Professional Documents
Culture Documents
Appoint
Mine Contractor Coal Production
End Buyer
Hineni Resources Pte Ltd
General Info of PT Daya Bara Nusantara
Company Profile
Name of Company : PT Daya Bara Nusantara
Company Address : Mall Taman Palem, 3rd Floor, Cengkareng, Jakarta 11730
Mining Legality : a. IUP OP no 170/KEP.KA-PTSP/6.1/IUPOP/VIII/2019
b. CNC IUP dated 31/07/2010
c. Environment document No 660/06/UKL-UPL/KPLH/2009
d. Reclamation Guarantee already paid
Share Holder : PT Thorisa Indonesia, 90%
Budianto Halim, 3.1% (Commisioneer)
Go Hengky Setiawan, 3.2% (President Director)
Teddy Susanto, 0.5%
Lendrayanto Mulyo 3.2%
Location Map
• Distance from Mine to Intermediate
Stockpile is 42.05 Km
• Distance from Intermediate Stockpile to
Teluk Bayur port is approx. 305 km
• Distance from Stockpile to Talang Jetty
Jambi is approx. 285 km
Mine Profile
Name of Concession : PT Daya Bara Nusantara
Location : Rantau Pandan – Muara Bungo – Jambi
Area in Hectare : 106 hectares
Number of drillholes & Total Depth : 29 holes, 1560 mtrs (space 50 mtrs)
Number of Coal Seams 4 high ash coal seams (0.13 – 1.3 mtrs) & 1 massive coal
seams (4 mtrs)
Number of mine block 3 (three) blocks
Measured Reserves : 1,060,091 MT
Stripping Ratio : 1 to 8
Distance : 42 km to Intermediate stockpile at Sumatera Highway
285 km from Intermediate stockpile to Talang Duku Port
305 km from Intermediate stockpile to Teluk Bayur Port
Profile of Coal Seam
Transpotation
= $ 2.255.050
Surveyour 12,000 0.83
Tax
Profit Sharing
- Dabara (50%) : 5.15
Nabea (50% ) : 5.15