Joint Measurement Certificate for EXCAVATION(HARD ROCK AND NORMAL SOIL)


400kV Loyingalani ­ Suswa transmission linecontractor:HAKIM COMPANY ENTERPRISE GENERAL MALTA FORREST(EGMF)
Pit A Pit B Pit C Pit
Tower Tower
Sl. No type of soil No Type Length Width depth Volume( Length Width depth Volume( Length Width depth Volume( Length
(m) (m) (m) cu.m) (m) (m) (m) cu.m) (m) (m) (m) cu.m) (m)

1 NORMAL 72 LAK 5B 6.05 6.05 4.05 148.240125 6.05 6.05 4.05 148.240125 6.05 6.05 4.05 148.240125 6.05

2 NORMAL 73 HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

3 NORMAL 74 HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

4 NORMAL 76 HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

5 NORMAL 77 HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

6 NORMAL 153 HSK TYPE 2 3.5 3.5 0.8 9.8 3.5 3.5 0.8 9.8 3.5
HARD ROCK 3.5 3.5 3 36.75 3.5 3.5 3.8 46.55 3.5 3.5 3 36.75 3.5
7 NORMAL 154 HSK TYPE 2 3.5 3.5 3.8 46.55 3.5 3.5 3.8 46.55 3.5 3.5 3.8 46.55 3.5

8 NORMAL 155 HSK TYPE 2 3.5 3.5 3.8 46.55 3.5 3.5 3.8 46.55 3.5 3.5 3.8 46.55 3.5

9 NORMAL 156 HSK TYPE 2 3.5 3.5 1 12.25 3.5 3.5 1 12.25 3.5 3.5 0.5 6.125 3.5
HARD ROCK 3.5 3.5 2.8 34.3 3.5 3.5 2.8 34.3 3.5 3.5 3.3 40.425 3.5
10 NORMAL 157 HSK TYPE 2 3.5 3.5 0.8 9.8 3.5 3.5 1 12.25 3.5
HARD ROCK 3.5 3.5 3 36.75 3.5 3.5 3.8 46.55 3.5 3.5 2.8 34.3 3.5
11 NORMAL 104 LAK TYPE 2 4 4 0.5 8
HARD ROCK 4 4 4.55 72.8 4 4 4.2 67.2 4 4 4.55 72.8 4
SUMMARY OF VOLUME EXCAVATED
NORMAL SOIL 2863.6875 m³

1
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ HAKIM COMPANY FEB 2017

DATE:FEBUARY 2017
Pit D Total
Width depth Volume( Volume/
(m) (m) cu.m) Tower

6.05 4.05 148.240125


592.9605

6.05 3.05 111.637625446.5505

6.05 3.05 111.637625446.5505

6.05 3.05 111.637625446.5505

6.05 3.05 111.637625446.5505

3.5 0.8 9.8 29.4


3.5 3 36.75 156.8
3.5 3.8 46.55 186.2

3.5 3.8 46.55 186.2

3.5 0.8 9.8 40.425


3.5 3 36.75 145.775
3.5 1 12.25 34.3
3.5 2.8 34.3 151.9
8
4 4.7 75.2 288

2
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ HAKIM COMPANY FEB 2017

HARD ROCK 742.475 m³

SUB­CONTRACTOR:

12 NORMAL 158 LAK 4 4 0.3 #N/A 4 4 0.3 4 4 0.5 4


HARD ROCK 4 4 4.7 4 4 4.7 4 4 4.05 4

3
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ HAKIM COMPANY FEB 2017

EGMF:

4 0.5
4 4.05

4
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ LISTER COMPANY FEB '17

Joint Measurement Certificate for EXCAVATION(HARD ROCK AND NORMAL SOIL)


400kV Loyingalani ­ Suswa transmission line contractor:LISTER COMPANYENTERPRISE GENERAL MALTA FORREST(EGMF)
Pit A Pit B Pit C Pit D
Tower Tower
Sl. No No type of soil Length Width depth Volume( Length Width depth Volume( Length Width depth Volume( Length
Type
(m) (m) (m) cu.m) (m) (m) (m) cu.m) (m) (m) (m) cu.m) (m)

1 130 NORMAL HSK 5B/TYPE2 6.05 6.05 3 109.8075 6.05 6.05 3 109.8075 3.35 3.35 0.3 3.36675 3.35
HARD ROCK 3.35 3.35 4 44.89 3.35
2 131 NORMAL HSK 5B/TYPE2 6.05 6.05 3 109.8075 6.05 6.05 3 109.8075 3.35 3.35 0.3 3.36675 3.35
HARD ROCK 3.35 3.35 3.8 42.6455 3.35
3 132 NORMAL HSK 5B 6.05 6.05 3 109.8075 6.05 6.05 3 109.8075 6.05 6.05 3 109.8075 6.05

4 133 HARD ROCK HSK TYPE 2 3.35 3.35 3.9 43.76775 3.35 3.35 3.9 43.76775 3.35 3.35 4 44.89 3.35

5 95 NORMAL HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

6 96 NORMAL HSK 5B 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05 6.05 3.05 111.637625 6.05

7 94 HARD ROCK HSK TYPE 2 3.35 3.35 3.8 42.6455 3.35 3.35 3.8 42.6455 3.35 3.35 3.8 42.6455 3.35

SUMMARY OF VOLUME EXCAVATED


NORMAL 1819.81775 m³

5
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ LISTER COMPANY FEB '17

DATE:FEBUARY 2017
Pit D Total
Width depth Volume( Volume/
(m) (m) cu.m) Tower

3.35 2.5 28.05625 251.038


3.35 1.9 21.3227566.21275
3.35 1.2 13.467 236.44875
3.35 3 33.6675 76.313
6.05 3 109.8075 439.23

3.35 4.5 50.50125182.92675

6.05 3.05 111.637625446.5505

6.05 3.05 111.637625446.5505

3.35 3.8 42.6455 170.582

6
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ LISTER COMPANY FEB '17

HARD ROCK 496.0345 m³

SUB­CONTRACTOR:

7
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ LISTER COMPANY FEB '17

EGMF:

8
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ Copy of LISTER COMPANY FEB '17

Joint Measurement Certificate for EXCAVATION(HARD ROCK AND NORMAL SOIL)


400kV Loyingalani ­ Suswa transmission line contractor: ENTERPRISE GENERAL MALTA FORREST(EGMF)
Pit A Pit B Pit C Pit D
Tower Tower
Sl. No No type of soil Length Width depth Volume( Length Width depth Volume( Length Width depth Volume( Length
Type
(m) (m) (m) cu.m) (m) (m) (m) cu.m) (m) (m) (m) cu.m) (m)

1 NORMAL
HARD ROCK
2 NORMAL
HARD ROCK
3 NORMAL

4 HARD ROCK

5 NORMAL

6 NORMAL

7 HARD ROCK

SUMMARY OF VOLUME EXCAVATED


NORMAL 0 m³

9
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ Copy of LISTER COMPANY FEB '17

DATE:FEBUARY 2017
Pit D Total
Width depth Volume( Volume/
(m) (m) cu.m) Tower

10
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ Copy of LISTER COMPANY FEB '17

HARD ROCK 0 m³

SUB­CONTRACTOR:

11
VOLUME QUANTITIES ON THE EXCAVATORS.xlsx ­ Copy of LISTER COMPANY FEB '17

EGMF:

12

You might also like