is owned by other
miner in Muara Bungo Regency.
• Nabea become mediator between PT Dabara (Mine Owner) and land owner (H.
Syamsudin – PT Menara Kenalu Prima Megah). Due to the successfull in
negotiation, PT Nabea is appointed to manage the mine (SPK Holder) and land
owner is also appointed as mine contractor inside some area of .
• Coal from Muara Bungo usually targetted for International market :
Vietnam,China,India,Pakistan Etc.
• In this proposal, PT xxxxxxxxxxxxxxxxxx acts as a coal buyer and sells it directly to
end users. Coal cargo can be obtained by: buying FOT at Intermediate Stockpile.
Work Scheme
(Buying FOT)
PT Daya Bara Nusantara
(IUP OWNER)

PT Nabea Bumi Artha PT Menara Kenalu Prima Megah


(Mining & Sales Right) (Mining Contractor)

Intermediate PT Nabea Bumi Artha


Stockpile (Buying FOT)

Hineni Resources PTE LTD


Work Scheme
(Option II – Join Operation)
PT Daya Bara Nusantara
(IUP OWNER)

PT Nabea Bumi Artha PT Menara Kenalu Prima Megah


(Mining & Sales Right)

Appoint
Mine Contractor Coal Production

End Buyer
Hineni Resources Pte Ltd
General Info of PT Daya Bara Nusantara
Company Profile
Name of Company : PT Daya Bara Nusantara
Company Address : Mall Taman Palem, 3rd Floor, Cengkareng, Jakarta 11730
Mining Legality : a. IUP OP no 170/KEP.KA-PTSP/6.1/IUPOP/VIII/2019
b. CNC IUP dated 31/07/2010
c. Environment document No 660/06/UKL-UPL/KPLH/2009
d. Reclamation Guarantee already paid
Share Holder : PT Thorisa Indonesia, 90%
Budianto Halim, 3.1% (Commisioneer)
Go Hengky Setiawan, 3.2% (President Director)
Teddy Susanto, 0.5%
Lendrayanto Mulyo 3.2%
Location Map
• Distance from Mine to Intermediate
Stockpile is 42.05 Km
• Distance from Intermediate Stockpile to
Teluk Bayur port is approx. 305 km
• Distance from Stockpile to Talang Jetty
Jambi is approx. 285 km
Mine Profile
Name of Concession : PT Daya Bara Nusantara
Location : Rantau Pandan – Muara Bungo – Jambi
Area in Hectare : 106 hectares
Number of drillholes & Total Depth : 29 holes, 1560 mtrs (space 50 mtrs)
Number of Coal Seams 4 high ash coal seams (0.13 – 1.3 mtrs) & 1 massive coal
seams (4 mtrs)
Number of mine block 3 (three) blocks
Measured Reserves : 1,060,091 MT
Stripping Ratio : 1 to 8
Distance : 42 km to Intermediate stockpile at Sumatera Highway
285 km from Intermediate stockpile to Talang Duku Port
305 km from Intermediate stockpile to Teluk Bayur Port
Profile of Coal Seam

Coal Quality (Outcrop & Coring)


Parameters Range
- Total Moisture (% ar) : 9.71 – 14.42
- Inherent Mositure (% adb) : 7.10 – 9.94
- Ash Content (% adb) : 2.70 – 15.06
- Volatile Matter (% adb) : 34.57 – 38.84
- Total Sulphur (% adb) : 0.52 – 0.58
- CV adb (Kcal/kg) : 6016 – 7072
- CV ar (Kcal/kg) : 5825 – 6779
Capital Expenditure Buyer
Coal Quality
: PT VISA INDO
: 5800 GAR, Ash max 15%, TS max 1%
(FOB MV) Monthly Sales Volume : 35.000 MT
Exchange Rate (USD 1 = IDR xxx) 14,300
Cost Cost
Parameters
(IDR/MT) (USD/MT)
Basic Price
- FOT Price 630,000.00 44.05
- QC 7,500.00 0.52
- Loss @1.5% 9.450 0.66

Transpotation

Capex = COGS x Sales Volume -Hauling to Teluk Bayur 170,000.00 11.88

Rent Stock Pile


= $ 64.43 x 35,000 MT PBM 85.500 5.94

= $ 2.255.050
Surveyour 12,000 0.83

Overhead & Operational 8,000 0.55

= Idr 32.247.215.000 Total COGS 921.349 64.43


Selling Price 1.215.500 85
Profit 294.151 20.57

Tax

Coal Selling Tax 1.5% (Price) 18.232 1.27


Meditor fee 14.300 1
Fee Funder 114.400 8
Total tax 146.932 10.27
Net Profit 147.290 10.30

Profit Sharing
- Dabara (50%) : 5.15
Nabea (50% ) : 5.15